Resolved
The application was approved in accordance with the case officer’s recommendation.
Planning and Regulatory Committee approved this item on Wednesday 28 November 2012. Below is the council's own wording, with the papers it was decided on.
Resolved
The application was approved in accordance with the case officer’s recommendation.
MEETING: PLANNING COMMITTEE
DATE: 28 NOVEMBER 2012 TITLE OF S122606/F - SINGLE 50KW WIND TURBINE, WITH A REPORT: MAXIMUM BLADE TIP HEIGHT OF 25.1M ALONG WITH IMPROVEMENT OF ACCESS TRACK, ELECTRICAL SWITCHGEAR HOUSE WITH ASSOCIATED UNDERGROUND CABLING AND TEMPORARY CRANE HARDSTANDING AT PENTWYN FARM, DORSTONE, HEREFORDSHIRE HR3 6AD
For: [name removed] per Maxet House, 28 Baldwin Street, Bristol, BS1 1NG
WEBSITE http://www.herefordshire.gov.uk/housing/planning/58286.aspx?ID=122606&NoSearch=Tr ue LINK: Date Received: 21 September 2012 Ward: Golden Valley North Grid Ref: 329153,242256 Expiry Date: 28 November 2012 Local Members: Councillor Cllr PD Price
1. Site Description and Proposal
1.1The application states that Pentwyn is a hill farm of some 35.6 hectares (88 acres) approximately 2 kilometres west of Dorstone village. It is accessed via a minor road from the B4348 road to Hay-on-Wye, which is 7 kilometres to the west. The area is hilly, and there are no other dwellings visible from the farmhouse or the application site. The Brecon Beacons National Park boundary is approximately 5 km to the west and just visible from the farm. The nearest neighbours are Cwm Farm and Brynspeard Farm; both are more than 500 metres from the actual proposal site and neither is visible from it, or from Pentwyn Farmhouse. The proposal is to erect a single 50 kW (0.5mW) 3-blade wind turbine, 16.85 metres to the hub; 25.1 metres to the blade tip. It would be located in one of the farm’s sheep pastures approximately 200m north of the farmhouse and a height of just over 300 metres AOD. A switchgear building/kiosk approximately 2m x 2m would be necessary on site. A suitable electricity connection is said to be available within the farm, subject to appropriate equipment being installed on an existing transformer pole near the farmhouse. Cabling from the turbine to the connection would be lain underground, at a suitable distance from hedge-lines with no necessity to cross any roads. Temporary infrastructure would be required during the construction phase, as follows:
− A temporary field track of between 200 and 300 metres, to be allowed to grass over on completion of the construction. Existing farm tracks would also be used, following routine repairs. Subsequent maintenance access to the turbine would entail an occasional 4WD vehicle (estimated twice yearly). − A crane hardstanding, approximately 8m x 10m, constructed from clean permeable crushed aggregate, to be removed on completion; − Temporary materials staging area for equipment and components during construction, to be removed on completion. Further information on the subject of this report is available from Debby Klein on 01432 260136 PF2 1.2 This application is a resubmission of application reference S121643/F, which was withdrawn on 13 September 2012. That application was for a turbine of 24.6m to the hub; 34.2m to the blade tip. Key issues for objectors on this resubmission and the withdrawn application are outlined and discussed below in consideration of this resubmission. The applicant considered the views of residents, with particular reference to turbine height, and agreed to propose a shorter turbine with a projected output similar to the first proposal, attributed to sourcing a more efficient model.
1.3A formal Screening Opinion as to whether Environmental Impact Assessment (EIA) would be necessary was issued on 14 February 2012. This concluded that EIA would not be required because (a) it would only exceed the height threshold, not the number of turbines; (b) the site is not in a ‘sensitive area’ as defined in the legislation, and (c) the specification falls well below the indicative output criteria of 50 MW given in Circular 02/99. A second Screening Opinion was issued on 20 September relating to the revised scheme. As the height would be reduced the original Screening was confirmed.
2. Policies
2.1Legislation
Town and Country Planning (Environmental Impact Assessment) Regulations 2011
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
S122606/F: PENTWYN FARM, DORSTONE, HEREFORDSHIRE HR3 6ADReport | 196 KB | DownloadRead as text |
Follow Planning and Regulatory Committee at Herefordshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 14 Oct 2026 | 260943 - land southeast of woonton farm, woonton, almeley, herefordApplication approved in accordance with the case officer’s recommendation and a change to the conditions. | Approved | Open |
| 14 Oct 2026 | 253316/253317 - 123 the homend, ledbury, herefordshire, hr8 1bpApplication approved, contrary to the case officer’s recommendation. | Approved | Open |
| 9 Sep 2026 | 251908/251909 - land at town well station road, credenhill, herefordshire, hr4 7dwApplication approved in accordance with the case officer’s recommendation. | Approved | Open |
| 9 Sep 2026 | 261671 - town well, station road, credenhill, hereford, herefordshire, hr4 7dwApplication approved in accordance with the case officer’s recommendation. | Approved | Open |
| 9 Sep 2026 | 260149 - land south east of greyhound close, longtown, hereford, herefordshireApplication approved in accordance with the case officer’s recommendation. | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.