Resolved
RESOLVED That planning permission be granted subject to the following conditions: 1 A02 (Time limit for submission of reserved matters (outline permission)) Reason: Required to be imposed by Section 92 of the Town and Country Planning Act 1990. 2 A03 (Time limit for commencement (outline permission) Reason: Required to be imposed by Section 92 of the Town and Country Planning Act 1990. 3 A04 (Approval of reserved matters) Reason: To enable the local planning authority to exercise proper control over these aspects of the development. 4 A05 (Plans and particulars of reserved matters) Reason: Required to be imposed by Section 92 of the Town and Country Planning Act 1990. 5 H01 (Single access - not footway) Reason: In the interests of highway safety. 6 H03 (Visibility splays) Reason: In the interests of highway safety. 7 H05 (Access gates) Reason: In the interests of highway safety. 8 H06 (Vehicular access construction) Reason: In the interests of highway safety. 9 H12 (Parking and turning - single house) Reason: In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway. 10 H27 (Parking for site operatives) Reason: To prevent indiscriminate parking in the interests of highway safety. 11 Foul water and surface water discharges must be drained separately from the site. Reason: To protect the integrity of the public sewerage system. 12 No surface water shall be allowed to connect (either directly or indirectly) to the public sewerage system. Reason: To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no detriment to the environment. 13 No land drainage run-off will be permitted, either directly or indirectly, to discharge into the public sewerage system. Reason: To prevent hydraulic overload of the public sewerage system and pollution of the environment. Informatives: 1 HN01 - Mud on highway 2 HN04 - Private apparatus within highway 3 HN05 - Works within the highway 4 If a connection is required to the public sewerage system, the developer is advised to contact the Dwr Cymru Welsh Water's Network Development Consultants on Tel: 01443 331155 5 N15 - Reason(s) for the Grant of Planning Permission