Resolved
That planning permission be granted subject to conditions: 1. A01 (Time limit for commencement (full permission)). Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2. B03 (Amended plans). Reason: To ensure the development is carried out in accordance with the amended plans and to comply with the requirements of Policy DR1 of Herefordshire Unitary Development Plan. 3. C01 (Samples of external materials). Reason: To ensure that the materials harmonise with the surroundings so as to ensure that the development complies with the requirements of Policy DR1 of Herefordshire Unitary Development Plan 4. F14 (Removal of permitted development rights). Reason: In order to protect the character and amenity of the locality, to maintain the amenities of adjoining property and to comply with Policy H13 of Herefordshire Unitary Development Plan. 5. F16 (No new windows in specified elevation). Reason: In order to protect the residential amenity of adjacent properties and to comply with Policy H18 of Herefordshire Unitary Development Plan. 6. F17 (Obscure glazing to windows). Reason: In order to protect the residential amenity of adjacent properties and to comply with Policy H18 of Herefordshire Unitary Development Plan. 7. I16 (Restriction of hours during construction). Reason: To protect the amenity of local residents and to comply with Policy DR13 of Herefordshire Unitary Development Plan. 8. G09 (Details of Boundary treatments). Reason: In the interests of visual amenity, to ensure the development has an acceptable standard of privacy and to conform to Policy DR1 of Herefordshire Unitary Development Plan. 9. H13 (Access, turning area and parking). Reason: In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway and to conform with the requirements of Policy T11 of Herefordshire Unitary Development Plan. 10. L01 (Foul/surface water drainage). Reason: To protect the integrity of the public sewerage system and to comply with Policy CF2 of Herefordshire Unitary Development Plan. 11. L02 (No surface water to connect to public system). Reason: To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no detriment to the environment so as to comply with Policy CF2 of Herefordshire Unitary Development Plan. 12. L03 (No drainage run-off to public system). Reason: To prevent hydraulic overload of the public sewerage system and pollution of the environment so as to comply with Policy CF2 of Herefordshire Unitary Development Plan. Informatives: 1. N19 - Avoidance of doubt - Approved Plans. 2. N15 - Reason(s) for the Grant of PP/LBC/CAC.