DCSW0009/1036/F - TOWN HOUSE, MADLEY, HEREFORDSHIRE, HR2 9LP.

Approved Planning 1 paper

Southern Area Planning Sub-Committee approved this item on Wednesday 28 October 2009. Below is the council's own wording, with the papers it was decided on.

Item53

Resolved

RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (full permission) 2 B01 Development in accordance with approved plans 3 C01 Samples of external materials 4 G10 Landscaping scheme 5 G11 Landscaping scheme - implementation 6 H13 Access, turning area and parking 7 L01 Foul/surface water drainage 8 L02 No surface water to connect to public system 9 L03 No drainage run-off to public system 10 L04 Comprehensive & Integrated draining of site 11 Prior to development, a wildlife protection and enhancement strategy shall be submitted to the Local Planning Authority and implemented as approved and maintained thereafter unless otherwise agreed in writing with the Local Planning Authority. Reason: To comply with Herefordshire Council’s Unitary Development Plan Policies NC6, NC8 and NC9 in relation to Nature Conservation and Biodiversity and to meet the requirements of PPS9 Biodiversity and Geological Conservation and the NERC Act 2006 12 H03 Visibility Splays 13 H06 Vehicular access construction 14 H13 Access, turning area and parking 15 H27 Parking for site operatives INFORMATIVES: 1 N15 Reason(s) for the Grant of Planning Permission 2 N19 Avoidance of doubt - Approved Plans 3 N11B Wildlife & Countryside Act 1981 (as amended) & Cons (Nat. HaB Bat)
Word for word from the decision Herefordshire published for this meeting. Source: councillors.herefordshire.gov.uk

Follow this further

Built from Herefordshire's papers

What the report saysPro

Report to Southern Area Planning Sub-Committee

SOUTHERN AREA PLANNING SUB-COMMITTEE 28 OCTOBER 2009

8 DCSW0009/1036/F DCSW/091187/F - CREATE TWO NEW DETACHED DWELLING UNITS AT TOWN HOUSE, MADLEY, HEREFORDSHIRE, HR2 9LP.

For: [name removed] per [name removed], 8a High Street, Ledbury, Herefordshire, HR8 1DS.

Date Received: 2 June 2009 Ward: Stoney Street Grid Ref: 342106,238869 Expiry Date: 28 July 2009 Local Member: Councillor DC Taylor

1. Site Description and Proposal

1.1The application site is some 100 metres to the north of the main crossroads in Madley, between the B4349 road and C1196 road. The site gains access via the existing farm entrance which also serves a bungalow (Court View), immediately to the north.

1.2The scheme has been revised from the original submission such that the weather boarded garages now form a block of buildings on the southern boundary of the site and each of the proposed units adjoins a corner of the garage block. This creates a courtyard and a boundary wall to the site adjoining immediately to the south, complimenting the existing farm buildings to the south (which are the subject of a separate agenda item). The design for each of the two units on this site remains as originally proposed. The dwellings will comprise a combination of brick and stone elevations with slate roof coverings that have been designed to reflect those that might be found in traditional farm buildings. The dwellings will be 8 and 8.1 metres to the ridge, lower than the listed barn to the south which is 8.8 metres to the ridge.

1.3The boundary treatment will comprise hedges, estate fencing (as presently used on the site), brick walling and post and rail fencing. The steel framed barns on the site would be removed in order to make way for the new dwellings and garaging.

1.4The site is within the settlement boundary of Madley and accordingly the principle of residential development is acceptable. The acceptability of this proposal, therefore, primarily relies on the detailed design, form and layout in relation to the existing farm buildings immediately to the south.

1.5The revised scheme has been the subject of re-consultation with previous consultees, including the Parish Council and local residents.

