Hoylake Gardens, Ruislip - Condition of Carriageway Resurface
DecidedPlanning1 paper
Petition Hearing - Cabinet Member for Planning and Transportation decided this item on Wednesday 10 March 2010. Below is the council's own wording, with the papers it was decided on.
Resolved T hat the Cabinet Member for Planning and Transportation notes the petition and: 1. That the carriageway in Hoylake Gardens be assessed and prioritised for inclusion in the 2010/2011 resurfacing programme. Reasons for recommendation The carriageway of Hoylake Gardens can effectively be split into two sections. The first section from Southbourne Gardens to the boundary of no 11 is older than the remaining section. It is a late 1930’s concrete road, which was overlaid with a thin layer of ‘tarmac’ material 30- 40 years ago. The surface material has since deteriorated to the extent that numerous potholes have appeared. This is evident by the extensive number of irregular sized patches along this first section, which makes it difficult to differentiate between patching and surface. Extensive trenching has also been carried out, to provide service utilities to the later second section, which serves a small housing development built approximately 20 years ago. Some of these trenches now have joint cracks resulting in surface irregularities and necessary repairs. Each year, in addition to safety inspections, all of the Borough’s carriageways are surveyed and assessed for structural condition in accordance with the rules and parameters of the United Kingdom Pavement Management System (UKPMS), the results of which provide the performance indicators and prioritized listings for structural condition. The Council also carries ... view the full minutes text for item 4.
Word for word from the decision Hillingdon published for this meeting.Source: modgov.hillingdon.gov.uk
Report to Petition Hearing - Cabinet Member for Planning and Transportation
Recommendation
It is recommended that the Cabinet Member for Planning and Transportation notes the petition and:
1. Requests that the carriageway in Hoylake Gardens be assessed and prioritised for possible inclusion in a future resurfacing programme when funding priorities allow.
INFORMATION
Reasons for recommendation
The carriageway of Hoylake Gardens can effectively be split into two sections.
PART 1 – MEMBERS, PUBLIC AND PRESS
Cabinet Member meeting with Petitioners -10 March 2010 The first section from Southbourne Gardens to the boundary of no 11 is older than the remaining section. It is a late 1930’s concrete road, which was overlaid with a thin layer of ‘tarmac’ material 30- 40 years ago. The surface material has since deteriorated to the extent that numerous potholes have appeared. This is evident by the extensive number of irregular sized patches along this first section, which makes it difficult to differentiate between patching and surface.
Extensive trenching has also been carried out, to provide service utilities to the later second section, which serves a small housing development built approximately 20 years ago. Some of these trenches now have joint cracks resulting in surface irregularities and necessary repairs.
Each year, in addition to safety inspections, all of the Borough’s carriageways are surveyed and assessed for structural condition in accordance with the rules and parameters of the United Kingdom Pavement Management System (UKPMS), the results of which provide the performance indicators and prioritized listings for structural condition.
The Council also carries out its own routine inspections on ‘serviceability’ grounds for defects such as potholes and surface deterioration and some of the worst roads are included in the resurfacing programme where they are considered beyond normal patching repair and where treatment can generally enhance the visual aspect of the street as well as reducing any ongoing maintenance liabilities.
Hoylake Gardens does not feature highly on last year’s structural condition survey results but would qualify for consideration on ‘serviceability’ grounds.
Alternative options considered
Officers consider that the carriageway surface is beyond patching, thin surfacing or large permanent repairs and only a 40mm inlay will provide a surface to the road.
Comments of Policy Overview Committee(s)
None at this stage
Supporting Information
1 The most recent UKPMS structural condition survey was carried out on all Borough roads between January and March 2009. Hoylake Gardens was placed low on the advised priority list for future structural treatment, however, officers do consider that the section between Southbourne Gardens and the boundary of no 11 is high priority on surface condition and ‘Serviceability’ criteria such as appearance, ride-quality etc. At the time of the assessment, there were no potholes in evidence greater than 40mm deep, which is the minimum intervention level for immediate repair for dangerous defects.
2 Numerous patching operations have been carried out over the years. These have been of a temporary nature as the traditional patching method of cutting out neat rectangles and
PART 1 – MEMBERS, PUBLIC AND PRESS
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Petition Hearing - Cabinet Member for Planning and Transportation at Hillingdon and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.