Resolved
That planning permission be granted subject to the following conditions: 1. A01 (Time limit for commencement (full permission)). Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2. A06 (Development in accordance with approved plans). Reason: To ensure adherence to the approved plans in the interests of a satisfactory form of development. 3. B01 (Samples of external materials). Reason: To ensure that the materials harmonise with the surroundings. 4. H13 (Access, turning area and parking). Reason: In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway. 5. Before any other works hereby approved on the application site are commenced, the proposed access shown on drawings 096-LS01 and 096-SOP2 have been completed to the satisfaction of the local planning authority after consultation with the Highways Agency. Reason: In the interests of highway safety. 6. F17 (Scheme of foul drainage disposal). Reason: In order to ensure that satisfactory drainage arrangements are provided. 7. E19 (Obscure glazing to windows). Reason: In order to protect the residential amenity of adjacent properties. 8. During the construction phase no machinery shall be operated, no process shall be carried out and no deliveries taken at or despatched from the site outside the following times: Monday - Friday 7.00 am - 6.00 pm, Saturday 8.00 am - 1.00 pm nor at any time on Sundays, Bank or Public Holidays. Reason: To safeguard residential amenity. 9. No materials or substances shall be incinerated within the application site during the construction phase. Reason: To safeguard residential amenity and prevent pollution. Informatives: 1. The highways proposals associated with this planning permission involve works within the public highway, which is land over which you have no control. The Highways Agency therefore requires you to enter into a suitable legal agreement to cover the design and construction of the works. Please contact [name removed], S278 Team on 0121 678 8237 at an early stage to discuss the details of the highways agreement. 2. N01 - Access for all. 3. N03 - Adjoining property rights. 4. N19 - Avoidance of doubt. 5. N15 - Reason(s) for the Grant of PP/LBC/CAC.