2. Policies

2.1Planning Policy Statements

PPS1 - Delivering Sustainable Development PPG13 - Transport PPG15 - Planning and the Historic Environment

2.2Herefordshire Unitary Development Plan

Policy S2 - Development Requirements Policy DR1 - Design Further information on the subject of this report is available from [name removed] on 01432 261932 PF2 SOUTHERN AREA PLANNING SUB-COMMITTEE 28 OCTOBER 2009

Policy DR2 - Land Use and Activity Policy DR3 - Movement Policy DR5 - Planning Obligations Policy H4 - Main Villages: Settlement Boundaries Policy H13 - Sustainable Residential Designs Policy HBA4 - Setting of Listed Buildings

3. Planning History

3.1DCSW2004/2484/F Conversion of barns to two dwellings - Approved and demolition of steel framed barns. 20.09.04

DCSW2004/2485/L Conversion of barns to two dwellings - Granted 20.09.04 and demolition of steel framed barns.

3.2These applications relate to the barns to the south of the application site, which are the subject of a separate agenda item.

4. Consultation Summary

Statutory Consultations

4.1Welsh Water recommends that conditions be attached to any grant of planning permission.

Internal Council Advice

4.2The Traffic Manager recommends conditions for the visibility splay and advises on position of detached garages proposed.

4.3The Conservation Manager states that the originally submitted scheme had a poor layout, as the garages were too prominent and that the designs needed further consideration. The revised layout is important in relation to existing buildings. The materials used are crucial and need to be conditional. It is also recommended that completion be attached as regards wildlife protection and enhancement strategy.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
DCSW0009/1036/F: TOWN HOUSE, MADLEY, HEREFORDSHIRE, HR2 9LP.Report 106 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

11 of 16 attended
RC
Ricky ClarkeSecretary, expected
PC
Councillor PGH CutterChairperson, present
MF
Councillor MJ FishleyVice-Chairperson, present
CB
Councillor CM BartrumMember, present
HB
Councillor Harry BramerMember, apologies
BD
Councillor Barry DurkinMember, apologies
AG
Councillor AE GrayMember, present
JH
Councillor JA Hyde sadly passed away on Monday 11 February 2019.Member, present
JJ
Councillor JG JarvisMember, present
GL
Councillor G LucasMember, present
PP
Councillor Philip PriceMember, present
RS
Councillor RH SmithMember, present

All 16 on the meeting page

On this subject at Herefordshire

Search all
  1. DCSW0009/1036/F - TOWN HOUSE, MADLEY, HEREFORDSHIRE, HR2 9LP.This decision
  2. Dcsw0009/1038/f & dcsw0009/1039/l - town house farm, madley, herefordshire, hr2 9lpApproved
  3. Dcsw2006/3874/o - longtown village hall, longtown, herefordshire, hr2 0nz (agenda item 9)Agreed
  4. DCSW2006/2411/F - THE GARN FARM, CLODOCK, LONGTOWN, HEREFORDSHIRE, HR2 0PE. (Agenda Item 11)Approved
  5. DCSW2005/1135/RM - Land South of Pontilla, Longtown, Herefordshire (Agenda Item 11)Approved
  6. DCSW2004/1499/O - OS.0034, land south of Pontilla, Longtown (Agenda Item 6)Approved

More from Herefordshire Southern Area Planning Sub-Committee

All decisions
MeetingDecisionOutcome
23 Dec 2009 MINUTESThat the Minutes of the meeting held on 25 November 2009 be approved as a correct record and signed by the Chairman. Approved Open
23 Dec 2009 Dmse09/2571/f - ashdown, llangrove, ross-on-wye, herefordshire, hr9 6ep.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... Approved Open
23 Dec 2009 Dmsw09/1993/f - oldfield farm, garway hill, hereford,RESOLVED That, subject to the receipt of details of the visibility splay and confirmation that the Traffic Manager is... Approved Open
23 Dec 2009 Dmse09/2727/f - caradoc court, sellack, ross-on-wye, herefordshire, hr9 6ls.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... Approved Open
23 Dec 2009 Dmse09/2758/f - green orchard, ryefield road, ross-on-wye, herefordshire, hr9 5ls.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies