That the Late Representations Report be noted; 2. That the application be APPROVED for the reasons and based on the policies contained within the report, 3. That the following informatives be added; - to provide additional passing spaces on the exit to site - that the applicant undertake annual noise monitoring at the site 4. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided thar the changes do not exceed the substantive nature of the Committee’s decision. (Proposed by Councillor Parkes and seconded by Councillor Johnson)
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL PLANNING APPLICATIONS COMMITTEE
Date 19 June 2025
Application SMD/2024/0556 No: Location Land at Newfields Farm, Rownall Road, Wetley Rocks, Staffordshire, ST9 0BS Proposal Development of a Battery Energy Storage System (BESS) with ancillary infrastructure, security fence, access, landscaping and biodiversity enhancements, to provide balancing services to the local electricity grid Applicant Newfields BESS Limited Agent Parish/ward Cheddleton Date registered 27 January 2025 If you have a question about this report please contact: Rosie Dinnen [email protected].
REFERRAL
The application is major planning application and the Committee have considered similar proposals within the area and the previous planning application scheme SMD/2024/0019.
1. SUMMARY OF RECOMMENDATION
Approve, subject to conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The application site relates to a single agricultural field which extends to 2.48ha in area. The site is located within the open countryside and within the Green Belt, as defined by the Local Plan Policies Map.
2.2The site is generally open with a slight change in land levels, dropping from southeast to northwest. The northern, eastern and western boundaries generally comprise mature landscaping of hedgerows and/or trees, while the southern boundary is more open. Beyond the northern and eastern boundaries is the large complex of the Cellarhead substation. Beyond the southern boundary are the buildings associated with Newfields Farm. Fields are located beyond the western boundary. Overhead powerlines and pylons cross the surrounding landscape.
2.3The site is accessed via a track from Rownall Road to the east. The existing track serves both the Newfields Farm and the Cellarhead substation. PROW Cheddleton 48 runs adjacent to the northern and eastern boundaries, along the eastern boundary the footpath falls within the site. PROW Cheddleton 60 runs along the access track and adjacent to the southern boundary of the field.
1 2.4 Drainage ditches are located adjacent to the northern and western boundaries of the site. The site lies within Flood Zone 1. The site does not include any designated heritage assets including Listed Buildings, Conservation Areas or Scheduled Ancient Monuments. There are no designated wildlife sites within the red edge. The nearest site is the Wetley Moor SSSI, located circa 700m to the west. The site does not fall within a designated landscape. The Council’s Landscape and Settlement Character Appraisal identifies that the site is located within the ‘Ancient Plateau Farmlands’ area.
2.5The site lies approximately 1.1km to the north of Werrington and 2km to the west of Wetley Rocks. The surrounding landscape is generally open and pastoral with a gently undulating topography, with informal field pattern, scattered farmsteads and dwellings. The landscape is crossed by a network of public right of ways. However, the Cellarhead substation, which lies adjacent to the site, is a large complex which is a dominant feature within the immediate area. Overhead powerlines leading to/from the substation are also prominent on the landscape.
3. DESCRIPTION OF THE PROPOSAL
3.1This is a full planning application which seeks consent for the construction of a Battery Energy Storage System (BESS) facility, associated infrastructure and landscaping.
3.2This application is a resubmission following the refusal of SMD/2024/0019 at planning committee on 19 September 2024. The site area is the same as the previous application (2.48 hectares) but the latest application has a number of design changes to the layout of the BESS facility and the equipment being used is quieter than the previous technology due to inbuilt acoustic kit.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.