Central Area Planning Sub-Committee approved this item on Wednesday 13 December 2006. Below is the council's own wording, with the papers it was decided on.
Subject to there being no objection from Ocle Pychard Parish Council by the end of the consultation period and Subject to Head of Legal and Democratic Services being authorised to complete a planning obligation under Section 106 of the Town and Country Planning Act 1990 by the 3rd January, 2007 in accordance with the Heads of Terms attached to this report and any additional matters and terms he considers appropriate, Upon completion of the aforementioned planning obligation officers named in the Scheme of Delegation to Officers be authorised to issue planning permission subject to the following conditions and any further conditions considered necessary by officers. 1. A02 (Time limit for submission of reserved matters (outline permission)). Reason: Required to be imposed by Section 92 of the Town and Country Planning Act 1990. 2. A03 (Time limit for commencement (outline permission)). Reason: Required to be imposed by Section 92 of the Town and Country Planning Act 1990. 3. A04 (Approval of reserved matters). Reason: To enable the local planning authority to exercise proper control over these aspects of the development. 4. A05 (Plans and particulars of reserved matters). Reason: Required to be imposed by Section 92 of the Town and Country Planning Act 1990. 5. F18 (Scheme of foul and surface drainage disposal). Reason: In order to ensure that satisfactory drainage arrangements are provided. 6. H13 (Access, turning area and parking). Reason: In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway. 7. F32 (Details of floodlighting/external lighting). Reason: To safeguard local amenities. 8. G08 (Retention of trees/hedgerows (outline applications)). Reason: To safeguard the amenity of the area. 9. Prior to the commencement of development, details including scaled plans of the proposed signage and its location to be erected both during the construction ... view the full minutes text for item 126.
Word for word from the decision Herefordshire published for this meeting.Source: councillors.herefordshire.gov.uk
CENTRAL AREA PLANNING SUB-COMMITTEE 13TH DECEMBER, 2006
9 DCCE2006/3200/O - ERECTION OF 2 NO 16000 BIRD, FREE RANGE EGG LAYING UNITS. THINGHILL COURT WITHINGTON, HEREFORD, HEREFORDSHIRE, HR1 3QG
For: J.S. & C.P. Hawkins, Ian Pick Associates Ltd, Unit 3 Brook Street, Driffield, East Yorkshire, YO25 6QP
Date Received: 5th October, 2006 Ward: Hagley Grid Ref: 56978, 44903 Expiry Date: 4th January, 2007 Local Member: Councillor R.M. Wilson
1. Site Description and Proposal
1.1The site is located either side of public bridleway WT21, 150 metres east of Thinghill Court and approximately 1 kilometre north of Withington. Access is via the C1130, 800 metres south of the junction with the A465 Hereford to Bromyard Road. The bridleway which is to provide access to the site is surfaced with tarmacadam and of a single vehicle width with the boundaries enclosed by mature hedging. The site for the buildings is relatively flat and is presently agricultural pasture land. Immediately to the east is a small agricultural building and area of hardstanding used for general storage, the remainder of the immediate area around the site is undeveloped.
1.2Outline planning permission is sought for the construction of two single storey agricultural buildings, each to house 16,000 free range egg laying hens. The proposed buildings are of identical size and design each measuring 104.5 metres in length by 20.1 metres in width by 7 metres in height to the ridge of the roof. The buildings are to be sited either side of the bridleway (north and south) and accessed off the bridleway. A concrete apron is proposed around the buildings along with the installation of four feed bins which would be of the same height as the buildings. The application is in outline form with details of the access, siting and design of the building being provided at this stage and the external appearance and landscaping reserved for future consideration.
2. Policies
2.1Herefordshire Unitary Development Plan (Revised Deposit Draft):
S2 - Development requirements S6 - Transport DR1 - Design DR2 - Land use and activity DR3 - Movement DR4 - Environment DR5 - Planning obligations DR9 - Air quality E13 - Agricultural and forestry development E16 - Intensive livestock units T9 - Road freight
Further information on the subject of this report is available from [name removed] on 01432 261957 CENTRAL AREA PLANNING SUB-COMMITTEE 13TH DECEMBER, 2006
T13 - Traffic management schemes
3. Planning History
3.1No history for the site or the immediate surrounding area.
4. Consultation Summary
Statutory Consultations
4.1River Lugg Internal Drainage Board: The Drainage Board would raise no objection in principle but the planning authority must be satisfied that soakaways will operate satisfactorily in the ground conditions prevailing at the site throughout the year.
4.2National Grid: Although the National Grid does have a high pressure gas pipe line in the vicinity, the proposed development is outside the criteria requiring Transco to carry out any improvements.
4.3Health and Safety Executive: The HSE does not advise on safety grounds against the granting of planning permission in this case.
Internal Council Advice
4.4Traffic Manager: I have concerns for any further intensification of operations at the above site due to damage to the local road network and passage of large vehicles through Withington village past the school where there are no footways. A routing agreement is recommended to use the southern access and require all traffic to enter and exit the site from a northerly direction via the A465. Passing bays between the site access and the junction with the A465 are also required.
4.5Public Rights of Way Manager: The proposed development will have some impact on public bridleway WT21 which provides vehicular access to the site. The following points should be noted.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Central Area Planning Sub-Committee at Herefordshire and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.