RESOLVED – 1. That the application be APPROVED for the reasons and based on the policies contained in the report, subject to the amended condition 3 as outlined above. 2. That, in the event of changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/informatives/planning obligations or reasons for approval/refusal) prior to the decision being issued, the Executive Director (Place) be delegated authority to do so in consultation with the Chairman of the Planning Applications Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision. (Proposed by Councillor Gledhill and Seconded by Councillor Cawley.)
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL PLANNING APPLICATIONS COMMITTEE
7 March 2019
Application SMD/2019/0036 No: Location Skate Park, Brough Park, Fowlchurch Road, Leek, ST13 6AS Proposal Installation of 5 freestanding lighting columns each with a 295 watt LED luminaire. Applicant [name removed], Staffordshire Moorlands District Council Agent None Parish/Ward Leek Date registered 22/01/2019 If you have a question about this report please contact: [name removed] tel: 01538 395400 ex 4127 [email protected]
REFERRAL
The application is brought before Planning Committee because it has been submitted by the Council’s Commissioning Service/Contract Management, Leisure and Recreation.
1. SUMMARY OF RECOMMENDATION
APPROVE with conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1Brough Park is a public park in Leek. The open park land is enclosed and shaped by belts of mature trees that provide a sense of seclusion from the surrounding areas of residential development. Footpaths provide passage between and connect different areas of space within the park.
2.2Brough Park was first established in the late 18th Century over a previous field system as a landscape park to provide setting to Ball Haye Hall, which was finally demolished in 1972. The landscape park was opened as a municipal park in 1924. The recently refurbished skate park is located within a central grouping of facilities which include the sports centre, children's playground, bowling greens, and tennis courts all 20th century/early 21st Century developments that reflect the evolution of the park from a late 18th century landscape garden to a 20th century Municipal Park. 2.3 The integrity of the park’s historic character is well preserved despite the late 20th/early 21st century development. Aspects of the parkland such as the ornamental lake and walled garden to the north of the skate park and the planting within the park retains elements which relate to its origins as a designed landscape park in the late 18th century and part of a working country estate until the early 20th century.
3. DESCRIPTION OF THE PROPOSAL
3.1In the winter months, during evening hours of darkness, the development would illuminate the recently refurbished skate park with the installation of 5 freestanding lighting columns and bracket mounted 295 watt LED luminaires. Refurbishment and redevelopment of the skate park was recently carried out without planning permission as development permitted by the provisions of the General Permitted Development Order available to Local Authorities. However, the installation of the lights is not permitted development and it requires planning permission because the lights would be equipment that exceeds 4 metres in height.
3.2The columns would be evenly spaced to the edges of the facility, three placed along the western edge and two to the east, each supporting a single luminaire unit. To achieve an appropriate spread of light across features that include sunken bowls, and to avoid any shadow cast, each lighting column must be 8 metres high. The columns would be made from grey die-cast aluminium and be similar in appearance, in terms of size and design, to a very tall street light. The LED luminaires would be flat square boxes, approximately 50 cm by 50 cm, attached to the column with a bracket.
3.3The lights would be used for approximately 4 months of the year so that the skate park can be used from dusk until 20:30 hours in the winter. The lights would be operated with an adjustable timer control located inside the men’s bowling pavilion and managed by staff from the leisure centre. The staff would also have a remote control unit to override the timer. If there are any problems at the site, such as unwanted behaviour, or if the weather is poor, the lights could be switched off quickly before the timer control is triggered.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.