Decision taken by the Cabinet Member on: 16 September 2013 1. That approval be given to carry out consultation on the scheme. 2. To implement, subject to a positive consultation response, the implementation of the highway improvements as proposed in section 5 of this report at a total cost of £99,990. 3. To place the necessary orders for the works with either F M Conway or Colas the Council’s Term Highway contractors.
Word for word from the decision Hammersmith & Fulham published for this meeting.Source: democracy.lbhf.gov.uk
1.1This report details a package of measures for the Cathnor Park Neighbourhood for this financial year. The highway improvements are part of the 2013/14 neighbourhood programme, funded by Transport for London.
1.2Funding has been provided specifically for this project by Transport for London and it has been designed on the basis of maximising value for money, reducing the costs to the council of maintenance and repairs, de- cluttering the street environment, and maximising residents’ parking.
1.3Phase 1 of the works included de-cluttering and accessibility improvements and has already been approved at TTCM on 22 July 2013.
1.4This report details the second phase to be approved. The second phase includes more substantial highway improvement works than the first phase including: • Improve Greenside Road traffic calming, • Reduce Askew Crescent clutter, • Install contra-flow cycle route on Batson Street, • Improve Westville Road pedestrian space.
Recommendations
2.1That approval be given to carry out consultation on the scheme.
2.2To implement, subject to a positive consultation response, the implementation of the highway improvements as proposed in section 5 of this report at a total cost of £99,990.
2.3To place the necessary orders for the works with either F M Conway or Colas the Council’s Term Highway contractors
Reasons for decision
3.1To reduce maintenance costs, improve safety, and improve the streetscape.
4. INTRODUCTION AND BACKGROUND
Background
4.1Cabinet approved expenditure on this scheme within the annual TfL funded programme in March 2013, subject to approval of the detailed proposals as a Cabinet Member’s Decision.
4.2This report outlines the second phase of works proposed in the Cathnor Park Neighbourhood for which Transport for London (TfL) have allocated £140,000. Approximately £40,000 has been allocated to the first phase of works which included de-cluttering, accessibility, and signage works (see TTCM report 22 July 2013). The second phase includes more substantial works than the first phase.
4.3The Cathnor Park Neighbourhood is bounded by Coningham Road to the east, Uxbridge Road to the north, Askew Road to the west, and Goldhawk Road to the south. Strategic Objectives
4.4The proposals detailed in this report aim to meet the objectives of the Mayor’s second Transport Strategy (MTS2) and the borough's Local Implementation Plan (LIP2).
4.5The borough’s seven transport objectives are listed below. The highway improvements detailed in this report are expected to meet numbers 2,3,4,5,6 and 7 (as detailed in LIP2).
1) Support sustainable population and employment growth in the five regeneration areas - Cathnor Park Opportunity Area, North Fulham Regeneration Area, Hammersmith Town and Riverside, South Fulham Riverside and Old Oak Common and Hythe Road area. 2) Improve the efficiency of our road network 3) Improve the quality of our streets 4) Improve air quality in the borough 5) Make it easier for everyone to gain access to transport opportunities 6) Support residents and businesses by controlling parking spaces fairly 7) Reduce the number of people injured and killed on our streets 5. PROPOSAL AND ISSUES
5.1The following improvements are proposed for the area in addition to the de-cluttering, accessibility, and signage works that were approved in phase 1.
Greenside Road Traffic Calming
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Bishops Park Public Toilet ImprovementsDecision Taken by Cabinet Member on 24 June 2016: That Amey be instructed to carry out these works. It is also recomm...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.