CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Hampshire County Council
River Hamble Harbour Board, Friday 7 July 2023 at 10.00am

Environmental Update

Decided Committee 2 papers

River Hamble Harbour Board decided this item on Friday 7 July 2023. Below is the council's own wording, with the papers it was decided on.

Item86

Resolved

That the Board note and support the report.
Word for word from the decision Hampshire published for this meeting. Source: democracy.hants.gov.uk

Follow this further

Built from Hampshire's papers

What the report saysPro

Report to River Hamble Harbour Board

Recommendation

2. It is recommended that the River Hamble Harbour Board:

(i) notes and supports the remainder of this report.

Updates

3. M27 Bridge Drainage Following the receipt of Baroness Vere of Norbiton’s response to the Chairman of the River Hamble Harbour Board last year, RHHA officers met with National Highways (NH) to discuss the feasibility study and costing that would be undertaken by Jacobs in relation to the following scope of work that is required to the M27 bridge: Deck waterproofing, Strengthening in relation to abnormal loads, Drainage (transfer of drainage from the downpipes to the side of the bridge, with installation of interceptors for outfalls), Painting, Potentially the replacement of the barriers (to be confirmed after corrosion investigation work). The timeline set out at the meeting was (1) 2022/2023 financial year – Jacobs instructed to undertake the feasibility study and costings for the above elements, (2) 2023/24 financial year – Design, (3) 2024/2025 – Construction. On requesting an update, NH responded that due to the parapet strike on the bridge it has had to divert resources to undertake assessments of the structure which has established some issues which will also require localised strengthening. NH’s current programme (funded) shows completion of the feasibility stage by September 2023. The matter was discussed at length at the last Management Committee and we have agreed to wait until the outcome of the feasibility study is known before deciding on further action.

4. Harbour Office Sea Wall repairs Phase 2 (final stage) of the sea wall has been completed successfully. The concrete refacing has included a textured finish and ecological enhancements, in addition of the reinstatement of the “Vertipools”, all designed to enhance biodiversity. Colonisation will continue to be monitored voluntarily by the research team from Bournemouth University. A ladder and fendering has also been added for ease and safety of operational requirements. RHHA has sought to reduce waste and has offered the eco-form liner for reuse, the first to do so as part of a new ‘library’ scheme for eco-form liner to encourage more construction projects to adopt similar approaches. RHHA was encouraged to submit the project for the CIRIA BIG Biodiversity Awards 2023 https://www.bigchallenge.info/ The project has been entered by RHHA on behalf of Hampshire Country Council (HCC) into 2 categories – ‘Innovation’, and ‘Small habitat <0.5ha’ . Results will be announced in Autumn 2023.

5. Unpermitted development activity Several cases of unpermitted works by 3rd parties have been observed, and these are currently under investigation by RHHA and other regulatory authorities.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Environmental UpdateReport 98 KB DownloadRead as text
PDF
Protecting the Hamble Estuary: Appendix 1Appendix 2.8 MB Download

At this meeting

Whole meeting

Who was there

6 of 6 attended
SW
Councillor Seán WoodwardChairman, present
MF
Councillor Michael FordVice-Chairman, present
KH
Councillor Keith HouseCommittee Member, present
NH
Nikki Hiorns Environmental Management RepresentativeCo-opted Member, present
DJ
David Jobson Recreational Sailing RepresentativeCo-opted Member, present
JS
Jason Scott Marine Director (non voting)Co-opted Member, present

On this subject at Hampshire

Search all
  1. Environmental UpdateThis decision
  2. Environmental UpdateNoted
  3. Environmental UpdateNoted
  4. Environmental UpdateNoted
  5. Environmental UpdateNoted
  6. Environmental UpdateNoted

More from Hampshire River Hamble Harbour Board

All decisions
MeetingDecisionOutcome
26 Jun 2026 Marine Director and Harbour Master's Report and Current IssuesRESOLVED That the River Hamble Harbour Board supported the contents of this report. Decided Open
26 Jun 2026 Environmental UpdateRESOLVED That the River Hamble Harbour Board noted and supported the contents of this report. Noted Open
26 Jun 2026 River Hamble Final Accounts 2025/26 and Forecast Outturn 2026/27RESOLVED · That this report, the statutory accounts and management accounts for 2025/26 be approved by the River Hamb... Approved Open
26 Jun 2026 Review of Harbour DuesRESOLVED That the River Hamble Harbour Board approves an increase in Harbour Dues of 5% for the 2027 calendar year. Approved Open
26 Jun 2026 Forward Plan of Future MeetingsRESOLVED That the River Hamble Harbour Board noted the contents of this report. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies