RESOLVED THAT: 1. That the minutes of the meeting of the Committee held on 13 th January be confirmed and signed as an accurate record of the proceedings; and 2. That the updated and outstanding actions be noted. The Chairman registered her disappointment regarding the email response from the Transport for London ( TfL ) Head of Borough Partnerships following his presentation on the Mayor’s Transport Strategy at the previous meeting. There was general agreement on this point, particularly the response about the 266 bus route. One councillor also commented with the view that the fact that TfL had no plans to put in parking bays on the slip road of the A40 near Bentworth Road was inadequate.
Word for word from the decision Hammersmith & Fulham published for this meeting.Source: democracy.lbhf.gov.uk
Item Report Title Action Required Lead Current Comments No. Officer / Status (include specific action to be undertaken, expected Membe (complete, completion date and identify areas of concern etc) underway) r 16 February 2009
5. Pilot Recycling Collection Schemes on the Dave Monitoring of the Clem Attlee estate showed Clem Attlee Estate Newma that trade contamination of recycling was n/ limited to the Smart Banks at the two blocks That the Committee receives updates on its Sue closest to the North End Road Market. The recommendations concerning: Harris Smart Banks have been used by traders as there are no recycling facilities at the market. • investigation of means of reducing trade A project to introduce recycling facilities at the waste contamination of household waste on market and to educate traders will start at the estates, such as increased security at sites end of January 2010; where bins were located, and steps to ensure nearby businesses had appropriate Monitoring work to estimate the tonnages of trade waste disposal contracts in place; recycling that could be diverted from landfill was conducted in November 2009. The data is • work be undertaken, in view of the currently being analysed to establish cost unreliability of tonnage data collected in the savings. This will be completed by the end of pilot, to estimate the tonnage likely to be January 2010; diverted from landfill, and possible savings on landfill charges, if more estate rubbish was to be recycled – projected savings could then be used to subsidise estate collection No cross-subsidisation found. Collection costs for recycling; duties being subsumed under general caretaking duties. • work be undertaken to identify the degree of cross-subsidisation between kerbside and non-kerbside properties in relation to waste collection costs, and that, if successfully identified, consideration be given to using The work to operate the recycling schemes on this subsidy for funding participation of the the Clem Attlee estate was incorporated into caretaking service in estate recycling the caretaker’s day to day roll during schemes; December 2009. The work was previously conducted as overtime; • Assessment of the feasibility of caretaker participation in estate recycling schemes as London Remade produced template recycling part of the review of the service, possibly and waste guidance for planners and incorporating such duties into job roles based developers during December 2009. This will on the responses of residents; be incorporated into the existing guidance by the end of April 2010. • Incorporation of conditions requiring recycling facilities to mirror landfill waste Work carried out by London Remade on the facilities as part of the planning process for Clem Atlee estate clearly identifies a number multi unit developments into the LDF, with of ways in which access to recycling may be particular reference to the installation of enhanced in non-kerbside properties, dedicated recycling chutes and capacity; depending upon individual design of each building. However whilst the Clem Atlee work, • Commissioning of a study to establish the which was largely funded by the NDC has most appropriate way by which access to been very useful, a wider survey of all such recycling in non-kerbside properties could be buildings borough wide has potentially improved, given differences in the design significant cost and resource implications. At and location of estates and consequent present there is no budget available to fund a variation in their suitability for different detailed borough wide study. methods of recycling and susceptibility to external waste contamination, in order to gain a clearer picture of the associated cost/benefits associated with wider roll out of the scheme. 7 April 09
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Cleaner and Greener Scrutiny Committee at Hammersmith & Fulham and we tell you when its next papers are published, before the meeting rather than after it.
Work Programme and Forward Plan 2009-101) That the work programme be agreed; 2) That the London Borough of Ealing be invited to participate in any future jo...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.