Resolved
RESOLVED Planning permission was GRANTED subject to the update report and the conditions listed in Appendix A Voting Favour: 7 Against: 6
Regulatory Committee decided this item on Wednesday 19 July 2023. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED Planning permission was GRANTED subject to the update report and the conditions listed in Appendix A Voting Favour: 7 Against: 6
1. That planning permission be GRANTED subject to the conditions listed in Appendix A.
2. The application seeks to regularise an existing Waste Transfer Station on- site. The site is a receptor for waste Unplasticized Polyvinyl Chloride (UVPC) window frames and non-ferrous metals for onward recycling.
3. The existing operation is unauthorised and the site has a planning consent for residential purposes. However, the existing use, as a Waste Transfer Station (WTS) has been operating on-site since 2018. The application seeks to rationalise the existing use to include setting the compound back from the highway, thereby reducing its visual impact. This will free up space within the site to allow for the more efficient manoeuvring of vehicles on-site and the provision of additional landscaping. In addition, the proposals provide for additional acoustic fencing/noise mitigation measures in recognition of the potential impact on neighbouring residential uses.
4. Retrospective works are required for the change of use of the land to provide a WTS with associated car parking, the provision of a modular building and a weighbridge. Planning consent is required for operational development to include the compound and means of enclosure. Consent has previously been granted for the formation of new access to the highway (application F/14/74534).
1 5. The proposed development is not an Environmental Impact Assessment (EIA) development under the Town & Country Planning (Environmental Impact Assessment) Regulations 2017.
6. Key issues raised are: • Need for the development; • Proximity to residential areas; • Visual and amenity impact of the proposal; • Impact on the highway; and • Unauthorised use and retrospective nature of the planning application.
7. The proposal has been referred to the Regulatory Committee for consideration at Member request.
8. A committee site visit by Members took place on 22nd May 2023 in advance of the proposal being considered by the Regulatory Committee.
9. On balance, it is considered that proposed development is considered acceptable. It is in compliance with relevant policy advice, comprises a sustainable form of development, represents an improvement on the existing use of the site in terms of visual impact and highway safety. Whilst it is recognised that a ‘special need’ for the development in this location has not been fully demonstrated, the proposal and it mitigation is makes the development acceptable. The proposal also provides the opportunity to place conditions on any consent in order to mitigate impact in respect of neighbouring residential properties, the neighbouring highway network and on the character of the area.
10. It is therefore recommended that planning permission be granted subject to the conditions listed in Appendix A.
The Site
11. The application site measures approximately 0.10 hectares (ha) and is located on the urban edge of West End at Unit 1 Westwood, Botley Road.
12. The site was formerly occupied by a bungalow and its curtilage, which has since been demolished as a consequence of fire damage. A mobile home has been provided (within blue line), whilst a second mobile home has been placed to the rear of the application site.
13. The site is located in a semi-commercial/ semi-residential area with the Ageas Bowl cricket ground and conference centre (and associated third party businesses) located to the south, a Holiday Inn hotel to the west and
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Appendix BAppendix B | 660 KB | Download |
PDF |
Appendix CAppendix C | 236 KB | Download |
PDF |
Appendix DAppendix D | 444 KB | Download |
PDF |
Appendix EAppendix E | 6.7 MB | Download |
PDF |
Westwood, Unit 1, Botley Road, West EndReport | 565 KB | DownloadRead as text |
Follow Regulatory Committee at Hampshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 15 Jul 2026 | Update to the Validation GuidanceRESOLVED That the Committee note the contents of the draft Planning Application Validation Guidance and approve the d... | Noted | Open |
| 10 Jun 2026 | Monitoring and Enforcement UpdateRESOLVED The Regulatory Committee noted the content of the report. | Noted | Open |
| 10 Jun 2026 | Impending legislation changes for Regulatory Committee including changes to the committee sizeRESOLVED The Regulatory Committee noted the anticipated legislation to come into force on 31 October 2026. The Regula... | Noted | Open |
| 18 Mar 2026 | Silverlake Automotive Recycling Ltd, Botley Road, Shedfield, SouthamptonThat planning permission be REFUSED for the reasons set out in the report of the Director of Universal Services. | Refused | Open |
| 18 Mar 2026 | Monitoring and Enforcement UpdateMembers noted the contents of the report. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.