CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Climate Change Working Group (SMDC), Wednesday 12 June 2024 at 6.00pm

To Approve the Minutes of the Previous Meeting

Approved Committee 1 paper

Climate Change Working Group (SMDC) approved this item on Wednesday 12 June 2024. Below is the council's own wording, with the papers it was decided on.

Item31

Resolved

That the minutes of the previous meeting held on 24 April 2024 be approved.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Climate Change Working Group (SMDC)

STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL CLIMATE CHANGE WORKING GROUP (SMDC) DECISIONS WEDNESDAY, 24 APRIL 2024 PRESENT: Councillor M Johnson (Chair)

Councillors C Boone, C Brady, K Flunder, J Garvey, I Herdman, T Holmes, C Jebb, J Kempster, J Porter and M Spooner

IN ATTENDANCE: Councillors K Hoptroff, D Pascall, M Swindlehurst and N Yates

27 DECLARATIONS OF INTEREST

No interests were declared.

28 TO APPROVE THE MINUTES OF THE PREVIOUS MEETING

RESOLVED:

That the minutes of the previous meeting held on 19 March 2024 be approved.

29 PEAK CLUSTER PROJECT - JOHN EGAN, PROGRESSIVE ENERGY LTD

The Group received a presentation from the Project Director of Progressive Energy, who develop and implement low-carbon projects to support the decarbonisation of the energy sector.

The Project Director advised that the ‘Peak Cluster’ cement and lime facilities within Staffordshire and Derbyshire together:

 Produce 40% of the UK’s lime and cement  Emit 3 million tonnes of carbon dioxide per year  Account for over 23% of emissions in Staffordshire and Derbyshire

The Project Director stated that there is no other grouping like this within the UK, and that Cement is a vital material for construction and is the most consumed human- made substance on the planet.

It was explained that, to make cement or lime, limestone is taken out of the ground and thermally processed at high temperatures, and this process inevitably generates carbon dioxide. The fuel being used to create the heat causes a third of the carbon dioxide emissions, and the emissions from the limestone material itself account for the other two thirds. This carbon dioxide needs to be captured, to prevent it from going into the atmosphere, and locked away (sequestered). This technology is called carbon capture and storage, and is required to achieve carbon neutrality. Climate Change Working Group (SMDC) - 24 April 2024

The Project Director explained that the project will involve building a carbon capture plant at each of the five big cement and lime sites. This is a large piece of equipment which captures the carbon dioxide out of the flue gas before it goes up the chimney into the atmosphere. The captured carbon dioxide then needs to be stored in depleted gas fields, deep below the seabed. This will involve connecting the five sites and transporting carbon dioxide by pipeline to the Irish Sea.

The Project Director advised the Group that Progressive Energy is looking at pipeline corridors to ascertain a sensible route, and that construction will be similar to a gas or waterpipe. However, there are multiple factors to consider, for example, the route will not be built through built-up areas; ecologically sensitive sites will be avoided where possible; and topography – pipes will not be built on steep slopes for example. This process is ongoing and will be in the public domain in the Autumn of 2024, and will then go to consultation with the relevant bodies.

The Group was advised that Progressive Energy will spend a lot of time in public consultations with local authorities, other statutory bodies, landowners and the public. As this project is of national significance, permission will then be sought via the Secretary of State, and not the Local Planning Authority.

The ambition for the project is to be operational by 2030.

The Group discussed a number of further issues relevant to the project, including: the stability and ecological impact of the Irish Sea storage sites; planning arrangements for the carbon capture plants; the economic and regulatory factors affecting the decision on project go-ahead; and opportunities for Biodiversity Net Gain and how these might be captured for the Council’s Plan For Nature.

RESOLVED:

That the presentation be noted with thanks.

The meeting closed at 7.00 pm

_________________________________Chairman

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
To Approve the Minutes of the Previous MeetingMinutes 202 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

10 of 20 attended
MJ
Councillor Mark JohnsonChair, present
CJ
Councillor Christina JebbVice-Chair, present
PB
Councillor Philip BarksCommittee Member, present
CB
Councillor Connor BradyCommittee Member, absent
MD
Councillor Marc DuroseCommittee Member, present
KF
Councillor Keith FlunderCommittee Member, present
JG
Councillor Jim GarveyCommittee Member, present
IH
Councillor Ian HerdmanCommittee Member, present
TH
Councillor Tony HolmesCommittee Member, present
KH
Councillor Keith HoptroffCommittee Member, present
JK
Councillor Jonathan KempsterCommittee Member, apologies
JP
Councillor Joe PorterCommittee Member, present

All 20 on the meeting page

On this subject at High Peak

Search all
  1. To Approve the Minutes of the Previous MeetingThis decision
  2. To approve the minutes of the previous meetingApproved
  3. To approve the minutes of the previous meetingApproved
  4. To approve the minutes from the previous meetingApproved
  5. To approve the minutes of the previous meetingApproved
  6. To approve the Minutes of the previous meetingApproved

More from High Peak Climate Change Working Group (SMDC)

All decisions
MeetingDecisionOutcome
23 Apr 2025 To Approve the Minutes of the Previous Meeting.That the minutes of the previous meeting held on 24 February 2025, be approved as a correct record. Approved Open
23 Apr 2025 Delivery UpdatesThat the presentation be received. 2. That Officers review the possibility of creating graphics for public education ... Decided Open
23 Apr 2025 Climate Change and Nature Working Group Proposal.That the presentation be received. 2. That the proposal for a Joint Climate Change and Nature Steering Group be noted. Noted Open
24 Feb 2025 To approve the minutes of the previous meetingThat the minutes of the previous meeting held on 27 November 2024, be approved as a correct record. Approved Open
24 Feb 2025 Results of SMDC ConsultationThat an Action Plan be produced from the results of the consultation taking into account members’ comments, as stated... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies