Resolved
That planning permission be granted subject to the following conditions: 1. A01 (Time limit for commencement (full permission)) Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2. A07 (Development in accordance with approved plans) Reason: To ensure adherence to the approved plans in the interests of a satisfactory form of development. 3. B01 (Samples of external materials) Reason: To ensure that the materials harmonise with the surroundings. 4. G01 (Details of boundary treatments) Reason: In the interests of visual amenity and to ensure dwellings have satisfactory privacy. 5. W01 (Foul/surface water drainage) Reason: To protect the integrity of the public sewerage system. 6. W02 (No surface water to connect to public system) Reason: To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no detriment to the environment. 7. W03 (No drainage run-off to public system) Reason: To prevent hydraulic overload of the public sewerage system and pollution of the environment. 8. H01 (Single access - not footway) Reason: In the interests of highway safety. 9. H05 (Access gates) Reason: In the interests of highway safety. 10. The whole of the splayed entrance shall have a sealed surface, (tarmac, concrete or similar) and shall remain unobstructed at all times. Reason: In the interests of highway safety. 11. The whole of the works relating to means of access including drainage shall be completed before the development is brought into use. Reason: In the interests of highway safety. Informatives: 1. N03 - Adjoining property rights 2. The applicants/developers are advised to liaise with owners of adjoining properties before and during building work to ensure that no damage is caused to those properties by this development during construction work or at any time in the future. 3. N14 - Party Wall Act 1996 4. HN05 - Works within the highway 5. HN01 - Mud on highway 6. HN10 - No drainage to discharge to highway 7. If a connection is required to the public sewerage system, the developer is advised to contact Welsh Waters Network Development Consultants on telephone: 01443 331155. 8. N15 - Reason(s) for the Grant of Planning Permission