Resolved
That planning permission be granted, with the following condition that there be no working permitted on Saturdays and an additional condition relating to the mitigation and compensation for the bats and nesting birds identified on site:- 1 A01 – Time Limit for commencement (full permission) Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2 A07 – Development in accordance with approved plans Reason: To ensure adherence to the approved plans in the interests of a satisfactory form of development. 3 B01 – Samples of external materials Reason: To ensure that the materials harmonise with the surroundings 4 C02 – Approval of Details a) the details of the position and means of constructing the external buttresses proposed in the structural engineer’s report; b) architectural details of window sections, eaves, verges and barge boards at a scale of 1:1 or 1:5, relating to the converted barn and the new dwelling; c) details of the proposed finishes of all external joinery relating to the converted barn and the new dwelling; d) trade details of the type of roof-light to be utilised; e) detailed specification of all rainwater guttering and downpipes; Reason: To safeguard the character and appearance of this building of (special) architectural or historical interest. 5 C12 – Repairs to match existing Reason: To safeguard the character and appearance of this building of (special) architectural or historical interest. 6 D02 – Archaeological Survey and recording Reason: To ensure the archaeological interest of the site is recorded 7 E16 – Removal of Permitted Development Rights Reason: To preserve the setting of the converted barn 8 F16 – Restriction of hours during construction Reason: To protect the amenity of local residents 9 G01 – Details of Boundary Treatments Reason: In the interests of visual amenity and to ensure dwellings have satisfactory privacy. 10 G04 – Landscaping scheme (general) Reason: In order to protect the visual amenities of the area 11 G05 – Implementation of landscaping scheme (general) Reason: In order to protect the visual amenities of the area 12 G09 – Retention of trees/hedgerows Reason: To safeguard the amenity of the area 13 Prior to the commencement of the development hereby approved, details of the means of constructing the new driveway in a manner designed to protect the existing boundary trees and hedgerow from unacceptable damage shall ... view the full minutes text for item 56.