Resolved
That the report be noted.
Haringey Well-Being Partnership Board (HSP) noted this item on Monday 2 March 2009. Below is the council's own wording, with the papers it was decided on.
Resolved
That the report be noted.
To update Well-being Partnership Theme Board on the HariActive Programme
This programme draws together existing and new sport & physical activity projects. The programme is underpinned by clear baseline positions established via the Active People Survey and the Active Places Survey, and supported by a number of local proxy indicators split across six themes.
The Community Sport and Physical Activity Network (CSPAN) will provide the governance for the projects. This work contributes to HSP and LAA targets which report to and are monitored by the Wellbeing Partnership Board
• N1 8 Adult sport and physical activity participation • N1 6 Participation in volunteering • N1 119 (local target) Overall health and wellbeing • N1 137 (local target) Healthy lifestyle expectancy • N1 56 Childhood obesity target • N157 Children and Young People’s participation in high quality PE and sport
Introduction
HariActive seeks to embrace existing sport & physical activity projects whilst also developing a bespoke brand and campaign. KPI 1 is the main target and this underpins the NI 8 stretch target shared with the PCT to achieve 26.9% 3 x a week adult participation by 2010. The activity to achieve the basket of targets below also contributes to outcomes for a number of other LAA and local targets (as detailed in the summary) which report to the Wellbeing Theme Board/Haringey Strategic Partnership.
There are 7 KPI’s (KPI 1 is further sub divided) developed by Sport England as well as a target specifically focussed on young people (developed by the Youth Sports Trust) that HariActive will target; in the first instance by 2010:
1 of 4 KPI1 Increasing sport and physical activity participation KPI1a Increasing sport & physical activity KPI1b Increasing sport & physical activity KPI1c Decreasing numbers not participating at all KPI2 Increasing sports based volunteering KPI3 Increasing sports club membership KPI4 Increasing sports based tuition KPI5 Increasing sport based competitive opportunities KPI6 Increasing satisfaction with local sports provision KPI7 Increasing the percentage of school children participating in 5 hours of sport per week KPI8 Active Places – increasing the number of residents living within 20 minutes walk time of a quality assured leisure facility
KPI Targets, Baseline and Performance
Targe 05/06 07/08 KPI no. Indicator t KPI 1 26.9% Participating three times a week 22.9% 19.8% KPI 1a 10% Participating twice a week 7% na KPI 1b 15% Participating once a week 12% na KPI 1c 45% Not participating at all 49% na KPI 2 5% Volunteering in active recreation for at least 2.7% 3% one hour a week KPI 3 26% Membership of sports clubs 23% 21.4% KPI 4 21% Receiving tuition or coaching 19.9% 20.6% KPI 5 15% Taking part in organised competitive sport 11.2% 10.1% KPI 6 66% Very or fairly satisfied with sports provision 62.2% 63.1% in the local area KPI7 50% Increasing the percentage of children na 25% participating in 5 hours of sport per week KPI8 95% Increasing the number of residents living 74.2% 90.2% within 20 minutes walk time of a quality assured leisure fcaility
Comment
It should be noted that although the 07/08 performance presents challenges in terms of meeting the targets the variations from 05/06 are not considered statistically significant. Regarding the London picture – Haringey’s performance is matched by an overall drop in participation generally.
Theme Groups/Proxy Indicators/Performance Measurement
The CSPAN will have six sub (theme) groups reporting to it. Each sub group is responsible for a number of projects and for the achievement of the relevant KPIs. A number of proxy indicators have or will be developed to judge the direction of travel between Active People Surveys.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Summary of Hariactive ReportMinutes | 56 KB | DownloadRead as text |
Follow Haringey Well-Being Partnership Board (HSP) at Haringey and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 5 Oct 2010 | MinutesThat the minutes of the meeting held on 10 June 2010 be confirmed as a correct record. | Decided | Open |
| 5 Oct 2010 | 'Equity and Excellence: Liberating the NHS' - White Paper 12 July 2010That the report be noted. | Noted | Open |
| 5 Oct 2010 | NHS Haringey and Council: Approach to Performance ManagementThat the report be noted. | Noted | Open |
| 5 Oct 2010 | Safeguarding Adults: Update on Implementation PlanThat the report be noted. | Noted | Open |
| 5 Oct 2010 | Quarter 1 Performance Summary / Exception ReportThat the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.