RESOLVED – That, contrary to officer recommendation, the application be REFUSED for the reasons stated below:- Reasons / Policies New evidence obtained to show that the Bank Street access is preferable and is already in place and working satisfactorily, with little or no impact. (Proposed by Councillor Jackson and seconded by Councillor Roberts.)
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL PLANNING APPLICATIONS COMMITTEE
15th February 2018
Application SMD/2017/0784. No: Location Land adjacent to 3 Meadow Drive, Cheadle. Proposal Variation of conditions 2, 6, 11, 12 and 15 relating to application reference number SMD/2014/0471. Applicant Wrekin Housing Trust. Agent DJD Architects. Parish/Ward Cheadle. Date registered 28/11/2017. If you have a question about this report please contact: [name removed] [email protected]
REFERRAL
This application is being put forward for consideration by Planning Applications Committee as the proposal is controversial locally and Members made the previous decision to grant planning permission for the site in the first instance.
1. SUMMARY OF RECOMMENDATION
APPROVE subject to the signing of a deed to vary the original S106 agreement and reinstatement/modification of previous conditions.
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The application site is a roughly 'L' shaped parcel of land to the south/rear of Bank Street, Cheadle. Dwellings fronting Meadow Drive are located to the west with dwellings fronting The Avenue to the south. To the east are a number of Listed Buildings including the Pugin designed St Giles' R.C Church (Grade 1), St Giles R.C School (Grade II) and a building fronting Bank Street currently in use as a dwelling (Grade II). The site is located within the Cheadle Town Development Boundary, close to the town centre. A small section of the northern part of the site is positioned within the Cheadle Conservation Area; this area contains the Bank Street fronting buildings only. Access to the site was through an archway connecting directly with Bank Street but Members will be aware that at present vehicular access for construction traffic is taken from Bank Street along what was the footpath linking Bank Street to Meadow Drive.
3. DESCRIPTION OF THE PROPOSAL
3.1The application seeks to vary conditions 2, 6, 11, 12 and 15 relating to planning approval reference SMD/2014/0471 which gave consent for the redevelopment of redundant allotment land and buildings to affordable housing, consisting of 42 dwellings (30 new builds and the conversion of 5-7 Bank Street into 12 flats). The demolition of redundant workshops also formed part of the proposal. The application was approved by the Planning Applications Committee in November 2014. A copy of the SMD/2014/0471 decision notice has been appended to the end of this report for Members to easily see the conditions which are referred to.
The applicants request that the conditions are amended as follows;
Condition 2
The development hereby approved shall be carried out in accordance with the following submitted plans; 2015/K787/106(G), 109(-), 210(E), 212(D), 214(D), 216(E), 218(F), 220(E), 222(F), 224(D), 225(D), 227(D), 229(E), 231(D), 233(D), 235(D), 310(A), 311(G), 312(F), 313(G) and 320(D) unless agreed otherwise in writing by the Local Planning Authority.
Condition 6
Windows W.1.E.9, W.1.E.15, W.1.E.16, W.2.E.9A, W.2.E.14 and W.2.E.15 indicated on elevation drawing K787/320(D) shall be obscure glazed (Pilkington Optifloat Opal Privacy Level 5) completed prior to first occupation of the apartments hereby approved and retained for the lifetime of the development unless otherwise agreed in writing by the Local Planning Authority.
Condition 11
Prior to occupation the detailed design of the off-site highway works, generally in line with drawing 2015/K787/106(D) but to adoptable standards, shall be submitted to and approved in writing by the Local Planning Authority.
Condition 12
The off-site highway works shall thereafter be constructed in accordance with the approved details.
Condition 13
Rectification of damage to the highway during site construction works, against submitted photographic schedule of condition (24 January 2017) shall be completed prior to first occupation of the development unless otherwise agreed in writing by the Local Planning Authority.
Condition 15
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.