CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Herefordshire Council
Central Area Planning Sub-Committee, Wednesday 29 August 2007 at 2.00pm

DCCW2007/1234/F - 4 Hazel Grove, Hereford, Herefordshire, HR2 7JX [Agenda Item 6]

Decided Planning 1 paper

Central Area Planning Sub-Committee decided this item on Wednesday 29 August 2007. Below is the council's own wording, with the papers it was decided on.

Item45

Resolved

That planning permission be granted subject to the following conditions: 1. A01 (Time limit for commencement (full permission)). Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2. B02 (Matching external materials (extension)). Reason: To ensure the external materials harmonise with the existing building. 3. E18 (No new windows in specified elevation). Reason: In order to protect the residential amenity of adjacent properties. 4. H12 (Parking and turning – single house) (2 cars). Reason: In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway. Informatives: 1. N03 - Adjoining property rights. 2. N14 - Party Wall Act 1996. 3. N19 - Avoidance of doubt. 4. N15 - Reason(s) for the Grant of PP/LBC/CAC.
Word for word from the decision Herefordshire published for this meeting. Source: councillors.herefordshire.gov.uk

Follow this further

Built from Herefordshire's papers

What the report saysPro

Report to Central Area Planning Sub-Committee

CENTRAL AREA PLANNING SUB-COMMITTEE 29TH AUGUST, 2007

6 DCCW2007/1234/F - PROPOSED EXTENSION AFTER DEMOLITION OF GARAGE AT 4 HAZEL GROVE, HEREFORD, HEREFORDSHIRE, HR2 7JX

For: Mr. & [name removed] per [name removed], Bank Lodge, Coldwells Road, Holmer, Hereford, HR1 1LH

Date Received: 17th April, 2007 Ward: St. Martins & Grid Ref: 50450, 38707 Hinton Expiry Date: 12th June, 2007 Local Members: Councillors WU Attfield, ACR Chappell and AT Oliver

Introduction

This application was deferred at the meeting of the Central Area Planning Sub- Committee on the 1st August, 2007 in order to carry out a Members’ site visit. The site visit was carried out on the 14th August, 2007.

1. Site Description and Proposal

1.1No. 4 Hazel Grove is a two storey semi-detached house fronting the west side of the road towards the junction with Walnut Tree Avenue. It is located within an established residential area. A driveway on the southern side of the site leads to an existing garage at the rear of the house.

1.2No. 2 Hazel Grove, the northern half of the semi-detached pair, has a conservatory projecting some 3.70 metres from the rear wall and a single storey extension projecting some 8.00 metres rearwards at the northern end of the house. The other neighbouring house, No. 6 to the south, is set back some 5.00 metres from the building line of No. 4.

1.3It is proposed to remove the existing garage and erect a part single storey part two storey extension.

1.4The single storey element would project 5.50 metres from the rear wall of the house for most of its width with a sideways extension of 1.80 metres over the driveway. The proposed first floor hipped roof element would project 4.00 metres from the rear wall of the house over a large part of the southern half of the ground floor extension. It would have a width of 4.40 metres so that the side walls would be 3.50 metres from the boundary with No. 2 Hazel Grove and 300mm from the boundary with No. 6 Hazel Grove. At the rear there would be a length of lean-to roof over the longer projection of the ground floor element.

1.6The two storey element would wrap round the side of the house for a length of 4.70 metres to produce a gabled side facing No. 6 Hazel Grove at a distance of 900mm from the boundary. The ridge of this side extension would run into the existing hipped roof of the house at a level of some 1.50 metres lower than the existing roof ridge line.

1.7Facing materials would be brick and slate.

Further information on the subject of this report is available from [name removed] on 01432 261566 CENTRAL AREA PLANNING SUB-COMMITTEE 29TH AUGUST, 2007

2. Policies

2.1Planning Policy Guidance:

PPS1 - Delivering Sustainable Development

2.2Herefordshire Unitary Development Plan 2007:

Policy S1 - Sustainable Development Policy S2 - Development Requirements Policy DR1 - Design Policy H16 - Car Parking Policy H18 - Alterations and Extensions

3. Planning History

3.1DCCW2005/1848/F Proposed single storey extension to side and rear after removal of garage. Permitted 27th July, 2005.

4. Consultation Summary

Statutory Consultations

4.1None.

Internal Council Advice

4.2Traffic Manager: Recommends that permission be refused for the following reasons:-

Loss of garage and parking alongside house results in inadequate parking provision for the proposed number of bedrooms. A minimum of two off road spaces should be provided.

5. Representations

5.1Hereford City Council: No objections.

5.2Local residents: Two letters of objection have been received from [name removed].A. Chester and [name removed].E. Chester, 2 Hazel Grove, Hereford. The following is an extract from the first letter:-

“We have had a look at the plan but were unable to fully assess the impact on our property as there is no side elevation (north), this left us unable to see the height of the flat roof.

Please can we be notified when this plan can be provided.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
DCCW2007/1234/F: 4 Hazel Grove, Hereford, Herefordshire, HR2 7JX [Agenda Item 6]Agenda 623 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

18 of 26 attended
PA
Councillor Polly AndrewsMember, apologies
WA
Councillor WU AttfieldMember, present
DB
Councillor DJ BenjaminMember, present
AB
Councillor AJM BlackshawMember, apologies
AC
Councillor ACR ChappellMember, apologies
SD
Councillor SPA DanielsMember, present
HD
Councillor H DaviesMember, present
GD
Councillor GFM DaweMember, present
PE
Councillor PJ EdwardsMember, present
DG
Councillor DW GreenowMember, present
KG
Councillor Kema GuthrieMember, apologies
MH
Councillor MAF HubbardMember, present

All 26 on the meeting page

On this subject at Herefordshire

Search all
  1. DCCW2007/1234/F - 4 Hazel Grove, Hereford, Herefordshire, HR2 7JX [Agenda Item 6]This decision
  2. DCCW2007/1234/F - 4 Hazel Grove, Hereford, Herefordshire, HR2 7JX [Agenda Item 10]Deferred

More from Herefordshire Central Area Planning Sub-Committee

All decisions
MeetingDecisionOutcome
9 Dec 2009 MinutesThat the minutes of the meeting held on 11 November be approved as a correct record and signed by the Chairman. Approved Open
9 Dec 2009 DCCE/092424/F - Woodcroft, Haywood, Callow, Hereford, HR2 8BX [Agenda Item 6]That officers named in the Scheme of Delegation to Officers be authorised to issue planning permission subject to the... Decided Open
9 Dec 2009 DCCE0009/1813/F - 10 Chilton Square, Tupsley, Hereford, Herefordshire, HR1 1PS [Agenda Item 8]RESOLVED : That (i) The Central Area Planning Sub-Committee is minded to refuse the application subject to the reason... Refused Open
9 Dec 2009 DMCW/092179/F - Levante, Belle Bank Avenue, Holmer, Herefordshire, HR4 9RL [Agenda Item 9]RESOLVED : That (i) The Central Area Planning Sub-Committee is minded to refuse the application subject to the reason... Refused Open
11 Nov 2009 MinutesThat the minutes of the meeting held on 14 October 2009 be approved as a correct record and signed by the Chairman. Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies