CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Hampshire County Council
Regulatory Committee, Wednesday 16 December 2020 at 10.00am

Robert Mays School West Street Odiham

Agreed Licensing 4 papers

Regulatory Committee agreed this item on Wednesday 16 December 2020. Below is the council's own wording, with the papers it was decided on.

Item232

Resolved

RESOLVED Subject to all parties amending a Section 106 Agreement between Hart District Council and the land owner/s for the land to be retained as ‘open land’, the Director of Economy, Transport and Environment was authorised to GRANT permission subject to the updated conditions listed in Appendix A and any additional conditions required following receipt of additional drainage information and consultation responses. Voting: Favour: 13 Abstentions: 1
Word for word from the decision Hampshire published for this meeting. Source: democracy.hants.gov.uk

Follow this further

Built from Hampshire's papers

What the report saysPro

Report to Regulatory Committee

e

.6 88

88 .5 17 87 .1 73

87 .9 95 0 20 40 60 80 m Mower access and pedestrian New 1.8m high mower link path constructed using

87 .9 7 plastic grass grids to a gradient

3 access gates (to match

87 of 1:12

.5 green mesh fencing)

LP

9 1 +87.70

89 .2 73 89 New 1.2m high mower

.5 66 88 access gates (to match

.0 73

89 existing galvanised mesh

.2 67 fencing)

+88.45 New pedestrian gate with mechanical

88 digipad lock / handle

.9 +88.60

90 Temporary footpath

G AT E 3 Nr Catagory C Ash closure gates - only for trees to be removed short durations at various points in the works

89 .5 (subject to Highway

40 Temporary

90 .4 44 89 Authority approval)

.0 access path + 87.800

88 for school

LP

90 pupils during

.4 58 footpath

90 closure

.0 09 +91.25

1.8m fen ce

91 .0 48 90 .1 15

90 91 .2 81 'No-dig' mower access and New pedestrian gate to

91 .1 62 pedestrian link path constructed replace existing with using plastic grass grids to a mechanical digipad lock /

LP gradient of 1:12 handle

Mi ni so cc er U9 /U +91.00

10 91

s .1 61

91 New pedestrian gate to

.7 95 replace existing with mechanical digipad lock /

92 .0 66 handle +91.80

92 DI N C E

.1 SU O O AS

21 B

SE NC D RE M T AN E HO +91.90

LE +92.10 92 .4 56

92 'No-dig' pedestrian link path

.3 CH

72 AI

constructed using plastic

92 NL

.8 IN

01 KO

grass grids to a gradient of NC ON

1:20 CR ET

LP

91 E

.3 PO

68 ST S

New 1.8m high emergency and general access gates (to match green N mesh fencing) NOTE: NOT ALL SERVICES SHOWN LEVELS IN METRES TO O.S. DATUM 93 .0 18

92 .6 Games Court

05 TA RM AC

92 .0 FO

56 O TP AT H

ON IR GLE AN ON E IR W 93. 40 93 .42

tarm 93 c foo

92 .4 a

.8 72 path

08 93.53 t

93.4293.62 93.67 93 .50

93 .43 3 Nr trees to be removed 93 93 .61 .41 93.72 av 4m high small trees & 2m shrub lp9/ leaning 93.82 Right of way to be protected LP

tarmac .39 93 93.64 93 93 .75 .83 using metal plates and repaired 93

93.78.73

93.832.8 93.87 on completion to match existing 93.

m 94.02 69

grass hig hs 9

93 .48 93 .46 93.93 pw 4.07 mf 94.02 if damaged 94.00 m f g 93.

h spw 93.97 75

hig 93

18 94. 94.13 94

m .81

2.8.20

.60 g 93 94.19 g 93

94.08cha

.6

4 3.5 89

9 nn

26 93 93.

94. el d

.88

grass 93 6

gates 94.08 9

.73 rai

94.26n 93.

.6 5 94

93 74

gates 94

.21 93

av 4m high small 93

.19

00Ø .65

.62 in 93.

dra .64

93 1 tarmac trees & 2m shrub nel .32 61

sw s/a 94.29 n 4 93

3.6cha 94.12 .93

9 cl93.82 O12 bed92.06 39 94. 93

94. .95

g 3 .70

5 93

il92.47 93

mf .62

94. 94 4.79

.89 .65

spw 100Ø 9 .72

.71

igh 10 tarmac tarmac 93 .71

mh 0Ø .22

sw s/a Contractors vehicle .72

49 93

2.844 94. 93

g 150

cl93.65 94. 93.84 slit .76

g Ø

.79 bed90.10 55 94

94. dra

.55

grass access route .74 94.

93 93 94

.51 in .73 .77

56 94

47 .55

.24 g 93. 94.

