Resolved
RESOLVED THAT planning permission be granted subject to the following conditions: 1 A01 (Time limit for commencement (full permission) ) Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2 A07 (Development in accordance with approved plans ) Reason: To ensure adherence to the approved plans in the interests of a satisfactory form of development. 3 B01 (Samples of external materials ) Reason: To ensure that the materials harmonise with the surroundings. 4 D01 (Site investigation - archaeology ) Reason: To ensure the archaeological interest of the site is recorded. 5 E18 (No new windows in specified elevation ) Reason: In order to protect the residential amenity of adjacent properties. 6 F16 (Restriction of hours during construction ) Reason: To protect the amenity of local residents. 7 F48 (Details of slab levels ) Reason: In order to define the permission and ensure that the development is of a scale and height appropriate to the site. 8 G01 (Details of boundary treatments ) Reason: In the interests of visual amenity and to ensure dwellings have satisfactory privacy. 9 G02 (Landscaping scheme (housing development) ) Reason: To ensure a satisfactory and well planned development and to preserve and enhance the quality of the environment. 10 G03 (Landscaping scheme (housing development) - implementation ) Reason: To ensure a satisfactory and well planned development and to preserve and enhance the quality of the environment. 11 G09 (Retention of trees/hedgerows ) Reason: To safeguard the amenity of the area. 12 No development shall commence on the site or machinery or materials be brought on to the site for the purpose of development until adequate measures have been taken to prevent damage to Eign Brook and to those trees which are to be retained. Protective measures must include: a) Protective fencing, of a type and form agreed in writing with the local planning authority, to be erected along the boundary of the 5 metre exclusion zone. This fencing must be at least 2.0 metres high and sufficiently robust to deter construction traffic. b) No excavations, site works, trenches, channels, pipes, services or temporary buildings used in connection with the development or areas for the deposit of soil or waste or for the storage of construction materials, equipment or fuel or other deleterious liquids shall be sited within the exclusion zone. Reason: In order to preserve the character and amenity of the area. 13 Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order, no buildings or other structures (including gates, wall or fences), shall be erected and/or no changes to ground levels shall be carried out within 5 metres of the top of any bank of water courses and/or within 5 metres of any site ... view the full minutes text for item 27.