Resolved
RESOLVED The River Hamble Harbour Board noted and supported the contents of this report.
AI summaryRiver Hamble Harbour Board noted and supported an environmental update covering oil spill readiness, sewage incidents, M27 bridge drainage plans, and habitat projects on the estuary between June and November 2025.
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Resolved
RESOLVED The River Hamble Harbour Board noted and supported the contents of this report.
2. It is recommended that the River Hamble Harbour Board:
(i) notes and supports the remainder of this report.
Updates
Oil Spill Preparedness & Response 3. Under the Merchant Shipping (Oil Pollution Preparedness, Response and Co- operation) Regulations 1998, the River Hamble Harbour Authority’s Regulation 3 status was changed from Category (a) to Category (d), confirmed by the Maritime & Coastguard Agency (MCA) on 15 September 2025. Annual turnover is below the threshold for Category (a), however, the Secretary of State considers the harbour to meet Category (d) criteria because it is in an area of significant environmental sensitivity or where oil discharge could cause significant economic damage. RHHA will maintain a contract with an accredited Oil Spill Response Organisation (OSRO) due to these environmental sensitivities. This contract was renewed with Adler & Allen until August 2028. 4. RHHA undertook its required 3-yearly Tier 2 Incident Management Exercise, split into a separate practical boom deployment exercise (11 June 2025) and a Tabletop exercise (10 September 2025). The Regulator (MCA) was present to observe both, and a representative of the marinas was present at the tabletop. The objectives, all achieved, were to validate the Oil Spill Contingency Plan and ensure its practical effectiveness, to train key personnel in Tier 2 oil spill response, to test safe towing techniques using new patrol vessel, to assess the effectiveness of a new boom layout using funnelling for containment, and to test the operation of the Incident Command Centre.
Sewage pollution – Incidents and future improvements (for information only) 5. On 14 June 2025, a burst in the rising main from School Lane Hamble Wastewater Pumping Station (WPS) to Hook Park WPS discharged wastewater into the River Hamble at Warsash, affecting nearby saltmarsh and a public footpath. Southern Water responded with 34 tankers to manage wastewater, hay bales for flow control and screening, and shut down key pumping stations. Two more brief discharges occurred on 15 June due to peak flows. The damaged pipe was excavated, replaced, tested, and restored by 18 June. CCTV confirmed no further damage, and site reinstatement and footpath repairs began on 20 June. Daily river sampling (14–20 June) showed no impact on nearby designated bathing or shellfish waters. And saltmarsh assessment on 16 June was sent to the Environment Agency and Natural England. Updates were provided by SW to the relevant authorities, including RHHA, although this was initially hard to obtain. RHHA officers liaised with Hampshire County Council’s Emergency Planning & Resilience Team to request the provision of public health messaging. Also see section 8 below. 6. A second, similar incident took place for approximately 24 hours commencing evening of 27 August. RHHA only found through its own observation the next morning and was one of many dissatisfied stakeholders left seeking information not provided by Southern Water. RHHA understands that this incident is currently under investigation by the Environment Agency. 7. Southern Water engineers have started survey work around the River Hamble as part of its £2.42m work to reduce storm overflows from School Lane outfall near Hamble Copse. Solutions will include investment in technology enabling real-time control of flows between the pumping stations and utilising storage within the network https://www.southernwater.co.uk/latest-news/popular-hampshire-tourist- spot-to-benefit-from-new-storm-overflow-reduction-scheme/
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Environmental UpdateReport | 144 KB | DownloadRead as text |
Follow River Hamble Harbour Board at Hampshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 26 Jun 2026 | Marine Director and Harbour Master's Report and Current IssuesRESOLVED That the River Hamble Harbour Board supported the contents of this report. | Decided | Open |
| 26 Jun 2026 | Environmental UpdateRESOLVED That the River Hamble Harbour Board noted and supported the contents of this report. | Noted | Open |
| 26 Jun 2026 | River Hamble Final Accounts 2025/26 and Forecast Outturn 2026/27RESOLVED · That this report, the statutory accounts and management accounts for 2025/26 be approved by the River Hamb... | Approved | Open |
| 26 Jun 2026 | Review of Harbour DuesRESOLVED That the River Hamble Harbour Board approves an increase in Harbour Dues of 5% for the 2027 calendar year. | Approved | Open |
| 26 Jun 2026 | Forward Plan of Future MeetingsRESOLVED That the River Hamble Harbour Board noted the contents of this report. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.