Resolved
RESOLVED THAT Consideration of the application be deferred.
Northern Area Planning Sub-Committee deferred this item on Wednesday 20 April 2005. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED THAT Consideration of the application be deferred.
NORTHERN AREA PLANNING SUB-COMMITTEE 20TH APRIL 2005
17 DCNE2005/0709/F - DEMOLITION OF EXISTING HOME AND NEW BUILD EXTRA CARE HOME AND DAY CENTRE, WITH ASSOCIATED FACILITIES AT LEADON BANK OLD PEOPLES HOME, ORCHARD LANE, LEDBURY, HEREFORDSHIRE, HR8 1DQ
For: Shaw Healthcare Herefordshire Ltd per Pentan Partnership, Beaufort Studio, 1 Atlantic Wharf, Cardiff, CF10 4AH
Date Received: Ward: Grid Ref: 3rd March 2005 Ledbury 70744, 38028 Expiry Date: 28th April 2005 Local Members: Councillors P Harling, B Ashton & D Rule MBE
1. Site Description and Proposal
1.1This application is for the erection of a new extra care home, a 20 place day centre and associated facilities on the site of the existing Leadon Bank Nursing Home on Orchard Lane, Ledbury.
1.2The proposal comprises a mixed height development. The original submission ranged from single to five storeys, its maximum height being 16 metres. However, the plans have now been amended and no part of the scheme exceeds 3½ storeys.
1.3The proposal has been designed as two residential wings linked by the new day care area. The first wing seeks to create a road frontage along Orchard Lane, and this is stepped to create visual breaks and a reduction in its dominance. It is 3½ storeys, utilising the roof space, and this brings the height down to 13.4 metres. The second wing lies behind and comprises a 2½ storey element, 10.3 metres in height. The two are linked by the single storey day care area. This forms the main entrance to the premises and creates a focal point when approaching via the main vehicular access, which is to be retained as existing.
1.4The rationale of the scheme is such that it will be constructed on site prior to the demolition of the existing care home. This was made as a fundamental design requirement in order that existing residents can remain in occupancy whilst the new facilities are constructed and avoid a temporary move to other accommodation.
1.5In light of this constraint, the proposal is located on an area of land between the existing building and the Orchard Lane road frontage.
1.6The site slopes generally in a west/east direction with a further drop at the boundary with Orchard Lane. At its greatest, the difference between the two amounts to approximately 1.5 metres. The application includes a comparative height study that shows the proposal in relation to Orchard Lane and other features in the immediate area including Belle Orchard House, a Grade II Listed Building, and residential dwellings to the rear (north) of the site.
Further information on the subject of this report is available from [name removed] on 01432 261803 Ext 1803 NORTHERN AREA PLANNING SUB-COMMITTEE 20TH APRIL 2005
1.7The site is well vegetated with a range of mature trees and hedgerows providing that the existing care home is almost totally obscured from view from Orchard Lane. The application also includes a full tree survey, identifying those which are in need of attention and those that are healthy. An ecological report also accompanies the application.
2. Policies
2.1Hereford and Worcester County Structure Plan
CTC9 – Development Requirements CTC11 – Trees and Woodlands
2.2Malvern Hills District Local Plan
Conservation Policy 11 – The Setting of Listed Buildings Housing Policy 17 – Residential Standards
2.3Herefordshire Unitary Development Plan (Revised Deposit Draft)
S1 – Sustainable Development DR1 – Design DR3 – Movement LA5 – Protection of Trees, Woodland and Hedgerows LA6 – Landscaping Scheme HBA4 – Setting of Listed Building CF5 – New Community Facilities CF7 – Residential Nursing and Care Homes
3. Planning History
None relevant to this application.
4. Consultation Summary
Statutory Consultations
4.1None received.
Internal Council Advice
4.2Traffic Manager - no objection subject to conditions. These are to include the provision of secure cycle parking for employees, the completion of a 'Green Travel Plan' prior to the commencement of development and the provision of an ambulance parking bay.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
DCNC2005/0709/F: DCNE2005/0709/F: DEMOLITION OF EXISTING HOME AND NEW BUILD EXTRA CARE HOME AND DAY CENTRE, WITH ASSOCIATED FACILITIES AT LEADON BANK OLD PEOPLES HOME, ORCHARD LANE, LEDBURY, HEREFORDSHIRE, HR8 1DQ FOR: SHAW HEALTHCARE HEREFORDSHIRE LTD PER PENTAN PARTNERSHIP, BEAUFORT STUDIO, 1 ATReport | 73 KB | DownloadRead as text |
Follow Northern Area Planning Sub-Committee at Herefordshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 16 Dec 2009 | MINUTESThat the Minutes of the meeting held on 18 November 2009 be approved as a correct record and signed by the Chairman s... | Approved | Open |
| 16 Dec 2009 | Dmnc/092421/f - orchard court, maund court, bodenham, herefordshire, hr1 3ja.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... | Approved | Open |
| 16 Dec 2009 | Dmne/092456/f - knapp farm, pixley, ledbury, herefordshire, hr8 2qb.RESOLVED That planning permission be granted subject to the following conditions: 1 The existing building highlighted... | Decided | Open |
| 16 Dec 2009 | Dmne09/2359/f - 88 bridge street, ledbury, herefordshire, hr8 2an.RESOLVED That planning permission be granted subject to the following conditions: 1 The development hereby permitted ... | Approved | Open |
| 16 Dec 2009 | Dmne09/2018/f - plot adjacent 4 the crescent, colwall, herefordshire, wr13 6qn.RESOLVED That planning permission be granted subject to the following conditions: 1 The development hereby permitted ... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.