RESOLVED · That application HGY/2014/0389 be approved subject to conditions 1. Development hereby authorised must be begun not later than the expiration of 3 years from the date of this permission, failing which the permission shall be of no effect. Reason: This condition is imposed by virtue of the provisions of the Planning & Compulsory Purchase Act 2004 and to prevent the accumulation of unimplemented planning permissions. 2. Notwithstanding the information submitted with the application, the development hereby permitted shall only be built in accordance with the following approved plans: list the plans Reason: To avoid doubt and in the interests of good planning. Samples of materials to be used in conjunction with the proposed development for all the external surfaces of buildings hereby approved, areas of hard landscaping and boundary walls shall be submitted to, and approved in writing by, the Local Planning Authority before any development is commenced. Samples should include sample panels or brick types and a roofing material sample combined with a schedule of the exact product references. Reason: In order for the Local Planning Authority to retain control over the exact materials to be used for the proposed development and to assess the suitability of the samples submitted in the interests of visual amenity consistent ... view the full minutes text for item 5.
Word for word from the decision Haringey published for this meeting.Source: www.minutes.haringey.gov.uk
Proposal: Erection of a second floor extension to an existing flat, increasing in size from a 1 bed to a 2/3 bed unit
Applicant: [name removed]: Private
Case Officer Contact: Sarah Madondo
Site Visit Date: 25/03/2014
Date received: 05/02/2014 Last amended date: 11/08/2014
Drawing number of plans: 121045-C1,C3 and C4
1.1The application is coming to committee as an objection was made by a councillor under the previous scheme of delegation 1.2 SUMMARY OF KEY REASONS FOR RECOMMENDATION • The principle of the development is acceptable • The impact of the development on neighbouring residential amenity is acceptable • Standard of accommodation is acceptable • There would be no significant impact on parking
OFFREPC Officers Report For Sub Committee 2. RECOMMENDATION
That the Committee resolve to GRANT planning permission and that the Head of Development Management is delegated authority to issue the planning permission and impose conditions and informatives.
Conditions
1) Development begun no later than three years from date of decision 2) In accordance with approved plans 3) Materials submitted for approval
Informatives
1) CIL liable 2) Hours of construction 3) Party Wall Act 4) Naming & numbering
In the event that members choose to make a decision contrary to officers’ recommendation members will need to state their reasons.
OFFREPC Officers Report For Sub Committee TABLE OF CONTENTS 3.0 PROPOSED DEVELOPMENT AND SITE LOCATION DETAILS 4.0 CONSULATION RESPONSE 5.0 LOCAL REPRESENTATIONS 6.0 CONSULTATION 7.0 MATERIAL PLANNING CONSIDERATIONS 8.0 RECOMMENDATION 9.0 APPENDICES: Appendix 1: Consultation Responses Appendix 2 : Plans and images Appendix 3 : Daylight & Sunlight Report
OFFREPC Officers Report For Sub Committee 3.0 PROPOSED DEVELOPMENT AND LOCATION DETAILS
3.1Proposed development
3.1.1 Permission is sought for the creation of a second floor extension to create additional space for first floor flat to form a 2 bedroom maisonette with a roof terrace.
3.2Site and Surroundings
3.2.1The site is located at 1A & 1B Candler Street. The premises fronts onto Candler Street and is located at the rear of 600 Seven Sisters Road. The host property is a flat roofed two storey building which stands flush on to the pavement and slightly forward of the houses on this northern side of Candler Street. A similar scaled building is found on the opposite side of the road (Volvo garage).
3.2.2 The prevailing development in the vicinity is in the form of two storey terrace dwellings with three storey terrace buildings found fronting Seven Sisters Road (including no. 600), which have ground floor commercial and upper floor residential uses.
3.4Relevant Planning and Enforcement history
HGY/2005/1291 REF 23-08-05 - Construction of a two storey two bedroom dwelling.
HGY/2013/2359 GTD 20-01-14 - Use of first floor as a self-contained flat
4. CONSULTATION RESPONSE
4.1The following were consulted regarding the application:
Internal:
1) Transport
Although the proposed unit will not benefit from any on-site parking provision, the site does not fall within an area that has been identified within the Haringey Council UDP as that suffering from a high level of on-street parking pressure. The proposed development is unlikely to result in any significant impact upon the surrounding road network or parking demand within the vicinity of the site. Therefore, there are no highways and transportation objections to the above application.
5. LOCAL REPRESENTATIONS
5.1The following were consulted: Ward Councillors LBH Transportation Team Neighbouring properties
102 letters sent out and re-consultation on amended plans OFFREPC Officers Report For Sub Committee 5.2 The number of representations received from neighbours in response to notification and publicity of the application were as follows:
Objection from 1 Candler Street
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.