CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Haringey
Cabinet Member Signing, Friday 15 October 2021 at 1.30pm

Philip Lane CS1 - Cycling Improvement scheme, N15

Approved Executive 5 papers

Cabinet Member Signing approved this item on Friday 15 October 2021. Below is the council's own wording, with the papers it was decided on.

Item40

Resolved

RESOLVED t hat the Cabinet Member for Environment, Transport and the Climate Emergency approves the implementation of the Philip Lane CS1 cycling improvement scheme N15 which includes safe crossing provision for cyclists at: (a) Philip Lane’s junction with Jansons Road and Napier Road; and (b) Philip Lane’s junction with Arnold Road and Town Hall Approach; and improvements along Philip Lane between these two junctions, as set out under 6.7 below. Reasons for decisions The Council is required to consider the feedback received during the Statutory Notification period, in particular any objections to proposals, prior to proceeding to implementation. The proposals are aimed at providing safe crossings for cyclists using the CS1 route but will also benefit pedestrians. Alternative options considered None.
Word for word from the decision Haringey published for this meeting. Source: www.minutes.haringey.gov.uk

Follow this further

Built from Haringey's papers

What the report saysPro

Report to Cabinet Member Signing, 2 pages

Public Notice PROPOSED IMPROVEMENTS TO CYCLE SUPER HIGHWAY 1 – PHILIP LANE N15 The Haringey (Free Parking Places, Loading Places and Waiting, Loading and Stopping Restrictions) (Amendment No.***) Order 202* The Haringey (Charged-For Parking Places) (Amendment No. ***) Order 202*

T31

Notice is hereby given that the Council of the London Borough of Haringey, under section 23 of the Road Traffic Regulation Act 1984 proposes to alter the Pedestrian Crossing facilities, under section 65 Highways Act 1980 to convert an existing footway to shared use footway cycleway, under section 90a and 90c of the Highways Act 1980 and the Highways (Road Humps) Regulations 1999 to introduce a raised speed table and to make the above mentioned Orders under sections 6, 45, 46, 49, 51 and 124 of and Part IV of Schedule 9 to the Road Traffic Regulation Act 1984, as amended.

The proposed alterations to pedestrian crossings includes: 1. The existing Zebra Crossing on Philip Lane N15 outside No.124 is to be removed. 2. A new parallel crossing is proposed on Philip Lane N15 located outside No.128 with the centre being located approx. 5 metres west of the western kerb line of Napier Road N15. 3. A new parallel crossing is proposed on Philip Lane N15 located outside No. 42 with the centre being located approx. 10 metres south east of the eastern kerb line of Arnold Road N15. 4. A new Zebra Crossing allowing pedestrians to cross the cycleway element within the shared use area located approx. 7.4 metres west of the western kerb of Town Hall Approach Road N15. 5. The existing Zebra Crossing on Town Hall Approach Road N15 is proposed to be converted to a Parallel Crossing with the centre being located approx. 13.23 metres south east of the southern kerb line of Philip Lane N15. The crossings would be supported with associated zig-zag markings, on which vehicles would be prohibited from stopping at all times, which would be placed on the carriageway either side of the crossing, extending up to approximately 15 to 25 metres from either side.

The following footway locations are proposed to be converted to shared use footway/cycleway: 1. Footway on south side of Philip Lane N15 from the western kerb line of Town Hall Approach Road N15, west for 19.7 metres and the west side of Town Hall Approach Road N15 from the southern kerb line of Philip Lane N15, south for 21.5 metres. 2. Footway on south side of Philip Lane N15 from the eastern kerb line of Jansons Road N15, east for 35 metres and the east side of Jansons Road N15 from the southern kerb line of Philip Lane N15, south for 7 metres. 3. Footway on north side of Philip Lane N15 from the western kerb line of Napier Road N15, west for 11.9 metres and the west side of Napier Road N15 from the northern kerb line of Philip Lane N15, north for 7.6 metres.

To introduce a raised speed table at the following location Location Type Height Width Plateau/length Front/Rear Slope gradient Arnold Road N15 – From Tapered 75mm Full width of 9.5 1:20 the northern kerb line of edge raised carriageway Philip Lane N15, north for speed table 12.5 metres.

The existing raised speed table on Philip Lane N15 outside No.128 will be extended 5 metres west.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
NOP: SiteMinutes 2 pages DownloadRead as text
PDF
Philip Lane CS1: Cycling Improvement scheme, N15Minutes 5 pages Download
PDF
Philip Lane CS1 Consultation plan vYGS4-A3Minutes 1 pages Download
PDF
Philip Lane Consultation area 2021Minutes 1 pages Download
PDF
Philip Lane Phase2: Public Consultation FINALv3 SS 02072021AMinutes 2 pages Download

At this meeting

Whole meeting
40Philip Lane CS1 - Cycling Improvement scheme, N15This decision

On this subject at Haringey

Search all
  1. Philip Lane CS1 - Cycling Improvement scheme, N15This decision
  2. 97~99 Philip Lane N15Agreed

More from Haringey Cabinet Member Signing

All decisions
MeetingDecisionOutcome
2 Nov 2026 Deaf Outreach Services ContractDECLARATIONS FOR THIS ITEM: NONE Decided Open
28 Oct 2026 Administrative amendment to Merchant Acquirer Re-ProcurementRESOLVED 1. To note the administrative error in the original report referring to Global Pay and Global Payments; 2. T... Noted Open
20 Oct 2026 Approval of Additional Expenditure and Final Payment to Accora Limited reportDECLARATIONS FOR THIS ITEM: NONE RESOLVED The Cabinet Member for Adults and Health: 1. Approved the variation of cont... Approved Open
16 Oct 2026 Approve Funding from Arts Council England to Haringey Music Service for the North London Music HubDECLARATIONS OF INTEREST MADE FOR THIS ITEM: None Decided Open
13 Oct 2026 Filming at meetingsThe notice of filming at meetings was noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies