RESOLVED – (Unanimously) that planning permission be granted subject to the following conditions: 1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2. The development hereby permitted shall be carried out in accordance with the following approved plans: 8239/P1B, 8239/P2A, 8239/P3D, 8239/P4, 8810/1 Issue: A, 8511/01 Issue: A 3. Prior to construction following demolition of existing buildings, tree protective measures and fencing in line with BS5837:2012 "Trees in relation to design, demolition and construction- Recommendations" shall be installed to the front of the rear boundary of the site and retained for the lifetime of the construction period. 4. Post demolition of the existing structures on site and prior to excavation or construction a maintenance & management plan and detailed design drawings for the entire drainage system should be submitted in writing to and approved by the Local Planning Authority to ensure the designed system takes into account design standards of those responsible for maintenance. The management plan should cover the following: a) Clearly state who will be responsible for managing all aspects of the surface water drainage system, including piped drains, and the appropriate authorities should be satisfied with the submitted details. b) Written contractual evidence that these responsibility arrangements will remain in place throughout the lifetime of the development should be provided to and approved in writing by the Local Planning Authority. c) Surface water runoff should be limited to 2.5 l/s for all rainfall events including the 1 in 100 (plus climate change). Evidence of this (in the form of hydraulic calculations) should be submitted with the detailed drainage drawings. The hydraulic calculations should take into account the connectivity of the different surface water drainage features. d) Detailed designs should include information on how surface water flows exceeding the capacity of the surface water drainage features will be managed safely. e) Evidence that Southern Water have agreed to the proposed discharge rate and connection should be submitted in writing to and approved by the Local Planning Authority. 5. Prior to occupation of the development, evidence (including photographs) should be submitted in writing to and approved by the Local Planning Authority showing that the drainage system has been constructed as per the final agreed detailed drainage designs as per condition 4. 6. The development shall not be occupied until a turning space for vehicles has been provided and ... view the full minutes text for item 83.
Word for word from the decision Hastings published for this meeting.
Source: hastings.moderngov.co.uk