DCCE2008/1613/F - Unit 14B, Thorn Business Park, Rotherwas, Hereford, Herefordshire, HR2 6JT [Agenda Item 10]
DecidedPlanning2 papers
Central Area Planning Sub-Committee decided this item on Wednesday 3 September 2008. Below is the council's own wording, with the papers it was decided on.
That: 1) The Legal Practice Manager be authorised to complete a planning obligation under Section 106 of the Town and Country Planning Act 1990 in accordance with the above terms and any additional maters and terms as he considers appropriate. 2)Upon completion of the said planning obligation, ... view the full minutes text for item 50.
Word for word from the decision Herefordshire published for this meeting.Source: councillors.herefordshire.gov.uk
CENTRAL AREA PLANNING SUB-COMMITTEE 3 SEPTEMBER 2008
10 DCCE2008/1613/F - PROPOSED CONSTRUCTION OF STEEL FRAMED INDUSTRIAL UNIT AND ACCOMPANYING OUTSIDE SURFACING FOR JOINERY WORKSHOP, BUILDERS STORES AND OFFICE. UNIT 14B, THORN BUSINESS PARK, ROTHERWAS, HEREFORD, HEREFORDSHIRE, HR2 6JT
Date Received: 20 June 2008 Ward: Hollington Grid Ref: 52460, 38443 Expiry Date: 15 August 2008 Local Member: Councillor GFM Dawe
1. Site Description and Proposal
1.1The site known as Thorn Business Park is located on the western boundary of Rotherwas Industrial Estate bordering the railway line to the west, and surrounded by existing industrial buildings to the north, east and south. Access is gained via the B4399 (Holme Lacy Road) which runs in a northerly direction towards the site also serving all other industrial units in the area. Levels rise from south to north within the site although the site generally is relatively flat and is currently laid out to hardstanding and used for general storage purposes. In the south western corner is a mature oak tree. The site is safeguarded within the Herefordshire Unitary Development Plan as employment land forming part of Rotherwas Industrial Estate and also falls within Flood Plain - Flood Zone 2 and 3.
1.2Planning permission is sought for the construction of a new industrial building sited in the north eastern corner of the site. The building measures 30 metres in length by 18.8 metres in width by 8 metres in height to the pitch of the roof. The building will be constructed from a steel frame with a 2.5 metre high brick face on the front elevation, the remainder of the walls and roof will be clad with box profile sheet composite panel. The building will be used for mixed general industrial and storage also containing a reception area, offices, toilets and tea room areas.
2. Policies
2.1Herefordshire Unitary Development Plan 2007:
S1 - Sustainable development S2 - Development requirements S4 - Employment DR1 - Design DR2 - Land use and activity DR3 - Movement
Further information on the subject of this report is available from [name removed] on 01432 261957 CENTRAL AREA PLANNING SUB-COMMITTEE 3 SEPTEMBER 2008
3.1CE2000/2257/U - Use for heavy industry, foundry and machining including paint spraying - mainly in Units 5 & 6. Manufacture, assembly and storage - remaining buildings. Application withdrawn 20 June 2001.
3.2CE1999/2920/A – Boards for land for sale (non-illuminated). Approved 20 December, 1999.
4. Consultation Summary
Statutory Consultations
4.1Environment Agency:
Flood Risk
Parts of the site are located within Flood Zone 3 based on the latest indicative flood zone mapping but lies outside of the 1960 flood boundary based on existing flood records. The flood management strategy for Rotherwas is in the process of being reviewed with Herefordshire Council which when complete will finalise design flood levels for the estate and options for surface water management. Based upon the latest information, the proposed unit will be located just outside of the 1% plus climate change flood plain ie within Flood Zone 2/1.
Sequential Test:
Planning Policy Statement 25 requires a sequential risk based approach to determining the suitability of land for development with the aim of steering new development to areas with the lowest probability of flooding (Zone 1). As this proposal is not a major development, it is the responsibility of the Planning Authority to consider the sequential test.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Central Area Planning Sub-Committee at Herefordshire and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.