Resolved
RESOLVED that planning permission be granted subject to the following conditions: 1 - A01 (Time limit for commencement (full permission) ) Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2 - F32 (Details of floodlighting/external lighting )(external lighting)(the use hereby permitted) Reason: To safeguard local amenities. 3 - E06 (Restriction on Use )(agricultural engineering)(B2) Reason: The local planning authority wish to control the specific use of the land/premises, in the interest of local amenity. 4 - E16 (Removal of permitted development rights )(no extension or installations of plant or machinery outside the building) Reason: To retain control over the size of the premises in the interests of protecting the amenities of the area. 5 - No goods, plant, material or machinery shall be deposited or stored outside the application site edged in red on the plan received by the local planning authority on 21st June 2007. Reason: To protect the appearance of the locality. 6 - G12 (Planting of hedgerows which comply with Hedgerow Regulations )(around the boundary of the site) Reason: To ensure that hedges planted are ecologically and environmentally rich and to assist their permanent retention in the landscape. 7 - G05 (Implementation of landscaping scheme (general) ) Reason: In order to protect the visual amenities of the area. 8 - G09 (Retention of trees/hedgerows )(existing trees or hedgerow along the road frontage of the site) Reason: To safeguard the amenity of the area. 9 - The existing pond adjoining the road and shown on the plan received by the local planning authority on 21st June 2007 shall be retained and protected from contamination in accordance with a scheme that shall be submitted to and agreed in writing with the local planning authority before the use commences, unless otherwise agreed in writing by the Local Planning Authority. Reason: To protect a water habitat that has the potential to support locally important or protected species. 10 - F18 (Scheme of foul drainage disposal) Reason: In order to ensure that satisfactory drainage arrangements are provided. Informatives: 1 - N15 - Reason(s) for the Grant of PP/LBC/CAC 2 - N19 - Avoidance of doubt