Resolved
RESOLVED That planning permission be granted subject to the following conditions: 1 - A01 (Time limit for commencement (full permission) ) Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2 - A08 (Development in accordance with approved plans and materials ) Reason: To ensure adherence to the approved plans and to protect the general character and amenities of the area. 3 - B01 (Samples of external materials ) Reason: To ensure that the materials harmonise with the surroundings. 4 - Prior to any development on site details will be submitted and approved in writing by the Local Planning Authority with regards to details of window sections and construction, external doors, barge boards and mortar mix to be used in the external construction of the development. Reason: To safeguard the character and appearance of the surrounding vicinity of the development site. 5 - D01 (Site investigation - archaeology ) Reason: To ensure the archaeological interest of the site is recorded. 6 - E08 (Domestic use only of garage ) Reason: To ensure that the garage is used only for the purposes ancillary to the dwelling. 7 - Foul water and surface water discharges must be drained separately from the site. Reason: To protect the integrity of the Public Sewerage System. 8 - No surface water shall be allowed to connect (either directly or indirectly) to the public sewerage system. Reason: To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no detriment to the environment. 9 - No land drainage run-off will be permitted, either directly or in-directly, to discharge into the public sewerage system. Reason: To prevent hydraulic overload of the public sewerage system and pollution of the environment. 10 - G01 (Details of boundary treatments ) Reason: In the interests of visual amenity and to ensure dwellings have satisfactory privacy. 11 - G09 (Retention of hedgerows ) Reason: To safeguard the amenity of the area. Informatives: 1 - N15 - Reason(s) for the Grant of PP/LBC/CAC That conservation area consent be granted subject to the following condition: 1 – C01 Time limit for commencement (Listed Building Consent) Reason: Required to be imposed by Section 18(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990. Informatives: 1 - N15 - Reason(s) for the Grant of PP/LBC/CAC