RESOLVED : That authority be delegated to the Operational Director – Planning, Policy and Transportation, to determine the application in consultation with the Chair or Vice Chair of the Committee, following the satisfactory consultation regarding the prior to commencement of development conditions. Any additional conditions recommended by them to be added to the list below: 1. Standard time limits condition (GR1); 2. Plans condition listing approved drawings (GR1); 3. Submission and agreement of a construction method statement including HRA avoidance measures and timing of development (GR1/GR2/HE1); 4. External facing materials (GR1); 5. Submission and agreement of ground investigation report and remediation strategy (HE8); 6. Submission of validation report (HE8); 7. Foundation design (GR1); 8. Submission and agreement of drainage scheme (HE9); 9. Foul and surface water on a separate system (HE9); 10. Provision of bird nesting boxes (HE1); 11. Trees – methodology and timing of tree removal (HE1); and 12. Protected mammals – pre construction investigation / protective construction techniques (HE1).
Word for word from the decision Halton published for this meeting.Source: moderngov.halton.gov.uk
Report to Development Management Committee, 9 pages
APPLICATION NO: 22/00548/FUL LOCATION: Croda Europe Ltd Foundry Lane Widnes Cheshire WA8 8UB
PROPOSAL: Proposed erection of single storey warehouse WARD: Ditton, Hale Village and Westbank PARISH: None APPLICANT: [name removed] at Croda Europe Ltd
AGENT: [name removed] at NJSR Chartered Architects LLP DEVELOPMENT PLAN: ALLOCATIONS:
The Halton Delivery and Allocations Primarily Employment area Local Plan
Joint Merseyside and Halton Waste Local Plan (2013) DEPARTURE No REPRESENTATIONS: No representations received from the publicity given to the application. KEY ISSUES: Principle of Development, Design and Layout, Highways and Access, Habitat Protection. RECOMMENDATION: Approve subject to conditions. SITE MAP 1. APPLICATION SITE
1.1The Site
The application site consists of a grassed area within the Croda Colloids industrial unit. The wider site is made up of a metal / brick built industrial buildings along with car parks / yards / modular buildings and landscaped areas.
The site is located within a predominantly Industrial area which largely consists of large commercial buildings.
The site is located in a Primary Employment area as allocated by the Halton Delivery and Allocations Local Plan Policies Map
The site is approximately 2km south west of Widnes town centre, and is accessed via Foundry Lane. To the south is the Mersey Estuary
1.2Planning History
The site has an extensive planning history with the more recent relevant applications listed below.
Croda are currently undertaking a number of improvements at the site, the applications below have all been recently approved with the exception of 22/00496 which is pending.
22/00068/FUL- (PER) -Retrospective application for erection of temporary office / welfare cabins
22/00219/FUL- (PER) -Proposed installation of 2 no. prefabricated buildings to the rear aspect of the site, each building having a footprint of 6m x 4m, one building will be fitted out for wash rooms and changing room, whilst the other building will be used as a canteen area
22/00496/FUL- (PCO) -Proposed development comprising new site parking area segregated from the site goods entrance and heavy goods vehicles, together with new gatehouse
22/00364/FUL- (PER) -Proposed erection of temporary office/welfare cabins
22/00372/FUL- (PER) -Proposed construction of substation, gantry, access steps and hard standing a
22/00516/FUL- (PER) -Proposed erection of new temporary storage building over a vacant concrete hard-standing surface 22/00552/FUL- (PER) -Proposed erection of temporary modular building over a vacant concrete hard-standing surface
2. THE APPLICATION
2.1The Proposal
Proposed erection of grey, powder coated, metal panelled warehouse building. The building will provide 1330 m/2 of internal floor space and will feature a pitched roof measuring 11 m to the ridge.
The building would not create additional employment but will enhance operational functionality.
Documentation
The application is accompanied by the associated plans in addition to a Design and Access Statement, Drainage Statement, Transport Statement, Ground Investigation Report and an Ecological Appraisal.
3. POLICY CONTEXT
Members are reminded that planning law requires that development proposals are determined in accordance with the development plan, unless material considerations indicate otherwise.
THE DEVELOPMENT PLAN
3.1Joint Merseyside and Halton Waste Local Plan 2013 (WLP)
The following policies, contained within the Joint Merseyside and Halton Waste Local Plan are of relevance:
o WM8 Waste Prevention and Resource Management
o WM9 Sustainable Waste Management Design and Layout of New Development
3.2Halton Delivery and Allocations Local Plan
o C1 Transport Network and Accessibility - Delivery & Allocations Plan (Mar) 2022
o C2 - Parking Standards - Delivery & Allocations Plan (Mar) 2022
o GR1 - Design of Development - Delivery & Allocations Plan (Mar) 2022
o GR2 - Amenity - Delivery & Allocations Plan (Mar) 2022 o ED2 - Employment Development - Delivery & Allocations Plan (Mar) 2022
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.