Resolved
The River Hamble Harbour Management Committee supported the contents of the report to the Harbour Board.
River Hamble Harbour Management Committee decided this item on Friday 11 March 2022. Below is the council's own wording, with the papers it was decided on.
Resolved
The River Hamble Harbour Management Committee supported the contents of the report to the Harbour Board.
2. It is recommended that the River Hamble Harbour Management Committee supports the contents of this report to the Harbour Board.
3. This report summarises the incidents and events which have taken place in the Harbour and addresses any issues currently under consideration by the Harbour Master.
Contextual Information
Patrols
4. The Harbour has been patrolled by the Duty Harbour Master at various times between 0700 and 2230 daily. Mooring and pontoon checks have been conducted daily throughout the period.
Issues 5. Annual Trinity House Audit – An officer of Trinity House will conduct the routine annual visual audit of Aids to Navigation on 7 March to confirm compliance with the River Hamble Harbour Authority’s status as a Local Lighthouse Authority. A report will be made in due course.
6. 2022 Annual Forum – This year’s Annual Forum and draw for tender billets will take place in the Victory Hall Warsash at 1830 on Tuesday 29 March.
7. Resilience over the Recent Storm Period - Infrastructure resilience to three named storms, Dudley, Eunice and Franklin over a four day period was satisfactory. A small yacht, overwhelmed by wave action, sank on her drying mooring but has since been re-floated. There was no environmental impact.
Climate Change and Carbon Mitigation Impact Assessment
8. Hampshire County Council utilises two decision-making tools to assess the carbon emissions and resilience impacts of its projects and decisions. These tools provide a clear, robust, and transparent way of assessing how projects, policies and initiatives contribute towards the County Council’s climate change targets of being carbon neutral and resilient to the impacts of a 2℃ temperature rise by 2050. This process ensures that climate change considerations are built into everything the Authority does.
Climate Change Adaptation. A full assessment of climate change vulnerability was not completed as no decision is required in respect of this report.
Carbon Mitigation. A full assessment of carbon mitigation vulnerability was not completed as no decision is required in respect of this report.
Appendix 1 To Marine Director Report XXXXXXXXXXXXX
Incidents and Events 9.01. 07 Jan. Checked pile lines on a mid-stream moored yacht reported as non- compliant. Pumped out the cockpit of a mid-stream moored yacht. Liaison with owner.
9.0208 Jan. Vessel check on behalf of an owner. Liaison with Hamble Life Boat.
9.0309 Jan. Support to dinghy sailing. Liaison with a safety craft which run over a mooring, cutting it free. Liaison with the Crown Estate Mooring Contractor to arrange replacement.
9.0410 Jan. Specific vessel checks on behalf on the Moorings Officer.
9.0511 Jan. Poor visibility (fog). Light traffic. Specific vessel checks on behalf of the Moorings Officer. Day into night check of lights (Aids to Navigation). Two defects reported to site owners for rectification.
9.0612 Jan. Patrol craft anti-foul test. Attended a Marina where emergency services were in attendance. Two fatalities had been found in a motor vessel alongside. Police and MAIB in attendance. No further Harbour Authority involvement.
9.0713 Jan. Liaison with MAIB and Southampton Patrol to assist in re-location of vessel at 7.06 to Southampton for further investigations. Relocation of vessels displaced by routine dredging operations to their proper moorings.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Addendum to Agenda Item 6 RHHMC 11 Mar 2022Addendum | 8 KB | Download |
PDF |
Marine Director and Harbour Master's Report and Current IssuesReport | 256 KB | DownloadRead as text |
Follow River Hamble Harbour Management Committee at Hampshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 18 Sep 2026 | Marine Director and Harbour Master's Report and Current IssuesThe River Hamble Harbour Management Committee supported the contents of this report to the Harbour Board. | Decided | Open |
| 18 Sep 2026 | Environmental UpdateThe River Hamble Harbour Management Committee noted and supported the remainder of this report. | Noted | Open |
| 18 Sep 2026 | Annual Review of Business PlanThe River Hamble Harbour Management Committee recommended that the River Hamble Harbour Board supports the contents o... | Decided | Open |
| 18 Sep 2026 | Forward Plan for Future MeetingsThe River Hamble Harbour Management Committee noted the report. | Noted | Open |
| 12 Jun 2026 | Marine Director and Harbour Master's Report and Current IssuesRESOLVED The River Hamble Harbour Management Committee supported the contents of this report to the Harbour Board. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.