Resolved
RESOLVED that planning permission be granted subject to conditions and signing of s106 Legal Agreement.
Planning Sub Committee agreed this item on Monday 10 April 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that planning permission be granted subject to conditions and signing of s106 Legal Agreement.
Planning Sub Committee
REPORT FOR CONSIDERATION AT PLANNING SUB-COMMITTEE
1. APPLICATION DETAILS
Application: HGY/2016/3932 Ward: Tottenham Hale
Address: 1 Station Square, Station Road, N17 9JZ
Proposal: Demolition of existing buildings and erection of a building providing 434 sq.m. (GEA) of commercial floorspace (Class A1/A3), 128 residential units (117 shared ownership units) (Class C3), landscaped amenity space, cycle parking and all structural and associated works.
Applicant: Micuber Estates Limited
Ownership: Private
Case Officer Contact: James Hughes
Site Visit Date: 7th December 2016
Date received: 28th November 2016 Last Amended: 27th March 2017
Plans and Drawing Number: Site Location Plan 1711-G100-XP-AL-001; Site Plan – Existing 1711-G100-XP-AL-002; Site Plan - Proposed 1711-G100-P-AL-001; Proposed Ground Floor Plan 1711-G200-P-00-001; Proposed Mezzanine Floor Plan 1711-G200- P-M1-001; Proposed First Floor Plan 1711-G200-P-01-001; Proposed Second Floor Plan (Typical 02-06) 1711-G200-P-02-001; Proposed Seventh Floor Plan 1711-G200- P-07-001; Proposed Eighth Floor Plan 1711-G200-P-08-001; Proposed Ninth Floor Plan (Typical 09-19) 1711-G200-P-09-001; Proposed Twentieth Floor Plan (Typical 20- 21) 1711-G200-P-20-001; Proposed Roof Floor Plan 1711-G200-P-RF-001; Proposed Section AA 1711-G200-S-AA-001; Proposed Section BB 1711-G200-S-BB-001; Proposed Section CC 1711-G200-S-CC-001; Proposed Section DD 1711-G200-S-DD- 001; Proposed Section EE 1711-G200-S-EE-001; Proposed Section FF 1711-G200-S- FF-001; Existing North East Elevation 1711-G200-XE-NE-001; Existing East Elevation 1711-G200-XE-E-001; Existing South-East Elevation 1711-G200-XE-SE-001; Proposed North East Elevation 1711-G200-E-NE-001; Proposed East Elevation 1711- G200-E-E-001; Proposed South East Elevation 1711-G200-E-SE-001; Proposed South West Elevation 1711-G200-E-SW-001; Proposed South Elevation 1711-G200- E-S-001; Details of North East Elevation 1711-G251-D-TY-001 P8/9 12351979v1; Details of South East Elevation 1711-G251-D-TY-002 Bridging Foundation Over Tunnels 143292-RDG-XX-FN-PL-S-2005 Bridging Foundation Sections 143292-RDG-
Planning Sub-Committee Report XX-XX-SE-S-2006, 1711-G200-001 – Updated Waste Plan, 1711-G200-P-M1-001 – Updated Waste Plan.
Documents: Planning Statement; prepared by NLP; Design and Access Statement, prepared by John McAslan + Partners; Flood Risk Assessment and Outline Drainage Strategy, prepared by Ramboll; Preliminary Risk Assessment, prepared by Ramboll Environ; Noise Impact Assessment, prepared by Ramboll Environ; Air Quality Assessment, prepared by Ramboll Environ; Environmental Wind Assessment, prepared by Ramboll Environ; Historic Environment Assessment, prepared by Ramboll Environ; Statement of Community Involvement, prepared by Belgrave Communications; Transport Assessment, prepared by WSP Parsons Brinckerhoff; Residential Travel Plan, prepared by WSP Parsons Brinckerhoff; Construction Logistics Plan, prepared by WSP Parsons Brinckerhoff; Delivery and Servicing Plan, prepared by WSP Parsons Brinckerhoff; Daylight Sunlight Assessment, prepared by NLP; Heritage, Townscape and Visual Impact Assessment, prepared by NLP; and Sustainable Design, Energy and Construction Statement, prepared by WSP Parsons, Consultation Response prepared by NLP (Parts 1 and 2), Wind and Microclimate report prepared by RWDI.
1.1This application is before Planning Sub-Committee because it is major development and is required to be reported to the Sub-Committee under the Council‟s constitution.
1.2The application has been referred to the Mayor of London as it is development which comprises or includes the erection of a building that is more than 30 metres high and is outside the City of London.
1.3SUMMARY OF KEY REASONS FOR RECOMMENDATION
The scale of development will provide a significant number of new homes that will help to meet the Borough and London‟s wider housing needs in the future. The scheme will be an early catalyst adding to the regeneration of Tottenham Hale.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
1 STATION SQUARE, STATION ROAD, N17 9JZMinutes | 852 KB | DownloadRead as text |
PDF |
Consultee ResponsesAppendix 1 | 5.4 MB | Download |
PDF |
GLA Stage 1 ReportAppendix 2 | 111 KB | Download |
PDF |
Plans and ImagesAppendix 3A | 1.3 MB | Download |
PDF |
Plans and ImagesAppendix 3B | 1.5 MB | Download |
Follow Planning Sub Committee at Haringey and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 5 Oct 2026 | MINUTESRESOLVED To confirm and sign the minutes of the Planning Sub Committee held on 7 th September as a correct record. | Decided | Open |
| 5 Oct 2026 | Update on major proposalsRESOLVED To note the report. | Noted | Open |
| 5 Oct 2026 | Applications determined under delegated powersRESOLVED To note the report. | Noted | Open |
| 27 Jul 2026 | MINUTESRESOLVED To confirm and sign the minutes of the Planning Sub Committee held on 8 th June as a correct record. In rela... | Noted | Open |
| 27 Jul 2026 | Update on major proposalsRESOLVED To note the report. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.