Tri Borough / Bi Borough / [BOROUGH NAME] London Borough of Hammersmith & Fulham Draft/Final Internal Audit Report
Final Internal Audit Report [TITLE] [MONTH] [YEAR] Mitie Contract Quality Assurance
March 2017
1 Contents 1 Introduction 3 2 Executive Summary 4 3 Summary of Findings 5 4 Acknowledgements 9 Appendix 1: Management Action Plan 10 Appendix 2: Definition of Assurance Opinions and Recommendation Priorities 22 Appendix 3: Audit Scope and Limitations 23 Appendix 4: Timetable and Distribution List 26
2 1 Introduction As part of the internal audit plan for 2016/17, agreed by the Audit Pensions and Standards Committee, we have undertaken an internal audit of the quality assurance arrangements over the Mitie contract in the London Borough of Hammersmith and Fulham.
A 10 year repairs and maintenance contract with Mitie Property Services UK (Mitie) came into effect on 1 November 2013. This has consolidated eight previous contracts into a single borough wide contract and was projected to save the Council approximately £2 million per year when compared to the previous arrangements on a like for like basis. Mitie’s remit covers Council tenanted properties, Communal areas, Council owned Temporary Accommodation, (limited to hostels only) and Sheltered Accommodation.
The contract with Mitie also incorporates provision for the following checks on the Council’s housing stock that was covered within the scope of this audit: • Annual Gas Safety Checks; • Electrical Installation Condition Reports (EICRs) every five years and on every void property; • Asbestos management within all void properties as part of the void process; and • PAT testing on hostels and sheltered housing.
A Planned Preventative Maintenance Contract (PPM) is also in place and was originally signed as a 3 year contract, which started in or around November 2012. However, in 2015 it was extended for a further year. The PPM contract was intended to “pick up” the outstanding Decent Homes works.
3 2 Executive Summary 2.1 Assurance Opinion
Nil Limited Satisfactory Substantial
Audit Opinion L
2.2Recommendations Summary
The following table highlights the number and categories of recommendations made. The Action Plan at Appendix 1 details the specific recommendations made, as well as the agreed management actions to implement them.
Area of Scope Adequacy Effectiveness Recommendations Raised High Medium Low
Policies and Procedures 0 0 1 Quality Assurance 0 2 0 Framework Responsive Repairs 0 2 1 Major Works 0 1 0 Voids (including asbestos 0 0 0 works) Completion of Safety Checks 0 2 0 Total 0 7 2
Please refer to the Appendix 2 for a definition of the audit opinions and recommendation priorities.
4 3 Summary of Findings
In Internal Audit’s opinion, Limited Assurance can be given to Members, the Chief Executive and other officers, meaning that weaknesses and omissions in the system of controls are such as to put the system objectives at risk, and the level of non-compliance puts the system objectives at risk. The assurance opinion provided is based on sample testing across the entire contract period to date. It should be noted that a number of improvements have been made to the quality assurance framework since October 2016 and these have been reflected in our summary of findings below. We have been unable to fully test the effectiveness of the new or strengthened controls as they are not yet fully embedded. As a result we have also not been able to assess whether the quality of work has improved as a result of these measures being implemented.
The key findings and an assessment of controls are summarised below:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Internal Audit Report: Mitie Contract Quality Assurance 2016-17Report | 814 KB | DownloadRead as text |
Follow Audit Committee at Hammersmith & Fulham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 23 Jun 2026 | Minutes and ActionsRESOLVED That the minutes of the meeting held on 16 March 2026 were agreed as accurate record. | Agreed | Open |
| 23 Jun 2026 | Statement of Accounts 2025/26 UpdateRESOLVED That the Committee noted the verbal update. | Noted | Open |
| 23 Jun 2026 | External Audit Plan (Pension Fund) 2025/26RESOLVED That the Committee agreed to note the External Audit Plan 2025/26 for the London Borough of Hammersmith & Fu... | Agreed | Open |
| 23 Jun 2026 | Annual Report of the Audit Committee for Municipal Year 2025/26RESOLVED That the Committee noted the report. | Noted | Open |
| 23 Jun 2026 | Work Programme for 2026/27RESOLVED That the Committee noted the Work Programme for 2026/27. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.