That the Late Representations report be noted; 2. That delegated authority be granted to the Head of Development Services in consultation with the Chairman to APPROVE, subject to conditions, confirmation of no outstanding objections from Environmental health and no material changes in policy arising from the new NPPF. (Proposed by Councillor Johnson and seconded by Councillor Hoptroff)
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 12th December 2024
Application SMD/2024/0055 No: Location Land south of Cellarhead Substation and west of Rownall Road, Wetley Rocks, Staffordshire Proposal Erection of a Flexible Energy Facility, associated works, landscaping and habitat creation Applicant S & C Energy Limited Agent [name removed], Surface Planning Parish/ward Cheddleton Date registered 13th February 2024 If you have a question about this report please contact: Declan Cleary, [email removed]
REFERRAL
The application is major planning application and the Committee have considered similar proposals within the area.
1. SUMMARY OF RECOMMENDATION
GRANT DELEGATED AUTHORITY to the Head of Development Services in consultation with the Chairman to APPROVE, subject to conditions and confirmation of no outstanding objections from Environmental Health, any other conditions suggested by Environmental Health
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The application site relates to eight agricultural fields which extends to an area of 22.4hectares. The site is located within the open countryside and within the Green Belt, as defined by the Local Plan Policies Map.
2.2The topography of the site drops gradually from south to north by approximately 10m (circa 250 – 240 AOD). The site has an irregular field pattern with field boundaries throughout the site generally defined by native hedgerows. Beyond the northern boundary of the site is the large complex of the Cellarhead substation with overhead powerlines and pylons crossing the site and wider surrounding landscape. A mature belt of landscaping surrounds the southern edge of the substation. To the east of the site are a number of agricultural, commercial and domestic buildings located in and around Wayfields Farm and Grassey Lane Farm. The site is also adjoined by agricultural fields to the north, west and south. The surrounding landscape is generally open and pastoral with a gently undulating topography, with informal field pattern, scattered farmsteads and dwellings.
1 2.3 The site is accessed via a track from Rownall Road to the east. The existing track serves both the Newfields Farm and the Cellarhead substation. The site is also accessed off a track from Rownall Road to the south. Two PROWs, cross the fields (Cheddleton 58 and 59). A PROW (Cheddleton 60) runs along the access road to Cheddleton substation, while a PROW (Cheddleton 49) runs along the access road to the south (from Rownall Road).
2.4The site lies within Flood Zone 1. The site does not include any designated heritage assets including Listed Buildings, Conservation Areas or Scheduled Ancient Monuments. There are no designated wildlife sites within the red edge. The nearest site is the Wetley Moor SSSI, located circa 900m to the west. The site does not fall within a designated landscape. The Council’s Landscape and Settlement Character Appraisal identifies that the site is located within the ‘Ancient Plateau Farmlands’ area.
2.5The site lies approximately 0.1km to the north of Werrington, when measured from the southern access track, and 1.3km to the west of Wetley Rocks.
3. DESCRIPTION OF THE PROPOSAL
3.1This is a full planning application which seeks consent for the construction of a flexible energy facility, with associated infrastructure and landscaping.
3.2The scheme proposes a facility which would include 248 no. battery containers, 62 no. transformer units, 124 no. inverter units, 4 no. switchrooms, a switchgear container and a self-contained substation within a secure acoustic fence enclosure. The installation would have an installed capacity of 400MW allowing for greater flexibility within the grid.
3.3The battery containers would be arranged in groups of 4, with a 6m separation between each group. The containers, transformer and inverter would be arranged in rows, set on concrete plinths. The switch rooms, control room and substation would be sited at the northern end of the site.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.