CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Herefordshire Council
Northern Area Planning Sub-Committee, Wednesday 11 March 2009 at 2.00pm

DCNE2009/2976/F - LARKRISE, KNAPP LANE, LEDBURY, HEREFORDSHIRE, HR8 1AN.

Deferred Planning 1 paper

Northern Area Planning Sub-Committee deferred this item on Wednesday 11 March 2009. Below is the council's own wording, with the papers it was decided on.

Item104

Resolved

That consideration of the application be deferred for a site inspection for the following reason: The setting and surroundings are fundamental to the determination or to the conditions being considered.
Word for word from the decision Herefordshire published for this meeting. Source: councillors.herefordshire.gov.uk

Follow this further

Built from Herefordshire's papers

What the report saysPro

Report to Northern Area Planning Sub-Committee

NORTHERN AREA PLANNING SUB-COMMITTEE 11 MARCH 2009

10 DCNE2008/2976/F - REPLACEMENT OF SINGLE STOREY DWELLING WITH THREE TWO STOREY HOUSES AND ATTACHED GARAGES. LARKRISE, KNAPP LANE, LEDBURY, HEREFORDSHIRE, HR8 1AN.

For: [name removed] per Stainburn Taylor Architects, Sear House, Bye Street, Ledbury Herefordshire, HR8 2AA.

Date Received: 3 December 2008 Ward: Ledbury Grid Ref: 71154, 38472 Expiry Date: 28 January 2009 Local Member: Councillors ME Cooper, JK Swinburne, and PJ Watts

1. Site Description and Proposal

1.1The application site lies on the northern side of Knapp Lane within the town boundary of Ledbury. Knapp Lane is a relatively narrow lane with no distinctive characteristics in terms of built-form. In fact it has a series of streets and cul-de-sacs off it. The site itself has an area in excess of 0.5 hectare. The site currently accommodates a 1930's bungalow and two outbuildings at the north-eastern part of the site. The site has two existing vehicular means of access both of which have sub-standard visibility splays. The eastern-most access has very poor splays in both directions whilst the western-most access has poor splays in the easterly direction. The front, southern part of the site is relatively open with scattered trees set in lawn. The rear northern part of the site is more densely wooded although between these trees there are long views to the north and west as the land beyond falls down an embankment to the railway line. A Tree Preservation Order has been made that protects those trees on site that are of the highest amenity value and are healthy. The trees protected are:-

• Two Douglas Fir to the west of the existing bungalow and a Silver Birch to the south-east. These are individually protected; • To the south and south-west a group of three silver birch, a Field Maple, a Copper Beech and a Cherry are protected that make a valuable contribution to the street scene; • To the north-east, in proximity to the existing outbuildings, a group consisting of one Yew Tree and one Sweet Chestnut are considered to have potential to make a long-term contribution to the area and are protected.

1.2The proposal is to demolish the existing bungalow and outbuildings, permanently close the existing vehicular means of accesses, create a new appropriately graded driveway further west and erect three dwellings along a contour. The level of the driveway will relate closely to the contour thus providing a natural degree of protection to the roots of existing trees.

1.3The proposed new dwellings would be four bedroomed. They would effectively be split- level dwellings designed over two floors such that they "sit" within the sloping land. The living areas are at first floor level to achieve the westerly views. The dwellings would be of a modern design that reflects sustainability principles. The asymmetrical roofs would have a pitch such that they can accommodate the proposed sedum roof. The dwellings

Further information on the subject of this report is available from [name removed] on 01432 261803 NORTHERN AREA PLANNING SUB-COMMITTEE 11 MARCH 2009

have been orientated to the west to maximise sunlight and solar gain. The rainwater from the roofs would be collected and recycled using a water harvesting system. Additional sustainability will be achieved through the use of photovoltaic collectors set within the south facing roofs of each staircase column.

1.4The entire design concept has been to maintain the woodland character and positioning the houses within the central area devoid of trees that are worthy of safeguarding.

1.5The garden areas have been deliberately limited in size to ensure that areas of woodland are retained around the site. It is understood that these areas would be transferred to a management company comprising the three owner / occupiers of the dwelling with a restrictive covenant preventing the future development of these woodland areas.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
DCNE2009/2976/F: LARKRISE, KNAPP LANE, LEDBURY, HEREFORDSHIRE, HR8 1AN.Appendix 523 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

16 of 21 attended
LB
Councillor LO BarnettMember, present
SB
Councillor Sebastian BowenMember, present
MC
Councillor ME CooperMember, present
JF
Councillor JP FrenchMember, apologies
JG
Councillor JHR GoodwinMember, present
KG
Councillor KG GrumbleyMember, present
JH
Councillor JW Hope MBEChairperson, present
BH
Councillor B HuntMember, apologies
RH
Councillor RC HuntMember, present
TH
Councillor TW HuntMember, present
TJ
Councillor Terry JamesMember, present
BP
Councillor Brig P Jones CBEMember, apologies

All 21 on the meeting page

More from Herefordshire Northern Area Planning Sub-Committee

All decisions
MeetingDecisionOutcome
16 Dec 2009 MINUTESThat the Minutes of the meeting held on 18 November 2009 be approved as a correct record and signed by the Chairman s... Approved Open
16 Dec 2009 Dmnc/092421/f - orchard court, maund court, bodenham, herefordshire, hr1 3ja.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... Approved Open
16 Dec 2009 Dmne/092456/f - knapp farm, pixley, ledbury, herefordshire, hr8 2qb.RESOLVED That planning permission be granted subject to the following conditions: 1 The existing building highlighted... Decided Open
16 Dec 2009 Dmne09/2359/f - 88 bridge street, ledbury, herefordshire, hr8 2an.RESOLVED That planning permission be granted subject to the following conditions: 1 The development hereby permitted ... Approved Open
16 Dec 2009 Dmne09/2018/f - plot adjacent 4 the crescent, colwall, herefordshire, wr13 6qn.RESOLVED That planning permission be granted subject to the following conditions: 1 The development hereby permitted ... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies