That the application be REFUSED for the reasons and based on the policies contained within the report; 2. That the Late Representations report be noted; 3. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision (Proposed by Councillor Flunder and seconded by Councillor Emery)
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL PLANNING APPLICATIONS COMMITTEE
29th February 2024
Application SMD/2022/0076 No: Location Land Off Bemersley Road Brown Edge Staffordshire Proposal Construction of a temporary 49.35MW battery storage facility, to include a compound, a DNO control room, a customer substation, security fencing, landscaping and other associated infrastructure. Applicant Anesco Agent Barton Willmore Parish/ward Brown Edge Date registered 4/3/22 If you have a question about this report please contact: Jane Curley tel: 01538 395400 ex 4124 [email protected]
REFERRAL
This is a major application which has attracted significant local interest
1. SUMMARY OF RECOMMENDATION
REFUSE
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The application site is a greenfield site situated outside of a settlement boundary in open countryside. It is also within Green Belt. The site extends to approx. 1.85 hectares and is currently laid as pasture land. It lies on the lower eastern-facing slopes of the valley formed by the River Trent, between the settlements of Ball Green, approx. 250m to the south-west and Brown Edge which is approx. 1km to the east and on an elevated plateau. The site is surrounded on all sides by agricultural fields which also separate the site from Bemersley Road. Boundaries are a mix of native hedgerow and trees and post and wire fencing.
2.2A new access is proposed to serve the site from Bemersley Road. It will require the removal of some of the existing hedging.
2.3The main body of the site has an appreciable level change as it falls eastwards. Plans submitted show that the access road enters the main body of the site in the south west corner and from here runs north eastwards across the slope, meandering down to the substation compound. Sections show that the battery containers sit on a series of level platforms creating a terrace effect down the valley side. The containers are shown raised from the plinths by 0.4m on ‘legs’. The applicant has clarified that this is due to the cable entry for the containers being at the bottom and therefore the cable trays pass under the cabinets Public Footpaths Brown Edge 6 and 13 (part of the Staffordshire Moorlands walks) lie closest to the site to the east. Brown Edge 8 lies further to the east/south east.
3. DESCRIPTION OF THE PROPOSAL
3.1This is a full application for a battery storage facility capable of importing and exporting approx. 49.35 MW of electricity
3.2The key elements of the proposal are as follows:
11 Battery containers 9.33m by 1.71m by 2.59m 11 MV stations 2.9m high, 6.6m long and 2.4m wide to be painted green A 132kV substation compound, with a maximum height of 5.5m, with a District Network operator (DNO) substation (up to a height of 3.75m), Customer substation (approx. 13.8m by 3,24m by 2.9m) DNO substation A new access onto Bemmersley road and access track leading to the compound Fencing. The battery compound will be enclosed with 2m high deer fencing which comprises of timber posts and wire mesh, whilst the 132kV s ubstation will be enclosed with palisade fencing, 2.4m in height which is said to be required for safety and security purposes and also stock proof fencing. Acoustic fencing of 3.5m in height surrounds the battery compound. This is shown on the updated Noise report but not on the Site layout plan A security beam system will be installed around the fence perimeter. The security beams will be approximately 1.2m off the ground and will employ laser technology so no artificial lighting will be required.
3.3The point of connection is at the Chatterley Whitfield substation which is approx. 2km to the north west. The route of the cabling from the application site to this substation is unknown. The applicant says the DNO is responsible for this part of the proposal and carries out such work under permitted development
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.