That the Late Representations report be noted; 2. That the application be APPROVED for the reasons and based on the policies contained within the report; 3. That the following condition be added: a. A risk assessment of the site to be carried out by the Fire Service. 4. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision (Proposed by Councillor Flunder and seconded by Councillor Roberts)
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL PLANNING APPLICATIONS COMMITTEE
16 November 2023
Application SMD/2023/0263 No: Location Land off Draycott Cross Road, Brook Houses, Cheadle Proposal Proposed Development of a Battery Storage System, associated infrastructure and access. Applicant Balance Power Projects Agent Axis Parish/ward Cheadle Date registered 20/06/2023 If you have a question about this report please contact: Rosie Dinnen [email protected]
REFERRAL
The proposal is for major development in the Green Belt.
1. SUMMARY OF RECOMMENDATION
Delegate authority to Approve with conditions.
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The site comprises 1.84 hectares of agricultural land within the Green Belt. The site is situated on the western side of Draycott Cross Road, adjacent to the Hillside Industrial Estate and opposite the Brookhouse Industrial Estate. A public right of way (Cheadle 18) crosses through a small section of the site. The site falls from a high point of circa 166m AOD (south-western corner) in a north-easterly direction to circa 155m AOD (north-eastern corner). Overhead powerline cross the field with one of the lines connecting to a small electricity sub-station on Draycott Cross Road.
2.2A hedgerow extends along the site frontage and there are two gated field access points along this boundary. A watercourse and a conifer plantation woodland lies to the north-western boundary with allotments beyond. The application site forms part of a wider field that will remain in agricultural use and is undeveloped.
3. DESCRIPTION OF THE PROPOSAL
3.1The proposed development is for a battery energy storage system (BESS), with access and landscaping. The application seeks permission for 40 years, after which time the battery energy storage infrastructure will be removed from the site. The BESS would connect to the Forsbrook substation (a bulk supply point).
3.2The battery storage infrastructure comprises two separate compounds:
Southern compound - site area: 3,150sqm: 9 battery units battery containers (19m long x 2.7m wide and 3m high) each supported inverter/transformer container (6.1m long x 2.7m wide and 3m high); A storage building (12.3m long x 3.9m wide and 4m high) GRP construction with double leaf doors
Northern compound - site area: 3,950 sqm:
7 battery containers (19m long x 2.7m wide and 3m high) each supported inverter/transformer container (6.1m long x 2.7m wide and 3m high) A storage building (12.3m long x 3.9m wide and 4m high) GRP construction with double leaf doors A control room/welfare building (17.1m long x 4.1m wide and 4m high) GRP construction with double leaf doors Distribution Network Operator (DNO) room (7.1 m long x 6.2 m wide and 4.0 m high) of GRP construction with double leaf doors. Private substation (15.6 m long x 4.0 m wide and 4.0 m high) of GRP construction with double leaf doors and high-level ventilation louvres. Auxiliary transformer set within a compound (4.1 m long x 3.6 m wide and 2.5 m high) secured by palisade fencing.
3.3All the above infrastructure would be set in gravel surfaced compounds which would be secured by 2.4 m high paladin fencing, matching double leaf gates and CCTV cameras would be set on free standing poles 3.4 m high, located at various points within the compounds. A proposed height parameter plan has been submitted with the application which illustrates up to 3.5m high for the BESS/transformers and up to 4.5m high for the other infrastructure, these heights are set as maximum (i.e. worst case).
3.4The site would be accessed by a new 6m gravel track leading to an existing field gate access on Draycott Cross Road. Within the site, an area of hardstanding will facilitate vehicles to manoeuvre and park. The track would be formed by removing the existing top- soil, laying a geotextile membrane on which a hardcore surface would be laid thus enabling a permeable surface.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.