94 93

.21 .25

e 94 rag .75

tar

ga .48 ma

93 93

94 94.

.69 ing concrete .78

cf .25

93 94.

64 94 65

ramp oo

rac k 94. 94 93

.27 40

tpa .70

7 .78

.7 94

gu93.16 th

93 94.18 93.80 .69

g .72

.19 94 th9

.85 93 .31

94.2094.08 93 garage 3.2

94. .82 4

38 94 2.8 m 2.4 wt9 igh w

94.

hig

.84 94 mh

93 6.2 all

.0 hs

lp10 2 2

pw

94 m

.30 f

93 .74 1.2 cpw

.64 m mf 94 94

94 hig .33 .44

94.19h cha

94 nn

tarmac .35 el d rai

94.92n

94.1293.81 94.

68 94. 86

93 .72 94

av 5m high small Contractors pedestrian .3 7

conc. trees & 2m shrub 94.2

.95 94 .51

ing access link route to 8

pav .10 ck bri 5.13 9 95 CONTRACTOR PARKING compound 94

6 94 .38

. 0 95 AND WELFARE Longwood .02 94 .34

COMPOUND LOCATION f 94 .96 0.6 .7m

98 03 94

94. 93.83 2.8

95. O16 .87

m m

02 spw 95

95. hig

h .71 .05

hig +0

g m irf

hs

m 2.8 93.97 hig

gu93.06 pw 94.

94.29bic

.22 h w 95.

mf 97 ycl

.84

93 Temporary footpath ste .27

all 10 th9 er

94.02p 3 ack

73 .67 94. 1.2 cpw

94 s

closure gates - only for m mf hig h

mh steps gate 93.99 short durations at various tar

cl95.07 4 av 9m high 94.

.0 m

utl 95 94.17 ac

small trees 98

tarmac points in the works 95

5 94.54 4.9 foo .06

9 2m high 94.

tpa

shrub 9

93.82(subject to Highway th

.09 6

95 94.34 95

d tile ps .82 94 .00

94.7594.

ste .10 Authority approval) .94

94.1199

95 .95 93

94 .87

l 94.40 nne 95.

cha ocks gates 93 1 08

.70

bl 94.8

94.8694.21 0.5 .7m

.18 9 ste

.9 +0

93 94 94.35 m irf

p

8 hig

gu92.92 .8 O3 g 94 94.19 hw

04 94.55 95

95. 1.2 cpw a

.98 .08 ll

94 94.68 94.17 94.01 mf .95 2.8

m mf

94.35spw 94 hig m

fwmh grass igh hig

h 94.

.05 mh hs

2.894.83 95

.94 95 94.22 94 av 9m high lp11 pw

.83 m

94 small trees 93.96 93.78 f

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Location planPlan 416 KB Download
PDF
Proposed Highway WorksReport 3 MB DownloadRead as text
PDF
Proposed Site StrategyReport 3.1 MB Download
PDF
Robert Mays School West Street OdihamReport 545 KB Download

At this meeting

Whole meeting

Who was there

16 of 18 attended
PL
Councillor Peter LathamChairman, present
LQ
Councillor Lance QuantrillVice-Chairman, present
CC
Councillor Christopher CarterCommittee Member, present
MC
Councillor Mark CooperLiberal Democrats Spokesperson, present
RC
Councillor Rod CooperCommittee Member, present
JF
Councillor Jane FrankumCommittee Member, apologies
AG
Councillor Andrew GibsonCommittee Member, present
KH
Councillor Keith HouseCommittee Member, present
GH
Councillor Gary HughesCommittee Member, apologies, sent representative
WI
Councillor Wayne IrishCommittee Member, present
AM
Councillor Alexis McEvoyCommittee Member, present
NP
Councillor Neville PenmanCommittee Member, apologies, sent representative

All 18 on the meeting page

More from Hampshire Regulatory Committee

All decisions
MeetingDecisionOutcome
15 Jul 2026 Update to the Validation GuidanceRESOLVED That the Committee note the contents of the draft Planning Application Validation Guidance and approve the d... Noted Open
10 Jun 2026 Monitoring and Enforcement UpdateRESOLVED The Regulatory Committee noted the content of the report. Noted Open
10 Jun 2026 Impending legislation changes for Regulatory Committee including changes to the committee sizeRESOLVED The Regulatory Committee noted the anticipated legislation to come into force on 31 October 2026. The Regula... Noted Open
18 Mar 2026 Silverlake Automotive Recycling Ltd, Botley Road, Shedfield, SouthamptonThat planning permission be REFUSED for the reasons set out in the report of the Director of Universal Services. Refused Open
18 Mar 2026 Monitoring and Enforcement UpdateMembers noted the contents of the report. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies