RESOLVED · That planning application HGY/2014/ 3096 be approved subject to conditions. 1. The development hereby authorised must be begun not later than the expiration of 3 years from the date of this permission, failing which the permission shall be of no effect. Reason: This condition is imposed by virtue of the provisions of the Planning & Compulsory Purchase Act 2004 and to prevent the accumulation of unimplemented planning permissions. 2. The development hereby authorised shall be carried out in accordance with the plans and specifications submitted to, and approved in writing by the Local Planning Authority. Reason: In order to avoid doubt and in the interests of good planning. 3. The external materials to be used for the proposed development shall match in colour, size, shape and texture those of the existing building. Reason: In order to ensure a satisfactory appearance for the proposed development, to safeguard the visual amenity of neighbouring properties and the appearance of the locality consistent with Policy 7.6 of the London Plan 2011, Policy SP11 of the Haringey Local Plan 2013 and Saved Policy UD3 of the Haringey Unitary Development Plan 2006. 4. The applicant/ Developer is required to submit a Construction Management Plan (CMP) and Construction Logistics Plan (CLP) for the local authority’s approval prior to construction work commencing on site. The Plans should provide details on how construction work would be undertaken in a manner that disruption to traffic and pedestrians on White Hart Lane and the residential roads surrounding the site is minimised. It is also requested that construction vehicle movements should be carefully planned and coordinated to avoid school drop-off and collection times and the AM and PM peak periods. Reason: To reduce congestion and mitigate any obstruction to the flow of traffic on the transportation and highways network and in the interests of highway ... view the full minutes text for item 6.
Word for word from the decision Haringey published for this meeting.Source: www.minutes.haringey.gov.uk
The proposal involves the construction of a single classroom extension located at the first floor level over part of an existing first floor terrace.
The proposal is an acceptable development to provide an additional classroom on site whilst not compromising the usability of the outdoor amenity space on site. The proposal would not harm the amenities of surrounding neighbours nor have a harmful impact on the adjoining MOL. Given the above, this application is recommended for APPROVAL.
GRANT PERMISSION subject to conditions: • Time limit • In accordance with approved plans • Materials to match
2.3TABLE OF CONTENTS
1.0PROPOSED SITE PLAN 2.0 IMAGES 3.0 SITE AND SURROUNDIINGS 4.0 PLANNING HISTORY 5.0 RELEVANT PLANNING POLICY 6.0 CONSULTATION 7.0 RESPONSES 8.0 ANALYSIS / ASSESSMENT OF APPLICATION • Design and Appearance; • Residential Amenity; • Transportation. 9.0 HUMAN RIGHTS 10.0 EQUALITIES 11.0 CONCLUSION 12.0 RECOMMENDATION APPENDIX 1 – Consultation Responses APPENDIX 2 – Plans
3.0SITE AND SURROUNDS
3.1Woodside High School is situated on White Hart Lane, close to the junction with Wolves Lane. The site is bounded to the north by White Hart Lane, to the east and west by Metropolitan Open Land/ playing fields and to the south by residential properties on Stirling Road. To the north of White Hart Lane is New River Sports Centre and Community Centre. The existing High School campus comprises of a mix of existing buildings, from 1 – 4 stories, with a range of age and condition. The school was originally known as White Hart Lane School and the original campus buildings were developed in the 1960’s.
4.0PLANNING HISTORY
4.1HGY/2000/0795 –Erection of two temporary classrooms (Portacabin) on existing football pitch – Approved 25/07/00
Planning Officer Delegated Report 4.2 HGY/2000/0672 – Demolition of existing technology block, removal of prefabricated block used for language studies. Erection of new two storey technology and language block with covered link to main buildings. Lobby extension to dining area with covered walkway access to the main building. – Approved 09/08/00
4.3HGY/2004/0843 – Erection of a two storey building to be used as an adult education centre with associated single storey crèche building adjacent – Approved d 28/06/04
4.4HGY/2008/0238 – Retrospective planning application for retention of portacabin Ultima Building to be used as an exam hall during refurbishment to existing facilities – Approved 18/03/08
4.5HGY/2008/0655 - Redevelopment of Woodside High School, to comprise demolition of part of existing central school block, erection of new two storey block fronting White Hart Lane, new three storey block at rear of site, covered walkways, parking and landscaping, and re-cladding of existing Block C. To incorporate Woodside High School, William C Harvey and Moselle Special Schools. – Approved 10/06/2008
4.6HGY/2010/0800 - Demolition of existing two storey teaching block and construction of new two storey teaching block with associated hard and soft landscaping - Approved 14/06/10
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.