RESOLVED · That planning application HGY/2016/1574 be approved and the Head of Development Management delegated authority to issue the planning permission and impose conditions and informatives. · That Listed Building consent HGY/2016/1575 be approved and the Head of Development Management delegated authority to issue the Listed Building Consent and impose conditions. Conditions TIME LIMIT 1. The development hereby authorised must be begun not later than the expiration of 3 years from the date of this permission, failing which the permission shall be of no effect. Reason: This condition is imposed by virtue of the provisions of the Planning & Compulsory Purchase Act 2004 and to prevent the accumulation of unimplemented planning permissions. IN ACCORDANCE WITH THE APPROVED PLANS 2. The development hereby authorised shall be carried out in accordance with the plans and specifications submitted to, and approved in writing by the Local Planning Authority. Reason: In order to avoid doubt and in the interests of good planning. CONSTRUCTION MANAGEMENT PLAN 3. The applicant is required to submit a Construction Management Plan (CMP) and Construction Logistics Plan (CLP) for the local authority’s approval 3 months (three months) prior to construction work commencing on site. The Plans should provide details on how construction work (inc. demolition) would be undertaken in a manner that disruption to traffic and pedestrians on Alexandra Palace Way and the roads surrounding the site is minimised. Construction vehicle movements shall be carefully planned and co-ordinated to avoid the AM and PM peak periods, the plans must also include measures to safeguard and maintain the operation of the local highway network including the east car ... view the full minutes text for item 8.
Word for word from the decision Haringey published for this meeting.Source: www.minutes.haringey.gov.uk
REPORT FOR CONSIDERATION AT PLANNING SUB-COMMITTEE
1. APPLICATION DETAILS Reference No: Ward: Alexandra HGY/2016/1574 (planning permission) HGY/2014/1575 (listed building consent) Address: Alexandra Palace Alexandra Palace Way N22 7AY
Proposal 1: Planning Permission for alterations to north west corner of existing building 'West Yard Site' including reinstatement of existing arches, refurbishment of north west tower, construction of two storey building within the west wing, creation of two new openings in east elevation, creation of an ancillary office at 5th floor level, and installation of new gates and hard surfacing (amended description)
Proposal 2: Listed Building Consent for alterations to north west corner of existing building „West Yard Site‟ including reinstatement of existing arches, refurbishment of north west tower, construction of two storey building within the west wing, creation of two new opening in east elevation, creation of an ancillary office at 5th floor level, and installation of new gates and hard surfacing (amended description)
Applicant: Alexandra Palace and Park Charitable Trust (APPCT)
Ownership: LB Haringey
Case Officer Contact: Christopher Smith
Site Visit Date: 08/01/2015
Date received: 16/05/2016
Last amended date: 9/11/2016
Drawing numbers of plans: See Recommendations
1.1This application is reported to the Planning Sub-Committee because it is major development
OFFREPC Officers Report For Sub Committee 1.2 SUMMARY OF KEY REASONS FOR RECOMMENDATION
The proposals consist of alterations to the north west corner of existing building „West Yard Site‟ including reinstatement of existing arches, refurbishment of north west tower, construction of two storey building within the west yard area including the creation of an ancillary office at 5th floor level, creation of new openings in the east elevation, refurbishment of stonework and window joinery, and installation of new gates and hard surfacing.
Members are informed that this is a revised scheme following a resolution of Members to grant planning permission and listed building consent, subject to the signing of a legal agreement, for a similar scheme on the site. The legal agreement has not been signed. Further details of the precise revisions are detailed further in this report.
Planning Permission:
The principle of the proposal is supported by development plan policy and will facilitate the restoration of the existing Listed Building whilst facilitating more efficient occupation of this part of the Palace site. The principle has also been established by the previous scheme which has a resolution to grant planning permission and listed building consent subject to the signing of a legal agreement. The legal agreement has not been signed.
The proposal is considered to be appropriate within the Metropolitan Open Land (MOL) as it would not impact on the openness of the MOL or result in urban sprawl, would not impact on protected species and through proposed mitigation measures is considered to make a positive contribution to the protection, enhancement and management of biodiversity and the Site of Importance for Nature Conservation (SINC).
The less than significant harm to the Listed Building has been given significant weight and is considered to be outweighed by the public benefits from restoring the building and facilitating a more efficient and viable use in this part of the Palace site. There is no harm to the Conservation Area or Registered Park and the proposal would therefore satisfy the statutory duties set out in Sections 66 and 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990, and accord to the design and conservation aims and objectives as set out in the NPPF, London Plan Policies 7.4, 7.5 and 7.6, saved UDP Policy UD3, Local Plan Policies SP11 and SP12 and SPG2 „Conservation and archaeology‟.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.