RESOLVED ยท That planning application HGY/2015/2650 be approved subject to conditions. 1. The development hereby authorised must be begun not later than the expiration of 3 years from the date of this permission, failing which the permission shall be of no effect. Reason: This condition is imposed by virtue of the provisions of the Planning & Compulsory Purchase Act 2004 and to prevent the accumulation of unimplemented planning permissions. 2. The development hereby authorised shall be carried out in accordance with ... view the full minutes text for item 60.
Word for word from the decision Haringey published for this meeting.Source: www.minutes.haringey.gov.uk
2.1That the Committee resolve to GRANT planning permission and that the Head of Development Management is authorised to issue the planning permission subject to the conditions and informatives set out below.
Conditions 1) Development begun no later than three years from date of decision 2) In accordance with approved plans
Planning Sub-Committee Report 3) Materials submitted for approval 4) Construction management plan 5) Highway works 6) Travel Plan 7) Cycle parking 8) Electric vehicles 9) Biodiversity mitigation 10) Solar PV 11) BREEAM 12) Green/brown roofs 13) Landscaping 14) Boiler emissions 15) Air quality 16) Considerate contractors 17) Nitrogen dioxide levels 18) Contaminated land 1 19) Contaminated land 2 20) Source protection zone 21) Verification report 22) Contamination monitoring and maintenance 23) Contamination not previously identified 24) No infiltration 25) Foundation designs 26) Flood Risk Management Plan 27) London Underground safeguarding 28) Detailed surface water drainage scheme 29) Lighting
Informatives
1) Co-operation 2) CIL liable 3) Hours of construction 4) Street Numbering 5) Sprinklers 6) Thames water 1 7) Thames water 2 8) Thames water 3 9) Thames water 4 10) Thames water 5 11) Verification report 12) Asbestos
Planning Sub-Committee Report CONTENTS
3.0PROPOSED DEVELOPMENT AND SITE LOCATION DETAILS 4.0 CONSULATION RESPONSE 5.0 LOCAL REPRESENTATIONS 6.0 MATERIAL PLANNING CONSIDERATIONS 7.0 RECOMMENDATION
APPENDICES: Appendix 1: Consultation Responses Appendix 2: Plans and images
Planning Sub-Committee Report 3.0 PROPOSED DEVELOPMENT AND LOCATION DETAILS
3.1Proposed development
3.1.2This is an application for a new build refuse facility to replace the existing depot facilities at Ashley Road. This would consist of a building containing a double storey workshop and offices, salt store, refueling and washing facilities, storage and a parking area on permeable paving. The building would be finished in aluminium cladding with a continuous band of engineering brick at plinth level. There building would be 2 storeys with a green and brown roof and solar pv. The propsal would provide parking spaces for 53 HGVs, 26 SGVs, 29 LGVs and 56 staff spaces 3 of which would be accesible. Construction would take place in 2 phases. The first phase of the proposal would release land for the Sports Facilities proposed as part of the existing Harris Academy on the site of the former Lea Valley Techno Park with the second phase following later.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.