Resolved

RESOLVED That planning permission be granted subject to the following condition: 1 A01 (Time limit for commencement (full permission)) Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. Informative(s): 1 N19 - Avoidance of doubt 2 N15 - Reason(s) for the Grant of Planning Permission
Word for word from the decision Herefordshire published for this meeting. Source: councillors.herefordshire.gov.uk

Follow this further

Built from Herefordshire's papers

What the report saysPro

Report to Southern Area Planning Sub-Committee

SOUTHERN AREA PLANNING SUB-COMMITTEE 20TH DECEMBER, 2006

9 DCSW2006/3297/F - FIRST FLOOR EXTENSION, HAREWOOD COTTAGE, HAREWOOD END, HEREFORD, HEREFORDSHIRE, HR2 8JT.

For: Mr. & [name removed] per [name removed], Brookside Cottage, Knapton Green, Herefordshire, HR4 8ER.

Date Received: 13th October, 2006 Ward: Pontrilas Grid Ref: 52941, 26931 Expiry Date: 8th December, 2006 Local Member: Councillor G.W. Davis

1. Site Description and Proposal

1.1The proposal site is reached off the northern side of the A49(T) road at Harewood Inn. The Harewood Inn is immediately to the north-west separated from the application site by an unadopted track that serves Harewood Cottage and further to the north-east is a workshop.

1.2Harewood Cottage has previously been extended with a two-storey extension to the rear providing a master bedroom and en-suite bathroom. A dormer extension was also approved as part of this 1992 planning permission. The dormer faces the A49(T) road. A proposal to extend the building by increasing the ridge height on a single-storey element on the south-eastern side and by extending rearward was refused and then the subject of an appeal which was dismissed in 2004. The Inspector considered that the existing balance between original cottage as viewed from the A49(T) and the new extension would harm the overall character and appearance of the building.

1.3The current proposal entails increasing the pitch of the concrete tiled roof on the roadside elevation (i.e. facing the A49(T) and then erecting a dormer window into this new roof larger than the existing off-centred one. The new roof will then continue into a new roof over a first floor addition over the existing living room. A balcony is proposed on the rear elevation, it projects out 800mm and is 3.3 metres wide.

2. Policies

2.1Herefordshire Unitary Development Plan (Revised Deposit Draft)

Policy DR.1 - Design Policy H.18 - Alterations and Extensions Policy LA.1 - Areas of Outstanding Natural Beauty

2.2South Herefordshire District Local Plan

Policy GD.1 - General Development Criteria Policy C.5 - Development within Area of Outstanding Natural Beauty Policy SH.23 - Extensions to Dwellings

Further information on the subject of this report is available from [name removed] on 01432 261932 SOUTHERN AREA PLANNING SUB-COMMITTEE 20TH DECEMBER, 2006

3. Planning History

3.1SH920993PF Two-storey extension and dormer - Approved 26.08.92 window

SW2003/1392/F First floor extension - Refused 03.07.03 Dismissed on Appeal 29.04.04

4. Consultation Summary

Statutory Consultations

4.1The Highways Agency has no objection.

Internal Council Advice

4.2The Public Rights of Way Manager has no objections.

5. Representations

5.1Harewood Parish Council has no objections.

5.2Pencoyd Parish Council also has no objections.

5.3Two letters of representation have been received from:

[name removed].E. Bennett, 5 Woodfield, Harewood End, HR2 8JT Y. & G. Meek, Badger's Wood, Harewood End, HR2 8JT

The following main points are raised:

- extended enough - extension also likely to affect bridleway - path already affected by detergent and grease from fork lift repair garage - shared cesspit blocked up, given number by guests, employees, king size bath installed - no more sinks, toilets, showers or baths - balcony would infringe upon our privacy.

The full text of these letters can be inspected at Southern Planning Services, Blueschool House, Blueschool Street, Hereford and prior to the Sub-Committee meeting.

6. Officer’s Appraisal

6.1The main issues relate to the principle of extending the dwelling further and with particular reference to the appeal decision relating to the previously submitted scheme, issues raised relating to foul drainage matters and lastly the introduction of a balcony on the rear extension of the first floor addition.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
DCSW2006/3297/F: HAREWOOD COTTAGE, HAREWOOD END, HEREFORD, HEREFORDSHIRE, HR2 8JT.Report 590 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

10 of 16 attended
GD
Councillor Godfrey DavisMember, present
MJ
Councillor Mrs. Joyce DavisMember, present
PT
Councillor Phil TurpinChairperson, apologies
HB
Councillor Harry BramerVice-Chairperson, present
RC
Ricky ClarkeSecretary, expected
MC
Councillor Mark CunninghamMember, apologies
ND
Councillor Nigel DaviesMember, apologies
JE
Councillor John EdwardsMember, present
PE
Councillor PJ EdwardsIn Attendance, in attendance
AG
Councillor AE GrayMember, present
TH
Councillor TW HuntIn Attendance, in attendance
JH
Councillor JA Hyde sadly passed away on Monday 11 February 2019.Member, present

All 16 on the meeting page

On this subject at Herefordshire

Search all
  1. DCSW2006/3297/F - HAREWOOD COTTAGE, HAREWOOD END, HEREFORD, HEREFORDSHIRE, HR2 8JT.This decision
  2. DCSW2006/3829/F - HAREWOOD PARK, HAREWOOD END, HEREFORDSHIRE, HR2 8JS. (Agenda Item 8)Approved
  3. DCSW2005/0993/O - Vipassana Trust, Dhamma Dipa, Harewood End, Herefordshire, HR2 8JS (Agenda Item 8)Approved

More from Herefordshire Southern Area Planning Sub-Committee

All decisions
MeetingDecisionOutcome
23 Dec 2009 MINUTESThat the Minutes of the meeting held on 25 November 2009 be approved as a correct record and signed by the Chairman. Approved Open
23 Dec 2009 Dmse09/2571/f - ashdown, llangrove, ross-on-wye, herefordshire, hr9 6ep.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... Approved Open
23 Dec 2009 Dmsw09/1993/f - oldfield farm, garway hill, hereford,RESOLVED That, subject to the receipt of details of the visibility splay and confirmation that the Traffic Manager is... Approved Open
23 Dec 2009 Dmse09/2727/f - caradoc court, sellack, ross-on-wye, herefordshire, hr9 6ls.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... Approved Open
23 Dec 2009 Dmse09/2758/f - green orchard, ryefield road, ross-on-wye, herefordshire, hr9 5ls.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies