Regulatory Committee, Wednesday 13 September 2023 at 10.00am

Alton Materials Recovery Facility, A31 Alton

Agreed Licensing 7 papers

Regulatory Committee agreed this item on Wednesday 13 September 2023. Below is the council's own wording, with the papers it was decided on.

Item133

Resolved

RESOLVED Planning permission was GRANTED subject to the conditions listed in Appendix A, the update report and completion of a section 106 agreement to secure restrictions to prevent Heavy Good Vehicle U-turns on the A31 at Froyle. Voting Favour: 12 (unanimous)
Word for word from the decision Hampshire published for this meeting. Source: democracy.hants.gov.uk

Follow this further

Built from Hampshire's papers

What the report saysPro

Report to Regulatory Committee

Recommendation

1. That planning permission be GRANTED subject to the conditions listed in Appendix A and completion of a section 106 agreement to secure restrictions to prevent Heavy Good Vehicle U-turns on the A31 at Froyle.

Executive summary

2. The application refers to an existing Materials Recovery Facility (MRF) and Waste Transfer Station (WTS) located to the south of the A31 and to the east of Holybourne and Alton.

3. The existing facility is well-established is a safeguarded under Policy 26 (Safeguarding – waste infrastructure) of the Hampshire Minerals Waste Plan (2013) (HMWP).

4. The proposals seek to replace the on-site MRF to provide an Anaerobic Digester (AD). The on-site WTS will be retained.

5. The rationale for the development, in part, due the construction and operation of a recently consented MRF at Chickenhall Lane, Eastleigh (resolved planning permission CS/22/92463). Once completed the existing WTS at the application site will become redundant (at which point construction work can take place on-site).

6. The works comprise the demolition of part of existing building and the provision of the following:

1 • Waste reception, pre-treatment and odour abatement facility; • Pasteurisation plant; • Anaerobic digestion and buffering tanks; • Gas treatment facility (also referred to as the Gas to Grid facility); • Combined Heat and Power Units; and • Emergency Flare.

7. The existing eastern end of the MRF and WTS building would be partially demolished to enable the construction of the AD tank area. The remaining building would be re-purposed to provide a WTS and the AD waste reception and processing activities. Gas treatment, CHP engines, flare and a further digestate tank would be located to the north of the site. Other elements of the existing infrastructure that would be retained and repurposed include: • Weighbridges and Weighbridge Office; • Administration and Welfare Building; • Internal roads, hardstanding’s, and car parks; • Fire tank and pumps; • Drainage and services; and • Landscaping.

8. There would be a below ground connection to the local gas distribution network.

9. The existing building is some 15.2 metres (m) in height. The replacement AD tanks will be 12.97m above ground level. The overall height of the proposed development will 2.23m lower than the maximum height of the existing building.

10. The proposed AD facility will use kerb site and commercial organic waste products and not crops grown specifically for this purpose.

11. The AD process converts organic waste to provide biomethane gas primarily for export into the local gas distribution network. A by-product of the process is digestates which are then used as fertilizer.

12. A below ground pipe connecting the AD Facility to the local gas main (which crosses the eastern section of the site) would be constructed, along with a kiosk containing apparatus for connection into an existing gas main that runs

2 through the eastern portion of the site. Two CPH engines are proposed, which will use biogas to generate electricity to be used on-site to provide heat, to maintain optimum operating temperatures and power for the AD process.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Alton Materials Recovery Facility, A31 AltonReport 1.1 MB DownloadRead as text
PDF
Appendix BAppendix B 2.3 MB Download
PDF
Appendix CAppendix C 866 KB Download
PDF
Appendix DAppendix D 1 MB Download
PDF
Appendix EAppendix E 948 KB Download
PDF
Appendix FAppendix F 173 KB Download
PDF
Appendix GAppendix G 2.8 MB Download

At this meeting

Whole meeting

Who was there

14 of 20 attended
SS
Sheena SayerOfficer, expected
PL
Councillor Peter LathamChairman, present
LQ
Councillor Lance QuantrillVice-Chairman, present
LB
Councillor Lulu BowermanCommittee Member, present
SB
Councillor Steven BroomfieldCommittee Member, apologies
MC
Councillor Mark CooperLiberal Democrats Spokesperson, present
RC
Councillor Rod CooperCommittee Member, apologies
CD
Councillor Christopher DonnellyCommittee Member, apologies
MF
Councillor Michael FordCommittee Member, present
PH
Councillor Pal HayreCommittee Member, present
KH
Councillor Keith HouseCommittee Member, present
AJ
Councillor Adam JackmanCommittee Member, present

All 20 on the meeting page

More from Hampshire Regulatory Committee

All decisions
MeetingDecisionOutcome
15 Jul 2026 Update to the Validation GuidanceRESOLVED That the Committee note the contents of the draft Planning Application Validation Guidance and approve the d... Noted Open
10 Jun 2026 Monitoring and Enforcement UpdateRESOLVED The Regulatory Committee noted the content of the report. Noted Open
10 Jun 2026 Impending legislation changes for Regulatory Committee including changes to the committee sizeRESOLVED The Regulatory Committee noted the anticipated legislation to come into force on 31 October 2026. The Regula... Noted Open
18 Mar 2026 Silverlake Automotive Recycling Ltd, Botley Road, Shedfield, SouthamptonThat planning permission be REFUSED for the reasons set out in the report of the Director of Universal Services. Refused Open
18 Mar 2026 Monitoring and Enforcement UpdateMembers noted the contents of the report. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies