RESOLVED – 1. That the application be REFUSED for the reasons and based on the policies contained in the report. 2. In the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/informatives/planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Development Services has delegated authority to do so in consultation with the Chairman of the Planning Applications Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision. (Proposed by Councillor Lea and seconded by Councillor Hoptroff.)
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL PLANNING APPLICATIONS COMMITTEE
12 March 2020
Application SMD/2019/0320 No: Location Land at Ball Green Farm, Woodhouse Lane, Brown Edge Proposal A cubicle shed for the housing of the dairy herd - Phase 2. Resubmission of SMD/2018/0027 Applicant [name removed] Bill Parry Parish/ward Brown Edge Date registered 21/05/2019 If you have a question about this report please contact: Mark Ollerenshaw tel: 01538 395400 ext 4921 [email protected]
REFERRAL
This application is to be decided at Planning Applications Committee as requested by Cllr Heath and the application is locally contentious
1. SUMMARY OF RECOMMENDATION
REFUSE
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1Ball Green Farm is a well established farm business comprising 273 acres and a further 120 acres rented. The site comprises part of a field located to the north east of Ball Green Farm and east of Gorsey Bank, Brown Edge. The site is located within the SMDC boundary, however, the farmhouse itself together with neighbouring residential properties within close proximity to the west / north west and Ball Green Assembly of God Church, are within the Stoke on Trent Council area.
2.2The site is within the Green Belt and Countryside.
3. DESCRIPTION OF THE PROPOSAL
3.1The application is for the erection of a steel framed cubicle building Phase 2 for the housing of cattle and is a resubmission of a previously refused application, ref SMD/2018/0027.
3.2The proposed building, which is to be constructed in three phases, will, when fully completed, contain 256 cubicles in banks either side of a central feed passage. 3.3 The proposal is a steel portal framed building which shall be finished in coloured plastisol box profile above 2 m concrete panels and a fibre cement sheet roof. In total it will be 55 metres long and 36.6 metres wide consisting of three phases. The finished building including all stages would have a height to eaves of 4.75 metres on the north western elevation and 7.72 metres on the south western. The ridge height from floor level would be 8.5 metres.
3.4This application is for Phase 2, one of the sides of the main building which shall be 55 metres long x 9.1 metres wide. (Separate applications for Phases 1 and 3 which involve the construction of the main building and a wing to either side of the building are considered elsewhere on this agenda).
3.5The application explains that: “Within the farm, given the topography of the land, there are very few relatively flat areas where a building of this type could be placed. Those that are available would require not only the construction of a building but also further accommodation for dry and calving cows, a milking parlour, dairy and completely new slurry storage system. The proposed site is not ideal but the proposal is that the north western long elevation will be built into the slope with the lower 1.5 metres being below ground level”.
3.6The proposals include a planting belt along the north western side elevation of the building between the proposal and the neighbouring properties at Farm Lea and Heather View.
3.7The farm is operated by 4 full time staff whose only employment is on the holding. These are the applicant together with his 2 sons and his niece. They all participate in the full management and running of the holding.
3.8The application, the details attached to it, including the plans, comments made by residents and the responses of consultees can be found on the Council’s website at:-
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.