Resolved
RESOLVED That Listed Building Consent application HGY/2013/1170 be approved subject to conditions. 1.The works hereby permitted shall be begun not later than the end of three years from the date of this consent. Reason: In order to comply with the provisions of Section 18 of the Planning (Listed Buildings and Conservation Areas) Act 1990. 2. The development hereby permitted shall not be undertaken before a contract for the carrying out of the works of redevelopment of the site has been made and full planning permission has been granted for the redevelopment for which the contract provides. Reason: To safeguard the historic fabric and the architectural character and appearance of this Listed Building. 3. A detailed and itemised schedule of works, methodology statement, detailed plans and drawings as appropriate in respect of the following, shall be submitted to and approved by the Local Planning Authority before the relevant part of the work is begun. a. repair, reinstatement and any additional works affecting the fabric of the listed building such as structural investigations b. Detail of the proposed structural investigations to verify the loading capacity of the building and any concealed damage to the structure c. Further details of how the new structure would be integrated with the existing structure d. Details regarding the alterations to the existing structure to accommodate the new lift and stair cores and removal of the rear mezzanine floor level area e. All doors, windows and rainwater goods (which shall be a high quality metal) f. Details of all repair works, including concrete repairs, brick and mortar repairs, faience repairs g. Details of all decorative profiles on walls, ceiling surfaces, handrails, floor finishes, doors and fanlights as applicable h. Location and finish of all mechanical ventilation, louvers, and communal satellite i . Further details regarding levelling of internal floor heights and related works to flats 131, 133, 141 and 143 including bricking up of existing windows and installation of the ‘ sunpipe ’ system. The development shall be implemented in accordance with the approved details or samples of materials. Reason: In order to safeguard the special architectural or historic interest of the building consistent with Policy 7.8 of the London Plan 2011, Policy SP12 of the Haringey Local Plan 2013 and Policy CSV4 of the Haringey Unitary Development Plan 2006. INFORMATIVE: In dealing with this application the Council has implemented the requirement in the National Planning Policy Framework to work with the applicant in a positive and proactive way. We have made available ... view the full minutes text for item 55.