That the Late Representations report be noted; 2. That the application be APPROVED for the reasons and based on the policies contained within the report; 3. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision (Proposed by Councillor Hoptroff and seconded by Councillor Johnson)
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL PLANNING APPLICATIONS COMMITTEE
26th October 2023
Application SMD/2022/0014 No: Location Moneystone Quarry Cheadle Road Oakamoor Staffordshire ST10 2DZ Proposal Proposed construction of a revised surface water outfall associated with Moneystone Park leisure development and engineering operations to infill the existing outfall structure. Applicant Laver Leisure (Oakamoor) Limited Agent Asteer Planning LLP Parish/ward Kingsley and Oakamoor Date registered 12/01/2022 If you have a question about this report please contact: Jane Curley tel: 01538 395400 ex 4124 [email protected]
REFERRAL
This application relates to an adjacent and approved leisure scheme which is a major application and for which the first reserved matters application is also on this Agenda, reference SMD/2019/0646. It involves a small amount of development in the Whiston Eaves SSSI. The application is locally contentious.
1. SUMMARY OF RECOMMENDATION
APPROVE subject to conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1This is an irregular shaped parcel of land extending to approximately 1235 sq m. The site is located in the south western corner of Quarry 3 at Moneystone Quarry. It provides a connection between the lake in Quarry 3 (Q3) and a tributary of the River Churnet known as Stream A. It comprises the lakeside edge, an access track, woodland and grassland. Part of the site lies within the Whiston Eaves SSSI
3. DESCRIPTION OF THE PROPOSAL
3.1This is a full application for the construction of a new surface water outfall associated with the adjacent leisure scheme and engineering operations to infill the existing outfall structure.
3.2The existing outfall consists of a concrete weir and outlet pipe. In June 2021 the applicant undertook some unauthorised engineering works next to the existing outfall in the form of a trench/channel. A siphon consisting of two flexible hoses currently regulates the water level in Q3 which the application documents say is currently at around 156m AOD.
3.3Whilst the majority of the proposal falls within the site boundary of the outline permission for the leisure scheme SMD/2016/0378, a small area extends beyond hence the reason why the applicant has submitted this separate full planning application.
3.4The proposal is for a new channel / cutting to be made between Quarry 3 Lake and the established watercourse, known as Stream A. The new outfall entry level will be 156m AOD and the channel base cut at 155.9m in order to maintain the water level in Quarry 3 no higher than 156m, the level agreed with Natural England.
3.5The plans show a cutting through the land bridge extending to an area approx. 26m by 27m with excavation up to approx. 4m (see Landscape General Arrangement Plan and Sections 1088.4-PLA-00-XX-DR-L-0007 Rev PO.3 and 009 Rev PO3). The outfall channel itself is shown to be 600mm wide and 500 mm deep. From the channel and within the ‘quarry side’, land will then be gently graded at 1:3. To minimise the excavation within the SSSI the land is shown graded at 1:1. The top of the embankment is shown to be fenced with 1.1m high post and rail fencing. Spoil gained from the cut is shown spread in an area generally following the existing track as shown on the plans albeit that no details are given.
3.6The submitted Method Statement refers to a permanent new access track, at least 3m in width to be cut down to the lowered area on the lake side of the landbridge. The applicant has clarified this to be for maintenance purposes and it is now shown on the revised Site Plan Outfall Area revision 16.
3.7An outline Method Statement is provided which details construction and ecological measures to be agreed prior to works commencing and subsequently implemented throughout the construction process to mitigate any adverse impact on the SSSI. In addition Table 9.4 Ecology Mitigation Measures in the ES Addendum.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.