DCSE2007/2920/F - THE OLD CANOE STORE, MILLPOND STREET, ROSS-ON-WYE, HEREFORDSHIRE, HR9 7AP (Agenda Item 13)
DeferredPlanning1 paper
Southern Area Planning Sub-Committee deferred this item on Wednesday 7 November 2007. Below is the council's own wording, with the papers it was decided on.
That consideration of the application be deferred for a site inspection for the following reasons: the character or appearance of the development itself is a fundamental planning consideration the setting and surroundings are fundamental to the determination or to the conditions being considered.
Word for word from the decision Herefordshire published for this meeting.Source: councillors.herefordshire.gov.uk
SOUTHERN AREA PLANNING SUB-COMMITTEE 7TH NOVEMBER, 2007
13 DCSE2007/2920/F - PROPOSED ADDITIONAL UNIT TO APPROVED SCHEME REF: DCSE2007/0645/F, THE OLD CANOE STORE, MILLPOND STREET, ROSS-ON- WYE, HEREFORDSHIRE, HR9 7AP
For: Woodfield Developments per Edge Design Workshop, Unit 2, Ruardean Works, Varnister Road, Nr Drybrook, Gloucester, GL17 9BH
Date Received: 13th September, 2007 Ward: Ross-on-Wye Grid Ref: 60168, 24306 East Expiry Date: 8th November, 2007 Local Member: Councillor AE Gray and Councillor PGH Cutter
1. Site Description and Proposal
1.1Planning permission and listed building consent were granted in July of this year to demolish a building, previously used by PGL for storing canoes, and the construction of 4 flats on this 0.2ha site at the rear of terraced houses in Station Road. The application site has a narrow frontage to Millpond Street, between a retail shop (1 Millpond Street) and a terrace of houses (2 - 4 Millpond Street). The remainder of the PGL site has been developed as retirement apartments by McCarthy and Stone (Wallace Court). The store building, which was understood to be a 20th Century industrial building, has now been demolished, except for parts of smaller buildings formerly attached to the north-west corner, and work to erect the new flats is underway.
1.2The current proposal differs from the approved scheme primarily in the first floor of the new building accommodating two one-bed flats rather than one two-bed flat. This has necessitated some changes to fenestration in both gable end elevations and additional rooflights are proposed to light the first floor bedrooms. The block of flats would be the same size however as that approved viz about 2m narrower than the existing canoe store but with a symetrical ridge roof with eaves on the northern boundary (abutting the rear garden of 2 Millpond Street) about 0.5m higher and a similar increase at ridge level. The fifth flat would be within the hipped roofed single-storey buildings. The main windows would be in the gable end walls of the new building plus 3 ground floor windows in the south elevation. Vehicular access would be off Millpond Street with 2 car parking spaces. Pedestrian access up a flight of steps is proposed over the flood protection wall, with a pedestrian route to the south of the building, leading to a small amenity area to the front of the flat within the smaller, existing buildings.
2. Policies
2.1Herefordshire Unitary Development Plan 2007
Policy S3 - Housing Policy H2 - Hereford and the Market Towns: Housing Land Allocations Policy H13 - Sustainable Residential Design Policy H14 - Re-using Previously Developed Land and Buildings
Further information on the subject of this report is available from [name removed] on 01432 260479 SOUTHERN AREA PLANNING SUB-COMMITTEE 7TH NOVEMBER, 2007
Policy H15 - Density Policy H16 - Car Parking Policy E5 - Safeguarding Employment Land and Buildings Policy DR1 - Design Policy DR2 - Land Use and Activity Policy DR3 - Movement Policy DR7 - Flood Risk Policy DR10 - Contaminated Land
3. Planning History
3.1DCSE2003/2242/F Proposed retirement homes - Withdrawn 22.10.03
DCSE2003/2245/C Demolition works to - Withdrawn 22.10.03 accommodate construction of retirement homes
DCSE2003/3862/F Three storey sheltered - Withdrawn 23.03.04 accommodation
DCSE2006/2484/F Demolition and construction of - Withdrawn 21.09.06 5 flats
DCSE2006/2485/C Demolition and construction of - Withdrawn 21.09.06 5 flats
DCSE2007/0645/F Demolition and construction of - Approved 20.07.07 4 flats
DCSE2007/0643/C Demolition and construction of - Consent 20.07.07 4 flats
4. Consultation Summary
Statutory Consultations
4.1Environment Agency's advice is awaited.
4.2Welsh Water request that conditions are included with regard to drainage of the site.
Internal Council Advice
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Southern Area Planning Sub-Committee at Herefordshire and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.