Central Area Planning Sub-Committee approved this item on Wednesday 16 November 2005. Below is the council's own wording, with the papers it was decided on.
That planning permission be granted subject to the following conditions: 1. A01 (Time limit for commencement (full permission)). Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2. A06 (Development in accordance with approved plans). Reason: To ensure adherence to the approved plans in the interests of a satisfactory form of development. 3. B01 (Samples of external materials). Reason: To ensure that the materials harmonise with the surroundings. 4. E18 (No new windows in specified elevation) (east). Reason: In order to protect the residential amenity of adjacent properties. 5. F22 (No surface water to public sewer). Reason: To safeguard the public sewerage system and reduce the risk of surcharge flooding. 6. The balustrade/handrail on the balconies marked with a cross on the approved plan shall be set back a minimum distance of 0.7 metres from the rear edge of those balconies and maintained as such at all times thereafter. Reason: To protect the residential amenity of adjacent properties. 7. H09 (Driveway Gradient). Reason: In the interests of highway safety. 8. H11 (Parking – estate development (more than one house). Reason: In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway. 9. F16 (Restriction of hours during construction). Reason: To protect the amenity of local residents. Informatives: 1. N01 - Access for all. 2. N03 - Adjoining property rights. 3. N04 - Rights of way. 4. N14 - Party Wall Act 1996. 5. The development site is crossed by a public sewer and no building should be erected within 3 metres either side of the centreline of that sewer. Therefore the applicant is advised to contact Welsh Water on 01443 331155 for further information. 6. N15 - Reason(s) for the Grant of PP/LBC/CAC.
Word for word from the decision Herefordshire published for this meeting.Source: councillors.herefordshire.gov.uk
CENTRAL AREA PLANNING SUB-COMMITTEE 16TH NOVEMBER, 2005
15 DCCW2005/3138/F - PROPOSED DEMOLITION OF DETACHED GARAGE AND EXISTING EXTENSION AND ERECTION OF 3 NO. TWO BEDROOM HOUSES AT 14 BAGGALLAY STREET, HEREFORD, HR4 0DZ
For: Mr. & [name removed] per David Edwards Associates, Station Approach, Barrs Court, Hereford, HR1 1BB
Date Received: 28th September, 2005 Ward: Three Elms Grid Ref: 49824, 40507 Expiry Date: 23rd November, 2005 Local Members: Councillors [name removed].A. Andrews; [name removed].P.A. Daniels and [name removed].M. Toon
1. Site Description and Proposal
1.1The application site is comprised of a single storey semi-detached property and adjoining detached double garage located within an established residential area of Hereford.
1.2The area is generally characterised by large detached and semi-detached dwellings, which range between two and three storeys with no overall defining architectural style.
1.3The application seeks consent to demolish the garage and erect a pair of semi- detached dwellings and a two storey extension above the existing single storey element of 14 Baggallay Street.
2. Policies
2.1Hereford Local Plan:
Policy ENV14 - Design Policy H3 - Design of New Residential Development Policy H12 - Established Residential Areas – Character and Amenity Policy H14 - Established Residential Areas – Site Factors
2.2Herefordshire Unitary Development Plan (Revised Deposit Draft):
Policy DR1 - Design Policy H1 - Hereford and the Market Towns Policy H13 - Sustainable Residential Design Policy H15 - Density Policy H16 - Car Parking
3. Planning History
3.1DCCW2005/1559/F Proposed demolition of detached garage and existing extension and erection of 3 no. 2 bedroom houses. Withdrawn 29th June, 2005.
Further information on the subject of this report is available from [name removed].G. Clasby on 01432 261947 CENTRAL AREA PLANNING SUB-COMMITTEE 16TH NOVEMBER, 2005
4. Consultation Summary
Statutory Consultations
4.1Welsh Water - no objection, subject to the imposition of standard sewerage conditions.
Internal Council Advice
4.2The Traffic Manager has no objection, subject to the imposition of standard conditions.
5. Representations
5.1Hereford City Council - Objection – over-intensive development
5.2A letter of objection has been received from 16 Baggallay Street, summarised as follows:
• Loss of residential privacy.
• Noise disturbance.
• Loss of sunlight to the rear garden.
The full text of these letters can be inspected at Central Planning Services, Blueschool House, Blueschool Street, Hereford and prior to the Sub-Committee meeting.
6. Officers Appraisal
6.1The principal considerations in determining this application are the impact on the character and appearance of the wider locality and the impact of the proposal on the residential amenity of the adjoining dwellings.
Design
6.2The overall concept of the design has incorporated elements found within the wider area, which will allow the new dwellings to visually relate to the street scene. There is a reduction in ridge height between the elements, which helps the transition from the height of No. 12, which stands at three storeys and the lower height of No. 16, which has two storeys.
6.3The proposed extension of 14 Baggallay Street incorporates the retention of an interesting and unusual bay window which contains large stained glass panels above which will rise a further two storeys set in line with the existing main fascia of No. 12. It is therefore considered that the proposal accords with the objectives of Policies ENV14, H13 and H12 of the adopted Hereford Local Plan.
Residential Amenity
6.4Although the proposed semi-detached dwellings will rise above the height of No. 16, it is not considered that the development will unacceptably overbear or give rise to a demonstrable loss of residential amenity.
Further information on the subject of this report is available from [name removed].G. Clasby on 01432 261947 CENTRAL AREA PLANNING SUB-COMMITTEE 16TH NOVEMBER, 2005
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Central Area Planning Sub-Committee at Herefordshire and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.