What was decided
The Committee resolved to authorise the Director of Planning and Property to grant planning permission, subject to no contrary direction from the Mayor for London, completion of a legal agreement, and the conditions in the report and addendum. Report P4, P5
The Committee also authorised the Director, after consulting the Assistant Director of Legal Services and the Chair, to make minor changes to the legal agreement or conditions, including varying, adding or deleting them. Report P6
A long list of conditions was approved covering time limits, approved drawings, hoardings, demolition and construction management, contamination, piling, archaeology, air quality, ventilation, energy, drainage, water infrastructure, noise, lighting, vibration, odour, mechanical gates, balconies, and terrace hours. Report P8, P19, P21, P23, P27, P30, P34, P36, P38, P40, P42, P44, P46, P48, P55, P59, P63, P66, P68, P70, P72, P75, P77, P79, P82, P83, P85, P87, P89, P90, P92, P94, P96, P98, P100, P102, P103, P105, P107, P109, P111, P113, P115, P117
Why
The application is a variation under Section 73 of the original planning permission 2021/03898/FUL, which was dated 27th August 2025. Report P8
Officers recommended approval subject to conditions, a legal agreement, and no contrary direction from the Mayor for London. Report P4, P5
What happens next
The Director of Planning and Property will finalise the Section 106 legal agreement, with the conditions listed in the report and any changes in the addendum. Report P5, P6
If the Mayor for London raises no contrary direction, planning permission will be issued. Report P5
The development must start within three years of 27th August 2025, the date of the original permission. Report P8, P9
Options considered
- Chosen: Approve the variation, subject to legal agreement and conditions. Officer recommendation; Committee followed the recommendation Report P4, P5
Implications
- Legal: Around 45 conditions are attached, covering construction, contamination, archaeology, air quality, noise, energy, drainage, and amenity, plus a Section 106 legal agreement. Report P8, P10, P21, P23, P27, P30, P34, P48, P55, P59, P77, P79, P83, P89, P105
- Environmental: Conditions require air quality and dust monitoring, Ultra Low Emission Zone compliant vehicles, Non-Road Mobile Machinery at Stage IV, sustainable drainage with green and brown roofs, and protection of the river wall. Report P55, P59, P72, P79, P82, P13
- Equalities: Conditions restrict terrace use at the cafe or restaurant to 08:00 to 20:00, deliveries to set hours, and noise from use, to protect neighbouring residents. Report P70, P107, P115, P117
- Other: Deliveries and collections are limited outside peak hours, and the safeguarded wharf is excluded from delivery restrictions. Report P70
- Risk: Contamination conditions require a preliminary risk assessment, site investigation, quantitative risk assessment, remediation method statement, verification report, and possible long-term monitoring before development starts. Report P34, P36, P38, P40, P42, P44
Who and where
- Residents and occupiers of neighbouring properties Report P19, P22, P70, P107, P115, P117
- Future residents of the new development, including residential and commercial uses Report P63, P68, P89, P90
- The safeguarded wharf operator, exempt from delivery hour restrictions Report P70
- Contractors carrying out demolition and construction work Report P21, P23, P27, P30
- Thames Water, consulted on water capacity, piling, and wastewater infrastructure Report P46, P85, P87
Timeline
- 27th August 2025: Date of the original planning permission 2021/03898/FUL that this application varies Report P8
- 3 years from 27th August 2025: Deadline for the development to start, per the time limit condition Report P8, P9
- Before demolition: Demolition Management Plan, Demolition Logistics Plan, and Air Quality Dust Management Plan for demolition must be approved Report P21, P23, P55
- Before construction: Construction Management Plan, Construction Logistics Plan, and Air Quality Dust Management Plan for construction must be approved Report P27, P30, P59
- Before occupation: Ventilation compliance report, zero emission heating details, Ultra Low Emission Strategy, Aerobic Food Digester details, and Thames Water capacity confirmations required Report P66, P68, P72, P75, P85, P87
Plain English for the jargon
- VAR application: Application to vary or remove conditions attached to an existing planning permission, under Section 73 of the Town and Country Planning Act
- SuDS: Sustainable Drainage Systems, features such as rainwater harvesting, permeable paving, and green roofs that manage surface water run-off
- AQDMP: Air Quality Dust Management Plan, setting out measures and monitoring to control dust and emissions during demolition or construction
- NRMM: Non-Road Mobile Machinery, such as excavators and generators used on construction sites, with emissions standards
- ULEZ: Ultra Low Emission Zone, an area in London where vehicles must meet set exhaust emissions standards
- CMP / DMP / DLP: Construction, Demolition, and Demolition Logistics Plans covering how works are managed on and around the site
- ULES: Ultra Low Emission Strategy, a plan to reduce emissions from deliveries and servicing
- AFD: Aerobic Food Digester, equipment that breaks down food waste on site to reduce vehicle trips
- FORS: Fleet Operator Recognition Scheme, a quality standard for commercial vehicle operators
- WSI: Written Scheme of Investigation, a plan for archaeological investigation agreed before development starts