Resolved
RESOLVED The River Hamble Harbour Board supported the contents of the report and addendum.
River Hamble Harbour Board decided this item on Friday 1 April 2022. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED The River Hamble Harbour Board supported the contents of the report and addendum.
2. It is recommended that the River Hamble Harbour Board supports the contents of this report.
3. This report summarises the incidents and events which have taken place in the Harbour and addresses any issues currently under consideration by the Harbour Master.
Contextual Information
Patrols
4. The Harbour has been patrolled by the Duty Harbour Master at various times between 0700 and 2230 daily. Mooring and pontoon checks have been conducted daily throughout the period. Issues
5. Annual Trinity House Audit – An officer of Trinity House conducted the routine annual visual audit of Aids to Navigation on 7 March to confirm compliance with the River Hamble Harbour Authority’s status as a Local Lighthouse Authority. The written report highlights two known and reported defects resulting from damage incurred during Storm Eunice. Both Harbour Authority Aids are expected to be re-commissioned by the date of the Board meeting. A verbal update will be given. The report is at Annex A.
6. 2022 Annual Forum – This year’s Annual Forum and draw for tender billets will take place in the Victory Hall Warsash at 1830 on Tuesday 29 March.
7. Resilience over the Recent Storm Period - Infrastructure resilience to three named storms, Dudley, Eunice and Franklin over a four day period was satisfactory. A small yacht, overwhelmed by wave action, sank on her drying mooring but has since been re-floated. There was no environmental impact.
Climate Change and Carbon Mitigation Impact Assessment
8. Hampshire County Council utilises two decision-making tools to assess the carbon emissions and resilience impacts of its projects and decisions. These tools provide a clear, robust, and transparent way of assessing how projects, policies and initiatives contribute towards the County Council’s climate change targets of being carbon neutral and resilient to the impacts of a 2℃ temperature rise by 2050. This process ensures that climate change considerations are built into everything the Authority does.
Climate Change Adaptation. A full assessment of climate change vulnerability was not completed as no decision is required in respect of this report.
Carbon Mitigation. A full assessment of carbon mitigation vulnerability was not completed as no decision is required in respect of this report. Appendix 1 To Marine Director Report
Incidents and Events
9.0107 Jan. Checked pile lines on a mid-stream moored yacht reported as non- compliant. Pumped out the cockpit of a mid-stream moored yacht. Liaison with owner.
9.0208 Jan. Vessel check on behalf of an owner. Liaison with Hamble Life Boat.
9.0309 Jan. Support to dinghy sailing. Liaison with a safety craft which run over a mooring, cutting it free. Liaison with the Crown Estate Mooring Contractor to arrange replacement.
9.0410 Jan. Specific vessel checks on behalf on the Moorings Officer.
9.0511 Jan. Poor visibility (fog). Light traffic. Specific vessel checks on behalf of the Moorings Officer. Day into night check of lights (Aids to Navigation). Two defects reported to site owners for rectification.
9.0612 Jan. Patrol craft anti-foul test. Attended a Marina where emergency services were in attendance. Two fatalities had been found in a motor vessel alongside. Police and MAIB in attendance. No further Harbour Authority involvement.
9.0713 Jan. Liaison with MAIB and Southampton Patrol to assist in re-location of vessel at 7.06 to Southampton for further investigations. Relocation of vessels displaced by routine dredging operations to their proper moorings.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Item 7 AddendumAddendum | 111 KB | Download |
PDF |
Marine Director and Harbour Master’s Report and Current IssuesReport | 308 KB | DownloadRead as text |
Follow River Hamble Harbour Board at Hampshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 26 Jun 2026 | Marine Director and Harbour Master's Report and Current IssuesRESOLVED That the River Hamble Harbour Board supported the contents of this report. | Decided | Open |
| 26 Jun 2026 | Environmental UpdateRESOLVED That the River Hamble Harbour Board noted and supported the contents of this report. | Noted | Open |
| 26 Jun 2026 | River Hamble Final Accounts 2025/26 and Forecast Outturn 2026/27RESOLVED · That this report, the statutory accounts and management accounts for 2025/26 be approved by the River Hamb... | Approved | Open |
| 26 Jun 2026 | Review of Harbour DuesRESOLVED That the River Hamble Harbour Board approves an increase in Harbour Dues of 5% for the 2027 calendar year. | Approved | Open |
| 26 Jun 2026 | Forward Plan of Future MeetingsRESOLVED That the River Hamble Harbour Board noted the contents of this report. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.