CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Hammersmith & Fulham
Full Council, Wednesday 30 January 2013 at 7.00pm

South Fulham Riverside Supplementary Planning Document (SPD)

Approved Committee 6 papers

Full Council approved this item on Wednesday 30 January 2013. Below is the council's own wording, with the papers it was decided on.

Item33.1

Resolved

That the South Fulham Riverside Supplementary Planning Document (Appendix 1 of the report, as amended by the addendum circulated at the meeting) be adopted.
Word for word from the decision Hammersmith & Fulham published for this meeting. Source: democracy.lbhf.gov.uk

Follow this further

Built from Hammersmith & Fulham's papers

What the report saysPro

Report to Full Council

Executive summary

1.1Further amendments are required to the SPD (Appendix 1) to accommodate recent changes following discussions with adjoining boroughs and issues raised in the Sustainability Appraisal.

1.2Members are requested to consider the following amendments made to Appendix 1 of the report. The proposed changes/insertions to the text are highlighted and underlined.

2. Page 644

8.6RESIDENTIAL STANDARDS

As detailed in strategic policy H4 Core Strategy all new build housing should be built to “Lifetime Homes” standards, with 10% to be wheelchair accessible or easily adaptable for residents that are wheelchair users. Further advice on achieving Lifetime Homes standards is set out in the Council’s “Access for All” SPD which will be superseded by the Planning Guidance SPD in 2013. All development will need to be energy efficient in line with the requirements of the Code for Sustainable Homes as detailed in Core Strategy Strategic Policy H3.

3. Page 678

11.4TRANSPORT AND HIGHWAY IMPACTS FROM THE REGENERATION ON EXISTING NETWORKS

Rail There are a variety of different modes and routes which can be used to travel to Zone 1 including District Line stations either through West Brompton station via Imperial Wharf, bus routes to Fulham Broadway or walking and cycling to Putney Bridge or Parsons Green station.

4. Page 681

11.6.2 Description of Highway Interventions

Northern Link Road

The Northern Link Road will be facilitated as and when the gas works site is brought forward for regeneration. Given the size of the site, the impact could be significant given the existing low level of trips. Further assessment work will be required to assess any Northern Link Road options and the impact increased traffic would have on nearby junctions, including junctions in RBKC. potential inclusion of nearby junctions.

Additional assessment work will be necessary to understand the impact of additional traffic on junctions in RBKC specifically the Kings Road junctions with Lots Road, Gunter Grove and Edith Grove. Any required mitigation measures will be discussed and agreed with RBKC and funded through developer contributions (Section 106 or CIL).

5. Page 709

14.4INFRASTRUCTURE REQUIRED IN SOUTH FULHAM RIVERSIDE REGENERATION AREA

Figure 14.1 details infrastructure items identified through the DIF Study in South Fulham Riverside regeneration area requiring funding over the next 20 years. Further information regarding indicative phasing and prioritisation of infrastructure items can be found in the DIF study in Appendix 5. The list at 14.1 is not exhaustive and additional infrastructure items that require funding may come to light at a later date as further detailed studies take place. This may include infrastructure items across borough boundaries which are directly linked to the impact from growth in the South Fulham Riverside regeneration area.

(See Figure 14.1)

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Addendum: Amendments to Appendix 1Addendum 39 KB DownloadRead as text
PDF
Appendix 1Appendix 1 46 MB Download
PDF
Consultation Summary ReportAppendix 2 438 KB Download
PDF
Appendix 3Appendix 3 1 MB Download
PDF
EIAAppendix 4 181 KB Download
PDF
South Fulham Riverside Supplementary Planning Document (SPD)Supplementary 77 KB Download

At this meeting

Whole meeting

Who was there

43 of 46 attended
BD
Councillor Belinda DonovanMayor, present
FS
Councillor Frances StaintonDeputy Mayor, present
MA
Councillor Michael AdamCommittee Member, apologies
CA
Councillor Colin AherneCommittee Member, present
AA
Councillor Adronie AlfordCommittee Member, present
HB
Councillor Helen BinmoreCommittee Member, present
NB
Councillor Nicholas BotterillCommittee Member, present
VB
Councillor Victoria Brocklebank-FowlerCommittee Member, present
AB
Councillor Andrew BrownCommittee Member, present
DB
Councillor Daryl BrownCommittee Member, present
JC
Councillor Joe CarlebachCommittee Member, present
MC
Councillor Michael CartwrightCommittee Member, present

All 46 on the meeting page

On this subject at Hammersmith & Fulham

Search all
  1. South Fulham Riverside Supplementary Planning Document (SPD)This decision
  2. South Fulham (West) Clean Air NeighbourhoodApproved
  3. South Fulham Traffic Congestion and Pollution Reduction (TCPR) East Experimental SchemeAgreed
  4. Southern Bell 175 - 177 Fulham Palace Road London W6 8QTApproved
  5. South Fulham Riverside Supplementary Planning Document - transport improvementsApproved

More from Hammersmith & Fulham Full Council

All decisions
MeetingDecisionOutcome
15 Jul 2026 Review of the ConstitutionRESOLVED 1. That Full Council approve the updates to the departmental Registers of Authorities detailed in Appendix 1... Approved Open
15 Jul 2026 Markets and Street Trading Licensing PolicyRESOLVED That Full Council adopt the , at Appendix 1 of the report and agree that it comes into effect on the 1 Augus... Approved Open
15 Jul 2026 Special Motion 2 - 10 Year anniversary of EU referendumRESOLVED This Council recognises the damage that Brexit has done to the economy, businesses and living standards in H... Decided Open
21 May 2026 Election of the MayorRESOLVED That Councillor Sharon Holder was duly elected Mayor of the London Borough of Hammersmith & Fulham for the 2... Decided Open
21 May 2026 Honorary Aldermen and Honorary AlderwomenRESOLVED That the Council confer the title “Honorary Alderwoman of the London Borough of Hammersmith and Fulham” on [... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies