Resolved
That the Board note and support the report.
River Hamble Harbour Board decided this item on Friday 7 July 2023. Below is the council's own wording, with the papers it was decided on.
Resolved
That the Board note and support the report.
2. It is recommended that the River Hamble Harbour Board:
(i) notes and supports the remainder of this report.
Updates
3. M27 Bridge Drainage Following the receipt of Baroness Vere of Norbiton’s response to the Chairman of the River Hamble Harbour Board last year, RHHA officers met with National Highways (NH) to discuss the feasibility study and costing that would be undertaken by Jacobs in relation to the following scope of work that is required to the M27 bridge: Deck waterproofing, Strengthening in relation to abnormal loads, Drainage (transfer of drainage from the downpipes to the side of the bridge, with installation of interceptors for outfalls), Painting, Potentially the replacement of the barriers (to be confirmed after corrosion investigation work). The timeline set out at the meeting was (1) 2022/2023 financial year – Jacobs instructed to undertake the feasibility study and costings for the above elements, (2) 2023/24 financial year – Design, (3) 2024/2025 – Construction. On requesting an update, NH responded that due to the parapet strike on the bridge it has had to divert resources to undertake assessments of the structure which has established some issues which will also require localised strengthening. NH’s current programme (funded) shows completion of the feasibility stage by September 2023. The matter was discussed at length at the last Management Committee and we have agreed to wait until the outcome of the feasibility study is known before deciding on further action.
4. Harbour Office Sea Wall repairs Phase 2 (final stage) of the sea wall has been completed successfully. The concrete refacing has included a textured finish and ecological enhancements, in addition of the reinstatement of the “Vertipools”, all designed to enhance biodiversity. Colonisation will continue to be monitored voluntarily by the research team from Bournemouth University. A ladder and fendering has also been added for ease and safety of operational requirements. RHHA has sought to reduce waste and has offered the eco-form liner for reuse, the first to do so as part of a new ‘library’ scheme for eco-form liner to encourage more construction projects to adopt similar approaches. RHHA was encouraged to submit the project for the CIRIA BIG Biodiversity Awards 2023 https://www.bigchallenge.info/ The project has been entered by RHHA on behalf of Hampshire Country Council (HCC) into 2 categories – ‘Innovation’, and ‘Small habitat <0.5ha’ . Results will be announced in Autumn 2023.
5. Unpermitted development activity Several cases of unpermitted works by 3rd parties have been observed, and these are currently under investigation by RHHA and other regulatory authorities.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Environmental UpdateReport | 98 KB | DownloadRead as text |
PDF |
Protecting the Hamble Estuary: Appendix 1Appendix | 2.8 MB | Download |
Follow River Hamble Harbour Board at Hampshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 26 Jun 2026 | Marine Director and Harbour Master's Report and Current IssuesRESOLVED That the River Hamble Harbour Board supported the contents of this report. | Decided | Open |
| 26 Jun 2026 | Environmental UpdateRESOLVED That the River Hamble Harbour Board noted and supported the contents of this report. | Noted | Open |
| 26 Jun 2026 | River Hamble Final Accounts 2025/26 and Forecast Outturn 2026/27RESOLVED · That this report, the statutory accounts and management accounts for 2025/26 be approved by the River Hamb... | Approved | Open |
| 26 Jun 2026 | Review of Harbour DuesRESOLVED That the River Hamble Harbour Board approves an increase in Harbour Dues of 5% for the 2027 calendar year. | Approved | Open |
| 26 Jun 2026 | Forward Plan of Future MeetingsRESOLVED That the River Hamble Harbour Board noted the contents of this report. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.